To control the deformation difference between the to-be-installed and installed segments during the cantilever assembly of wide steel-UHPC composite girders in cable-stayed bridges and achieve precise matching, this paper first introduced a matching method combining pre-hanging cables with crane unloading. Then, by taking the Guanyin Temple Yangtze River Bridge (a super-kilometer-span cable-stayed bridge with wide steel-UHPC composite girders) as the engineering background, a locally refined finite element model was established to analyze the vertical deformation laws of the matching sections during the cantilever assembly construction phase. Finally, the effects of matching sequence, pre-hanging cable force, and crane unloading ratio on the deformation and stress of the girder segments were discussed. Calculation methods for pre-tensioning cable force and unloading ratio were proposed, and the optimal unloading scheme was determined. The results show that the method of pre-hanging cables with crane unloading can effectively reduce the vertical deformation difference between the to-be-installed and installed segments during the cantilever assembly of wide steel-UHPC composite girders, creating favorable conditions for the precise matching of the splicing between to-be-installed and installed segments.
YANGYanhua, QIYunhui. Full-scale model tests for cantilever installation of integral blocks of composite girder cable-stayed bridge[J]. Bridge Construction, 2014, 44(4): 40-44.
HAOChao, QIUSongding. The relative deformation study of flat steel box-shaped girder of long-span cable-stayed bridge during cantilever construction[J]. Steel Construction, 2002, 17(2): 34-37.
XUJinyong, YANQuansheng, WANGWeifeng,et al.Section deformation of flat hollow steel box girder of cable-stayed bridge during cantilever erection[J].Journal of South China University of Technology (Natural Science Edition),2007,35(3):127-131.
YEHuawen, GUANYue, WEIXing. Analysis of section transverse deformation of flat steel box girder of cable-stayed bridge during cantilevered assembling based on finite element method[J]. Journal of Highway and Transportation Research and Development, 2009, 26(5): 69-74.
WANGLingbo, LIUPeng, LIYuan, et al. Research on matching technology in cantilever erection for wide steel box girder of cable-stayed bridge[J]. China Journal of Highway and Transport, 2016, 29(12): 102-108, 141.
CAIYanbiao, SUNLipeng, YANGYuehua, et al. Study of main girder deformation and load bearing behavior of cable-stayed bridge during cantilever assembly of steel box-concrete composite girder[J]. World Bridges, 2022, 50(6): 86-93.
[15]
HUJ S, LIP H. Integral fabrication and hoisting technology of curved continuous steel box girder[M].Water Conservancy and Civil Construction Volume 1. London: CRC Press, 2023: 274-280.
ZOULi, NIEZhenlong, WEIJun. Study of using “girder weight transfer” technique to erect steel box girders of Pailou Changjiang River highway bridge[J]. World Bridges, 2020, 48(4): 21-24.
WUQihe, CHENMing, LUOChengbin. Research on matching technology of standard steel box girder of Sutong bridge[J]. Journal of China & Foreign Highway, 2008, 28(5): 124-127.
JIANGZhigang, TANGJiarui. Study of precise girder segment matching techniques for north main bridge of Qidu bridge in Wenzhou[J]. World Bridges, 2023, 51(sup 1): 104-109.
SUNLipeng, LIUYongjian, YANGYuehua, et al. Research on key problems of matching technology in cantilever erection of navigation opening bridge of Taizhou Bay cross-sea bridge[J]. Bridge Construction, 2018, 48(6): 116-121.
[28]
杨岳华. 宽幅组合梁斜拉桥主梁节段预制与安装力学性能研究[D]. 西安: 长安大学, 2017.
[29]
YANGYuehua. Research on mechanical properties of girder segment during precast and installation in composite cable stayed bridge with wide width[D]. Xi’an: Chang’an University, 2017.
[30]
王兴. 悬拼施工组合梁斜拉桥索梁锚固区桥面板开裂问题研究[D]. 西安: 长安大学, 2020.
[31]
WANGXing. Research on cracking of bridge deck in cable-girder anchorage zone of cable-stayed bridge with cantilever assembling construction[D]. Xi’an: Chang’an University, 2020.
YUANBo, WANGXiaolei, ZOUBenhui. Deformation analysis of cantilever assembly section of flat steel box girder of long-span cable-stayed bridge[J]. Journal of Highway and Transportation Research and Development, 2019, 15(10): 195-199.
FENGPengcheng, LIUXinhua, YIBei, et al. Concept development and overall design for main bridge of Guanyinsi Changjiang river bridge in Hubei Province[J]. Bridge Construction, 2023, 53(sup 1): 1-8.
[36]
邵旭东. 桥梁设计百问[M]. 3版. 北京: 人民交通出版社, 2017.
[37]
SHAOXudong. Questions & answers for bridge design[M]. 3rd ed. Beijing: China Communications Press, 2017.
PUJie, LIJiang, WANGTianqi, et al. An optimization method for cable tension of cable-stayed bridges[J]. Transportation Science & Technology, 2023(5): 57-61.
ZHOUYu. Transverse deformation and countermeasures of cantilever assembly of super-wide steel box girder of Zhongshan bridge over Shenzhen-Zhongshan link[J]. Journal of China & Foreign Highway, 2024, 44(4): 197-202.