PDF (1088K)
摘要
公路工程全过程造价管理贯穿项目决策、设计、招投标、施工及竣工结算全生命周期,是实现投资效益最大化与工程质量保障的重要路径。笔者基于公路工程施工与造价管控丰富实践经验,结合高速公路、国省干道、农村公路等项目案例,剖析各阶段造价管理的深层次问题:决策阶段数据量不足与估算方法滞后、设计阶段BIM技术应用不足与限额设计形式化、招投标阶段电子交易监管漏洞与信用体系不完善、施工阶段智慧管控缺失与绿色施工成本失衡、竣工结算阶段数字化审核滞后与争议调解机制不健全。针对上述问题,从技术创新、制度完善、流程再造、监管强化四个维度提出优化对策,构建“数据支撑-协同管控-智能赋能-信用约束”的全过程造价管理机制,为新时代公路行业高速发展提供部分参考。
Abstract
The whole process cost management of highway engineering runs through the entire life cycle of project decision-making, design, bidding, construction, and completion settlement, and is an important path to maximize investment benefits and ensure engineering quality. Based on rich practical experience in highway engineering construction and cost control, combined with project cases such as highways, national and provincial main roads, and rural roads, the author analyzes the deep-seated problems of cost management in each stage: insufficient data volume and lagging estimation methods in the decision-making stage, insufficient application of BIM technology and formalized limit design in the design stage, loopholes in electronic transaction supervision and imperfect credit system in the bidding stage, lack of intelligent control and imbalance of green construction costs in the construction stage, lagging digital review and dispute mediation mechanism in the completion settlement stage. In response to the above issues, optimization measures are proposed from four dimensions: technological innovation, institutional improvement, process reengineering, and regulatory strengthening, to construct a full process cost management mechanism of “data support collaborative control intelligent empowerment credit constraints”, providing partial reference for the rapid development of the highway industry in the new era.
关键词
Key words
[Author(id=1329467406264111636, tenantId=1045748351789510663, journalId=1327663118297890857, articleId=1329467405475582477, orderNo=0, firstName=null, middleName=null, lastName=null, nameCn=null, orcid=null, stid=null, country=null, authorPic=null, dead=0, email=null, emailSecond=null, emailThird=null, correspondingAuthor=0, authorType=1, ext={EN=AuthorExt(id=1329467406318637590, tenantId=1045748351789510663, journalId=1327663118297890857, articleId=1329467405475582477, authorId=1329467406264111636, language=EN, stringName=Xiaoyan Chen, firstName=Xiaoyan, middleName=null, lastName=Chen, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=null, address=Xinjiang Road and Bridge Construction Group Co., Ltd., Urumqi, Xinjiang, 830000, China, bio=null, bioImg=null, bioContent=null, aboutCorrespAuthor=null), CN=AuthorExt(id=1329467406360580631, tenantId=1045748351789510663, journalId=1327663118297890857, articleId=1329467405475582477, authorId=1329467406264111636, language=CN, stringName=陈晓燕, firstName=null, middleName=null, lastName=null, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=null, address=新疆路桥建设集团有限公司, 中国·新疆 乌鲁木齐 830000, bio={"content":"陈晓燕(1979-),女,中国山东潍坊人,本科,副高,从事公路工程成本管控、工程造价、全过程造价、精细化管理等研究。
"}, bioImg=null, bioContent=陈晓燕(1979-),女,中国山东潍坊人,本科,副高,从事公路工程成本管控、工程造价、全过程造价、精细化管理等研究。
, aboutCorrespAuthor=null)}, companyList=[AuthorCompany(id=1329467406197002768, tenantId=1045748351789510663, journalId=1327663118297890857, articleId=1329467405475582477, xref=null, ext=[AuthorCompanyExt(id=1329467406209585681, tenantId=1045748351789510663, journalId=1327663118297890857, articleId=1329467405475582477, companyId=1329467406197002768, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=Xinjiang Road and Bridge Construction Group Co., Ltd., Urumqi, Xinjiang, 830000, China), AuthorCompanyExt(id=1329467406222168594, tenantId=1045748351789510663, journalId=1327663118297890857, articleId=1329467405475582477, companyId=1329467406197002768, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=新疆路桥建设集团有限公司, 中国·新疆 乌鲁木齐 830000)])])]
陈晓燕.
公路工程全过程造价管理关键问题分析[J].
公路工程杂志, 2026, 2(1): 50-52 DOI:
| [1] |
交通运输部. 2024年交通运输行业发展统计公报[R].2025.
|
| [2] |
中国公路学会. 公路工程造价管理发展报告(2023)[R].2024.
|
| [3] |
住房和城乡建设部. 建设工程造价管理规范(GB/T 51262—2017)[S].2017.
|
| [4] |
王军. 山区公路项目造价超支成因及控制措施 [J].中国公路学报,2023,36 (4):298-306.
|
| [5] |
李娟. 基于AI的公路工程投资估算精准预测模型研究 [J].公路交通科技,2022, 39(11):167-173.
|