To investigate the seismic performance of vertical connections in modular concrete wall panels, three types of vertical connections were designed: monolithic casting, grouted anchor with through-bar connection, and bolted connection. Low-cycle reversed loading tests were conducted to systematically evaluate their failure modes, energy dissipation, stiffness degradation, and strength degradation. The results indicate that the monolithic and grouted anchor specimens developed cracks propagating from the corners toward the diagonals, accompanied by severe concrete damage at the bottom, whereas the bolted specimens sustained the most extensive damage at the slab-wall interface. All specimens exhibited excellent energy dissipation capacity regardless of connection type, with equivalent viscous damping ratios exceeding 0.1. The displacement ductility coefficients of the monolithic and grouted anchor specimens were approximately 1.3 in both the forward and reverse directions, whereas those of the bolted specimens exceeded 2.1. The stiffness degradation behavior of the grouted anchor specimens closely resembled that of the monolithic specimens, with comparable stiffness values, whereas the bolted specimens exhibited notably lower stiffness. Before yielding, the strength degradation trends were similar across all three connection types; however, beyond the ultimate bearing capacity, the bolted specimens degraded at a slower rate, suggesting that bolted vertical connections in modular concrete wall panels offer favorable damage resistance.
负向位移加载至-2.49 mm时,墙体半高处新增3条水平裂缝;正向位移达到2.74 mm左右,该高度处产生首条斜裂缝;负向位移至-4.46 mm 时,墙体半高处再新增1条水平裂缝。当正向位移加载至6.66 mm时,墙体东侧墙角发育两条水平裂缝与两条斜裂缝,裂缝最大宽度达0.14 mm;负向位移至-9.13 mm时,西侧墙角出现4条水平裂缝、两条斜裂缝,最大裂缝宽度同样为0.14 mm。位移加载至10.12 mm 时,墙体两侧墙角密布多条水平及斜向裂缝,最大裂缝宽度扩展至0.2 mm;负向位移达到-12.12 mm时,两侧墙角持续新生裂缝,墙身纵向钢筋应变达到屈服应变,试验转入屈服后位移控制加载阶段。
屈服后以 0.5 倍屈服位移为增量逐级加载,每级循环3次。1倍Δy(屈服位移,下文同)加载阶段,墙角新增1条斜裂缝,原有斜裂缝持续延伸贯通,形成宽度0.58 mm 的主斜裂缝;加载至1.5倍Δy时,墙体角部混凝土发生压溃剥落,左下角钢筋大面积外露。随循环次数持续增加,墙体混凝土压碎区域不断扩大,试件水平承载力降至峰值荷载的85%以下,试验终止。试件S1完整破坏演化过程如图6所示。
AliJ A, PanW, ChenL, et al. A systemic exploration of drivers for and constraints on construction productivity enhancement[J]. Built Environment Project and Asset Management, 2018, 8(3): 239-252.
[2]
BaiJ L, YangB, XieB, et al. Design and experimental study on RC modular superimposed shear wall boundary elements with new inter-module connections[J]. Journal of Building Engineering, 2024, 95: 110193.
FerdousW, BaiY, NgoT D, et al. New advancements, challenges and opportunities of multi-storey modular buildings:a state-of-the-art review[J]. Engineering Structures, 2019, 183: 883-893.
[7]
YeZ H, GiriunasK, SezenH, et al. State-of-the-art review and investigation of structural stability in multi-story modular buildings[J]. Journal of Building Engineering, 2021, 33: 101844.
[8]
ShiF W, LiY M. Innovative inner sleeve composite bolted connections for modular steel constructions: experimental and numerical studies[J]. Journal of Building Engineering, 2023, 64: 105624.
[9]
ThaiH T, NgoT, UyB. A review on modular construction for high-rise buildings[J]. Structures, 2020, 28: 1265-1290.
[10]
QinJ J, TanP, ZhouF L, et al. Cyclic response of innovative modular joints for modular buildings under bidirectional loading[J]. Thin-Walled Structures, 2024, 200: 111889.
[11]
XieX Y, WangD, QianY M, et al. Summary of research status of assembly nodes[J]. IOP Conference Series: Earth and Environmental Science, 2019, 330(2): 022072.
LiuYan, ChenYang, LiuXingwang, et al. Research on tensile performance of new self-locking-unlockable joints of steel structure modules[J]. Ordnance Material Science and Engineering, 2024, 47(3): 49-58.
WangGuanchao, ZhouLingyu, ChenHao, et al. Bending and shear behavior of socketed joint in modular steel structure unit house[J]. Journal of Railway Science and Engineering, 2024, 21(11): 4663-4676.
LiMingyu, YangYiting, WangYan, et al. Mechanical properties of inner sleeve connection joint of new modular steel frame[J]. Progress in Steel Building Structures, 2025, 27(2): 91-103.
YueQingrui, WuChaoyun, LiuXiaogang, et al. Research progress and Future Trends of multi-story and high-rise modular structures and construction technologies [J]. Journal of Building Structures,2024, 45(8): 1-19.
ZhaoZhichao. Study on mechanical properties of the new type dry connection between prefabricated concrete shear wall and floor slab[D]. Shanghai: Shanghai Institute of Technology, 2022:22-40.
MaShaochun, ZhuYa, YeXiaobin, et al. Influence of cast-in-situ connection and sleeve assembly connection on the seismic performance of wall plate joints[J]. Advanced Engineering Sciences, 2025, 57(1): 157-166.
XiongFeng, WuChao'an, RanMingming, et al. Constitutive model of bolted connections and modeling method of bolt connected precast concrete wall panel structure[J]. Advanced Engineering Sciences, 2025, 57(1): 145-156.
[30]
LaceyA W, ChenW S, HaoH, et al. Review of bolted inter-module connections in modular steel buildings[J]. Journal of Building Engineering, 2019, 23: 207-219.
[31]
JGJ 3—2010 高层建筑混凝土结构技术规程 [S].
[32]
JGJ 3—2010 Technical specification for concrete structures of tall building [S].
[33]
GB/T 50081—2019 混凝土物理力学性能试验方法标准 [S].
[34]
GB/T 50081—2019 Standard for test methods of concrete physical and mechanical properties [S].
[35]
GB/T 228.1—2021 金属材料 拉伸试验 第1部分: 室温试验方法 [S].
[36]
GB/T 228.1—2021 Metallic materials—tensile testing—part 1: method of test at room temperature [S].
[37]
JGJ/T 101—2015 建筑抗震试验规程 [S].
[38]
JGJ/T 101—2015 Specification for seismic test of buildings [S].
LiuMinmin, WangZhenyu, LiuHao, et al. Experimental study on seismic performance of prefabricated concrete shear walls connected by high-strength bolts[J]. Building Structure, 2024, 54(10): 8-13, 117.