Earthquakes are characterized by their sudden onset and severe destructiveness, often resulting in substantial human and economic losses. Consequently, effective post-earthquake emergency response is critical. To address the problem of emergency material scheduling following earthquakes, this study develops a two-stage scheduling model that divides material transportation into allocation and dispatch phases. In the first stage, rescue resources are optimally allocated, whereas in the second stage, these resources are dispatched to ensure timely coverage of all affected areas. A combined land-air transportation mode is adopted, and a mixed-integer programming model is formulated with the objective of minimizing overall coverage time while comprehensively accounting for multiple operational factors. The optimization model is implemented and solved using Python and Gurobi. Its effectiveness and robustness are evaluated through a case study and sensitivity analysis based on the Wenchuan M8.0 earthquake in 2008. The results demonstrate that the proposed model can provide effective decision support for post-earthquake emergency rescue operations and has practical value for emergency rescue command centers. Future research may further investigate rescue resource deployment under uncertain conditions.
设集合 I 表示应急物资基站,下标i表示某一基站的索引;集合 J 表示受灾区域,下标j表示某一区域的索引。从基站i到受灾区域j的距离记为,并假定救援车辆始终选择由表示的最短导航路线。设 K 表示可调用救援资源类型k的集合,包括大型卡车、中型货车及直升机,其速度和救援能力分别用和表示。救援资源k从基站i到受灾区域j的行驶时间由和决定,即=/。对于受灾区域j,救援车队的响应时间和救援能力取决于所选择的应急物资配送车辆,即应急救援资源的选择决定了该区域的物资送达时间和救援能力。合理的部署和救援资源选择决定了最小覆盖时间。本文的覆盖时间最小化问题属于混合整数规划问题,其目标为最小化到达各受灾区域的覆盖时间,约束条件则描述了救援工具部署计划、任务分配计划、救援资源属性、物资储备基站位置,以及救援能力要求之间的相互联系。基线模型假定需求量为确定值,用于生成可执行的部署与调度方案。为检验模型对不确定性的抵御能力,将在第3.4节引入基于灾害强度的需求外推与概率性断网场景进行风险评估。综上,该问题的数学模型如下:
给定分配计划 X,式(15)和式(16)用于标记:若分配给基站i的容量不小于c,则;否则。式(17)和式(18)确保分配计划 X 中每个已分配的应急物资基站均能满足受灾区域的需求,其中card表示集合的基数。式(19)保证所有应急物资基站的运输救援资源均能满足受灾区域的物资需求,且任何被分配到基站的救援资源都不是多余的。当或或时,式(19)成立;当且,式(19)简化为,以确保分配到受灾区域的救援资源都不是多余的,除非所有基站均具备足够容量。式(20)促使求解器找到包含失效配送中心的分配计划。CRCO问题的目标是在多个资源约束下,寻找最优的资源配置或任务调度方案。
本文提出的覆盖时间最小化问题由应急车辆分配计划 X 和调度计划 Y 共同确定,变量 Z 可通过 X 和 Y,由式(5)~(7)唯一确定。通过分离决策矩阵 X 和 Y,该问题可转化为两阶段最小覆盖时间(Minimal Covering Time, MCT)问题:第一阶段确定应急救援资源在各应急物资基站间的最优分配方案,即MCT分配问题;第二阶段在给定分配方案下以最优方式调度救援资源,使其覆盖所有受灾区域,称为MCT调度子问题。下文将对这两阶段问题进行反向分析。
1.5.1 MCT分配问题
用表示在给定分配方案 X 下,MCT调度子问题在区域集合 J 上的最优目标值;若子问题无可行解,则其值为无穷大。同理,用表示更小区域集合对应的最优值。为单个区域j的调度最优解,代表分配方案 X 下将足够的救援资源部署到区域j的最短响应时间,即该区域的覆盖时间。因此,取集合 J 内所有区域覆盖时间的最大值,即:
Zheng Guoguang, Liu Kai. Research report on the risk survey of natural disasters in China ( 2020—2022)[M]//Ma Baocheng. Annual Report on Emergency Management in China: 2023. Beijing: Social Sciences Academic Press, 2023: 52-67.
[3]
ZhangB, LiH, LiS G, et al. Sustainable multi-depot emergency facilities location-routing problem with uncertain information[J]. Applied Mathematics and Computation, 2018, 333: 506-520.
[4]
ÖzdamarL, DemirO. A hierarchical clustering and routing procedure for large scale disaster relief logistics planning[J]. Transportation Research Part E: Logistics and Transportation Review, 2012, 48(3): 591-602.
Ministry of Emergency Management of the People's Republic of China. The 14th Five-Year Plan for emergency rescue force construction[EB/OL]. (2022-06-22) [2025-04-20].
[7]
ZhangH Z, ZhaoX H, FangX, et al. Proactive resource request for disaster response: a deep learning-based optimization model[J]. Information Systems Research, 2024, 35(2): 528-550.
[8]
ChenT G, WuS W, YangJ J, et al. Risk propagation model and its simulation of emergency logistics network based on material reliability[J]. International Journal of Environmental Research and Public Health, 2019, 16(23): 4677.
LiXiaoping, LuJiayun, HuQingmi. Resilience evaluation system for earthquake prevention and disaster reduction in urban shelters: a case study of the Shanghai urban area[J]. China Earthquake Engineering Journal, 2024, 46(1): 214-223.
GeHaoyu, CaoWeidong, SongWeixuan. Precision scale-based research on the spatiotemporal coverage efficacy of urban emergency shelters: a case study in the main urban area of Nanjing[J]. Geographical Research, 2024, 43(11): 2887-2901.
YaoWenmo, XuXinchen, ChenDandi. Analysis of the spatial accessibility of emergency medical resource allocation: a case study of Chengdu[J]. Modern Preventive Medicine, 2024, 51(17): 3185-3190.
WangGuobao, CaiShuiyong, YangHonggang, et al. Emergency material demand prediction based on the early stage of earthquakes[J]. China Earthquake Engineering Journal, 2025, 47(4): 925-936.
[17]
AnsariS, MclayL A, MayorgaM E. A maximum expected covering problem for district design[J]. Transportation Science, 2015, 51(1): 376-390.
[18]
BolouriS, VafaeinejadA, AlesheikhA, et al. The ordered capacitated multi-objective location-allocation problem for fire stations using spatial optimization[J]. ISPRS International Journal of Geo-Information, 2018, 7(2): 44.
ChenGangtie, BinShuai. Optimizing emergency road repair and distribution of relief supplies after earthquake[J]. China Safety Science Journal, 2012, 22(9): 166-171.
ZhangGuofu, ZhuQianshun, SuZhaopin, et al. Joint scheduling of road network restoration and emergency relief supplies delivery based on double-layer interactive Q-learning[J]. Control and Decision, 2024, 39(12): 4109-4117.
WuRengyu, ZhouQiang, YuHailong, et al. Ambulance dispatching algorithm in Shenzhen based on deep reinforcement learning[J]. Computer Engineering, 2022, 48(9): 298-304.
WangFuyu, YeChunming, WangTao, et al. Research on two stage planning model and algorithm of wounded rescue vehicle after earthquake[J]. Journal of Management Sciences in China, 2018, 21(2): 68-79.
[27]
BodaghiB, ShahparvariS, FadakiM, et al. Multi-resource scheduling and routing for emergency recovery operations[J]. International Journal of Disaster Risk Reduction, 2020, 50: 101780.
[28]
XuJ P, ZhouX Y. Approximation based fuzzy multi-objective models with expected objectives and chance constraints: application to earth-rock work allocation[J]. Information Sciences, 2013, 238(7): 75-95.
[29]
RudinW. Principles of mathematical analysis[M]. 3rd ed. New York: McGraw-Hill, 1976: 90.
ZhengBin, MaZujun, ZhouYufeng. Bi-level model for dynamic location-transportation problem for post-earthquake relief distribution[J]. Journal of Systems & Management, 2017, 26(2): 326-337.