小样本下岩体参数不确定性表征与围岩卸荷稳定性概率评价方法
刘国锋 , 李琦 , 冯坤 , 刘健 , 丰光亮 , 邱士利 , 裴书锋
地球科学 ›› 2026, Vol. 51 ›› Issue (10) : 3739 -3754.
小样本下岩体参数不确定性表征与围岩卸荷稳定性概率评价方法
Characterization of Uncertainty in Rock Mass Parameters under Small Samples and Probabilistic Evaluation Method for Unloading Stability
对于地质信息揭露有限的工程,如何合理评估力学参数与围岩稳定性,仍缺乏适用方法.提出了一种小样本条件下岩体力学参数表征与围岩稳定性评价方法.基于室内试验获取岩石弹性模量与抗剪强度小样本数据,根据Hoek-Brown准则,融合贝叶斯推断与马尔科夫链蒙特卡洛(MCMC)抽样建立表征岩体力学参数不确定性的概率模型;进一步结合Monte Carlo模拟与点估计法,建立围岩卸荷位移与破裂区深度的概率评价方法.以白鹤滩水电站地下厂房为例,确定了岩体弹性模量、黏聚力、内摩擦角及抗拉强度的概率分布,并给出围岩变形与破裂深度的概率评价.与现场监测对比表明,本方法计算结果可靠,为地下洞室围岩稳定性评估提供了有效的技术途径.
In underground engineering with limited geological data, effective methods for evaluating rock mass stability are urgently needed. A method for characterizing rock mass mechanical parameters and evaluating the stability of surrounding rock under small sample conditions has been proposed. Based on small sample data obtained from laboratory tests of rock elastic modulus and shear strength, a probabilistic model characterizing the uncertainty of rock mass mechanical parameters was developed by integrating Bayesian inference with Markov Chain Monte Carlo (MCMC) sampling. Further, by combining Monte Carlo simulation with point estimation method, a probabilistic evaluation method for the surrounding rock unloading displacement and the depth of the fracture zone was established. Taking the underground powerhouse of Baihetan Hydropower Station as an example, the probability distribution of the elastic modulus, cohesion, internal friction angle and tensile strength of the rock mass was determined, and the probabilistic evaluation of the deformation and fracturing depth of the surrounding rock was given. Comparison with on-site monitoring indicates that the calculation results of this method are reliable, providing an effective technical approach for evaluating the stability of surrounding rock in underground caverns.
| [1] |
Adoko, A. C., Gokceoglu, C., Yagiz, S., 2017. Bayesian Prediction of TBM Penetration Rate in Rock Mass. Engineering Geology, 226: 245-256. https://doi.org/10.1016/j.enggeo.2017.06.014 |
| [2] |
Aladejare, A. E., Wang, Y., 2019. Estimation of Rock Mass Deformation Modulus Using Indirect Information from Multiple Sources. Tunnelling and Underground Space Technology, 85: 76-83. https://doi.org/10.1016/j.tust.2018.11.047 |
| [3] |
Cai, M., 2011. Rock Mass Characterization and Rock Property Variability Considerations for Tunnel and Cavern Design. Rock Mechanics and Rock Engineering, 44(4): 379-399. https://doi.org/10.1007/s00603-011-0138-5 |
| [4] |
Cao, Z. J., Wang, Y., 2014. Bayesian Model Comparison and Characterization of Undrained Shear Strength. Journal of Geotechnical and Geoenvironmental Engineering, 140(6): 04014018. https://doi.org/10.1061/(asce)gt.1943-5606.0001108 |
| [5] |
Chen, D. F., Xu, D. P., Ren, G. F., et al., 2019. Simulation of Cross-Correlated Non-Gaussian Random Fields for Layered Rock Mass Mechanical Parameters. Computers and Geotechnics, 112: 104-119. https://doi.org/10.1016/j.compgeo.2019.04.012 |
| [6] |
Contreras, L. F., Brown, E. T., Ruest, M., 2018. Bayesian Data Analysis to Quantify the Uncertainty of Intact Rock Strength. Journal of Rock Mechanics and Geotechnical Engineering, 10(1): 11-31. https://doi.org/10.1016/j.jrmge.2017.07.008 |
| [7] |
Duan, S. Q.,Feng, X. T., Jiang, Q.,et al., 2017. In Situ Observation of Failure Mechanisms Controlled by Rock Masses with Weak Interlayer Zones in Large Underground Cavern Excavations under High Geostress. Rock Mechanics and Rock Engineering, 50(9):2465-2493.https://doi.org/10.1007/s00603-017-1249-4 |
| [8] |
Feng, X. D., Jimenez, R., 2014. Bayesian Prediction of Elastic Modulus of Intact Rocks Using Their Uniaxial Compressive Strength. Engineering Geology, 173: 32-40. https://doi.org/10.1016/j.enggeo.2014.02.005 |
| [9] |
Hoek, E., Carranza-Torres, C., Corkum, B., 2002. Hoek-Brown Failure Criterion—2002 Edition. Proceedings of the North American Rock Mechanics Society NARMS-TAC 2002. University of Toronto Press, Toronto, 267-273. |
| [10] |
Hoek, E., Wood, D., Shah, S., 1992. A Modified Hoek-Brown Failure Criterion for Jointed Rock Masses. Thomas Telford Publishing, Chester. |
| [11] |
Huadong Engineering Corporation Limited of Hydro China Corporation, 2014. Consulting Materials on the First Layer and Subsequent Excavation and Supporting of Baihetan Hydropower Station, Jinsha River. Hydro China Huadong Engineering Corporation, Hangzhou(in Chinese). |
| [12] |
Jiang, Q., Feng, X. T., Chen, G. Q., 2008. Study on Constitutive Model of Hard Rock Considering Surrounding Rock Deterioration under High Geostresses. Chinese Journal of Rock Mechanics and Engineering, 27(1): 144-152 (in Chinese with English abstract). |
| [13] |
Jiang, Q., Feng, X. T., Li, S. J., et al., 2019. Cracking-Restraint Design Method for Large Underground Caverns with Hard Rock under High Geostress Condition and Its Practical Application. Chinese Journal of Rock Mechanics and Engineering, 38(6): 1081-1101 (in Chinese with English abstract). |
| [14] |
Jiang, Q., Liu, J., Zheng, H., et al., 2022. Bayesian Estimation of Rock Mechanical Parameter and Stability Analysis for a Large Underground Cavern. International Journal of Geomechanics, 22(8): 04022129. https://doi.org/10.1061/(asce)gm.1943-5622.0002452 |
| [15] |
Jiang, S. H., Zhong, Y., Huang, Y. Z., et al., 2025. Expected Effectiveness Evaluation and Optimization Methods of Slope Site Investigation Program. Earth Science, 50(6): 2255-2269 (in Chinese with English abstract). |
| [16] |
Li, J. D., Yang, T. H., Liu, F. Y., et al., 2024. Modeling Spatial Variability of Mechanical Parameters of Layered Rock Masses and Its Application in Slope Optimization at the Open-Pit Mine. International Journal of Rock Mechanics and Mining Sciences, 181: 105859. https://doi.org/10.1016/j.ijrmms.2024.105859 |
| [17] |
Liu, G. F., Feng, X. T., Jiang, Q., et al., 2017. In Situ Observation of Spalling Process of Intact Rock Mass at Large Cavern Excavation. Engineering Geology, 226: 52-69. https://doi.org/10.1016/j.enggeo.2017.05.012 |
| [18] |
Liu, G. F., Zhou, C., Feng, K., et al., 2024. Probabilistic Evaluation Method for the Stability of Large Underground Cavern Considering the Uncertainty of Rock Mass Mechanical Parameters: A Case Study of Baihetan Underground Powerhouse Project. Engineering Geology, 340: 107660. https://doi.org/10.1016/j.enggeo.2024.107660 |
| [19] |
Liu, G. F., Zhou, C., Li, Z. Q., et al., 2022. Sensitivity Analysis on the Estimation of Mechanical Parameters for Rock Mass around Large Cavern Based on RMR and H-B Criterion. Journal of Northeastern University (Natural Science), 43(8): 1149-1158 (in Chinese with English abstract). |
| [20] |
Liu, J., Jiang, Q., Chen, T., et al., 2022. Bayesian Estimation for Probability Distribution of Rock’s Elastic Modulus Based on Compression Wave Velocity and Deformation Warning for Large Underground Cavern. Rock Mechanics and Rock Engineering, 55(6): 3749-3767. https://doi.org/10.1007/s00603-022-02801-2 |
| [21] |
Marinos, P., Hoek, E., 2001. Estimating the Geotechnical Properties of Heterogeneous Rock Masses Such as Flysch. Bulletin of Engineering Geology and Environment, 60(2): 85-92. https://doi.org/10.1007/s100640000090 |
| [22] |
Pang, R., Yao, H. Y., Xu, M. Y., et al., 2024. Slope Displacement Reliability Analysis Considering Rock Parameters Spatial Variability Subjected to Stochastic Mainshock-Aftershock Earthquake. Reliability Engineering & System Safety, 251: 110337. https://doi.org/10.1016/j.ress.2024.110337 |
| [23] |
Robert, C., Casella, G., 2011. A Short History of Markov Chain Monte Carlo: Subjective Recollections from Incomplete Data. Statistical Science, 26(1): 102-115. https://doi.org/10.1214/10-STS351 |
| [24] |
Rosenblueth, E., 1975. Point Estimates for Probability Moments. Proceedings of the National Academy of Sciences of the United States of America, 72(10): 3812-3814. https://doi.org/10.1073/pnas.72.10.3812 |
| [25] |
Sari, M., Karpuz, C., Ayday, C., 2010. Estimating Rock Mass Properties Using Monte Carlo Simulation: Ankara Andesites. Computers & Geosciences, 36(7): 959-969. https://doi.org/10.1016/j.cageo.2010.02.001 |
| [26] |
Tao, Y. Q., Sun, H. L., Cai, Y. Q., 2021. Bayesian back Analysis Considering Constraints. Chinese Journal of Geotechnical Engineering, 43(10): 1878-1886 (in Chinese with English abstract). |
| [27] |
Wang, L. F., Liu, X. L., Xu, K., et al., 2024. Bayesian-MCMC (Markov Chain Monte Carlo) Based Three-Dimensional Geological Model Optimization by Data and Knowledge Fusion. Earth Science, 49(8): 3056-3070 (in Chinese with English abstract). |
| [28] |
Wang, Y., Akeju, O. V., 2016. Quantifying the Cross-Correlation between Effective Cohesion and Friction Angle of Soil from Limited Site-Specific Data. Soils and Foundations, 56(6): 1055-1070. https://doi.org/10.1016/j.sandf.2016.11.009 |
| [29] |
Xu, L., Qi, Y. T., Zhao, T. Y., 2026. Bayesian Updating Method of Excavation Considering Various Uncertainties and Stage Correlation. Earth Science, 51(2): 361-374 (in Chinese with English abstract). |
| [30] |
Zhang, J. Z., Jiang, Q. H., Zhang, D. M., et al., 2024. Influence of Geological Uncertainty and Soil Spatial Variability on Tunnel Deformation and Their Importance Evaluation. Tunnelling and Underground Space Technology, 152: 105930. https://doi.org/10.1016/j.tust.2024.105930 |
| [31] |
Zhang, W. G., Wang, Q., Liu, H. L., et al., 2021. Influence of Rock Mass Spatial Variability on Probability of Tunnel Roof Wedge Failure. Rock and Soil Mechanics, 42(5): 1462-1472 (in Chinese with English abstract). |
| [32] |
Zhou, J., Qiu, Y. G., Zhu, S. L., et al., 2021. Estimation of the TBM Advance Rate under Hard Rock Conditions Using XGBoost and Bayesian Optimization. Underground Space, 6(5): 506-515. https://doi.org/10.1016/j.undsp.2020.05.008 |
| [33] |
Zhu, H. H., Zhang, Q., Zhang, L. Y., 2013. Review of Research Progresses and Applications of Hoek-Brown Strength Criterion. Chinese Journal of Rock Mechanics and Engineering, 32(10): 1945-1963 (in Chinese with English abstract). |
国家自然科学基金资助项目(52578462)
国家自然科学基金资助项目(52409146)
/
| 〈 |
|
〉 |