摘要

为探明全长预应力锚杆对剪切滑移体的抗剪性能,基于剪切滑移理论提出了一种计算滑移体所需最小支护抗力的方法,推导了全长预应力锚杆的中性点位置和支护力计算方法,并应用于隧道案例中验证其合理性。研究表明:用滑移体面积和围岩等级计算滑移体所需最小抗力的方法相比于传统的方法计算简便、安全度高。在规定范围内:增大锚杆直径,中性点位置向锚杆尾部移动;增大预应力,中性点位置向锚杆端部移动,两者对锚杆中性点位置的影响不同,但均能使锚杆轴力和径向支护抗力成正比例关系增大。采用锚喷支护时锚杆所能提供的径向支护抗力很小,建议根据滑移面处剪力值设计锚杆参数,适当增大直径和预应力,提高抗剪性能的同时也能提高径向支护抗力。研究成果可为全长预应力锚杆的抗剪性能计算提供参考。

Abstract

In order to find out the shear resistance of the full-length prestressed bolt to the shear-slip body,based on the shear-slip body theory,a method to calculate the minimum support resistance of the slip body was proposed,the neutral point position and supporting force calculation method was deduced,and the rationality of the method was verified. The results show that calculating the minimum resistance required,by using the slip body area and grade of the surrounding rock,is simpler and safer than the traditional method. The neutral point position of the full-length prestressed bolt is affected by the diameter and the prestressed. Within the specified range:increasing the diameter of the bolt,the neutral point position moves to the bolt's tail;increasing the prestress of the bolt,the neutral point position moves to the bolt's head. Although they have different effects on the neutral point position of the bolt,both can increase the axial force and the radial support resistance proportionally. At the same time,because radial supporting resistance provided by the bolt is small when adopting the support by shotcrete-bolt,we suggest designing the bolt parameters according to the shear value at the sliding plane,and taking the bolt's shear performance into consideration. Increasing the diameter and prestress appropriately can improve not only the shear performance but also the radial support resistance. The research results can provide reference for the calculation of shear performance of full-length prestressed bolt.

关键词

软岩隧道 / 剪切滑移理论 / 锚喷支护 / 中性点 / 支护抗力

Key words

soft rock tunnel / shear slip theory / shotcrete-bolt support / neutral point / support resistance

引用本文

引用格式 ▾
陈志敏,王洪,李亚子,龚军,李增印. 考虑抗剪性能的全长预应力锚杆支护力计算方法[J]. 应用力学学报, 2025, 42(5): 1098-1105 DOI:10.11776/j.issn.1000-4939.2025.05.012

登录浏览全文

4963

注册一个新账户 忘记密码

参考文献

[1]

左双英, 付丽, 李豪逸, 等. 基于剪切滑移线理论的软岩连拱隧道喷锚支护数值模拟[J]. 隧道与地下工程灾害防治, 2020, 2(4): 44-51.

[2]

ZUO Shuangying, FU Li, LI Haoyi, et al. Numerical simulation of shotcrete-anchor support for duplex arch tunnel in soft rock based on shear-slip line theory[J]. Hazard control in tunnelling and underground engineering, 2020, 2(4): 44-51(in Chinese).

[3]

BOBRYAKOV A P, REVUZHENKO A F. Experimental simulation of spiral slip lines on granular materials[J]. Journal of mining science, 2009, 45(2): 99-104.

[4]

GAO S M, CHEN J P, ZUO C Q, et al. Structure optimization for the support system in soft rock tunnel based on numerical analysis and field monitoring[J]. Geotechnical and geological engineering, 2016, 34(4): 1089-1099.

[5]

陈红军, 刘新荣, 杜立兵, 等. 浅埋层状岩体偏压隧道滑移破坏机理及判定方法[J]. 地下空间与工程学报, 2021, 17(6): 1733-1741.

[6]

CHEN Hongjun, LIU Xinrong, DU Libing, et al. Sliding failure mechanism and its criterion of unsymmetrical loading shallow buried tunnel in layered rock mass[J]. Chinese journal of underground space and engineering, 2021, 17(6): 1733-1741(in Chinese).

[7]

LIU X L, SUN F Y, KONG F L, et al. Experimental investigation on mechanical behavior of anchor and shotcrete support system under axial pull-out action[J]. Geotechnical and geological engineering, 2022, 40(1): 383-393.

[8]

GONG C Y, HE X Y, LI Y W, et al. Long-term field corrosion monitoring in supporting structures of China Xiamen Xiangan Subsea Tunnel[J]. Acta metallurgica Sinica(English letters), 2017, 30(4): 399-408.

[9]

LIU W P, WAN S F, FU M F. Limit support pressure on tunnel face at different construction line slopes by slip line method[J]. Tunnelling and underground space technology, 2020, 106: 103619.

[10]

肖明清, 封坤, 李策, 等. 复合地层盾构隧道围岩压力计算方法研究[J]. 岩石力学与工程学报, 2019, 38(9): 1836-1847.

[11]

XIAO Mingqing, FENG Kun, LI Ce, et al. A method for calculating the surrounding rock pressure of shield tunnels in compound strata[J]. Chinese journal of rock mechanics and engineering, 2019, 38(9): 1836-1847(in Chinese).

[12]

王永甫, 王成, 唐晓松. 基于非关联流动法则的圆形隧洞滑移线解答[J]. 应用数学和力学, 2013, 34(12): 1285-1290.

[13]

WANG Yongfu, WANG Cheng, TANG Xiaosong. Slip line solution for circular tunnels based on the non-associated flow rule[J]. Applied mathematics and mechanics, 2013, 34(12): 1285-1290(in Chinese).

[14]

郭小龙, 谭忠盛, 李磊, 等. 高地应力陡倾层状软岩隧道变形破坏机理分析[J]. 土木工程学报, 2017, 50(增刊2): 38-44.

[15]

GUO Xiaolong, TAN Zhongsheng, LI Lei, et al. Deformation and failure mechanism of layered soft rock tunnel under high stress[J]. China civil engineering journal, 2017, 50(S2): 38-44(in Chinese).

[16]

FREEMAN T J. The behaviour of fully-bonded rock bolts in the Kielder experimental tunnel[J]. Tunnels & tunnelling international, 1978, 10(5): 37-40.

[17]

王明恕. 全长锚固锚杆机理的探讨[J]. 煤炭学报, 1983(1): 40-47.

[18]

WANG Mingshu. Mechanism of full-column rock bolt[J]. Journal of China Coal Society, 1983(1): 40-47(in Chinese).

[19]

姚显春, 李宁, 陈蕴生. 隧洞中全长粘结式锚杆的受力分析[J]. 岩石力学与工程学报, 2005, 24(13): 2272-2276.

[20]

YAO Xianchun, LI Ning, CHEN Yunsheng. Theoretical solution for shear stresses on interface of fully grouted bolt in tunnels[J]. Chinese journal of rock mechanics and engineering, 2005, 24(13): 2272-2276(in Chinese).

[21]

朱永全, 宋玉香. 隧道工程[M]. 北京: 中国铁道出版社, 2020.

[22]

刘强. 襄渝铁路二线挤压性炭质片岩隧道大变形成因与控制技术研究[D]. 石家庄: 石家庄铁道大学, 2017.

[23]

谢云鹏, 陈秋南, 汪祥国, 等. 基于改进山本法的浅埋隧道支护结构受力特性研究[J]. 应用力学学报, 2023, 40(5): 1096-1105.

[24]

XIE Yunpeng, CHEN Qiunan, WANG Xiangguo, et al. Study on mechanical characteristics of improved shallow tunnel supporting structure based on Yamamoto method[J]. Chinese journal of applied mechanics, 2023, 40(5): 1096-1105(in Chinese).

[25]

陈子全, 何川, 吴迪, 等. 高地应力层状软岩隧道大变形预测分级研究[J]. 西南交通大学学报, 2018, 53(6): 1237-1244.

[26]

CHEN Ziquan, HE Chuan, WU Di, et al. Study of large deformation classification criterion for layered soft rock tunnels under high geostress[J]. Journal of Southwest Jiaotong University, 2018, 53(6): 1237-1244(in Chinese).

[27]

钟友江, 刘世杰, 吴建和. 双层初期支护在云屯堡隧道高地应力软岩洞段中的应用[J]. 隧道建设:中英文, 2020, 40(1): 90-98.

[28]

ZHONG Youjiang, LIU Shijie, WU Jianhe. Application of double primary support to high geostress soft rock section of Yuntunbao tunnel[J]. Tunnel construction, 2020, 40(1): 90-98(in Chinese).

[29]

郭尚坤. 深埋老黄土隧道大变形机理及对策研究[D]. 成都: 西南交通大学, 2017.

[30]

谭显坤, 左昌群, 刘代国, 等. 软岩大变形隧道锚喷支护的力学效应及失效原因分析[J]. 科学技术与工程, 2015, 35(8): 228-232.

[31]

TAN Xiankun, ZUO Changqun, LIU Daiguo, et al. Analysis of bolt and shotcrete support in soft large-deformation tunnel[J]. Science technology and engineering, 2015, 35(8): 228-232(in Chinese).

[32]

国家铁路局. 铁路隧道设计规范:TB 10003-2016[S]. 北京: 中国铁道出版社, 2016.

[33]

中华人民共和国住房和城乡建设部. 岩土锚杆与喷射混凝土支护工程技术规范:GB 50086-2015[S]. 北京: 中国计划出版社, 2015.

[34]

刘才华, 李育宗. 考虑横向抗剪效应的节理岩体全长黏结型锚杆锚固机制研究及进展[J]. 岩石力学与工程学报, 2018, 37(8): 1856-1872.

[35]

LIU Caihua, LI Yuzong. Research progress in bolting mechanism and theories of fully grouted bolts in jointed rock masses[J]. Chinese journal of rock mechanics and engineering, 2018, 37(8): 1856-1872(in Chinese).

[36]

AZUAR J J. Stabilization of fissured rock masses by grouted steel bars[J]. Transport and Road Research Laboratory, 1977(73): 56-83.

[37]

AZUAR M M, REUILLE D,HABIB, et al. Rock mass reinforcement by passive rebars[C]// 4th ISRM Congress. Richardson,Texas,USA:OnePetro, 1979:ISRM-4CONGRESS- 1979-003.

基金资助

国家自然科学基金资助项目(12262018)

中央引导地方科技发展资金项目(22ZY1QA005)