With the rapid development of the urban economy and the continuous expansion of rail transit networks, the demand for transfer passage construction has surged, while challenges such as significant ground disturbance and high costs are increasingly prominent. Based on the No. 1 Underground Transfer Passage Project at Wangjing West Station in Beijing, a refined three-dimensional finite element model was established to systematically analyze the deformation behavior of the existing station under different jacking forces and the stress response of the reaction frame under the maximum jacking force. Targeted construction control measures were then proposed, and a comprehensive monitoring scheme covering the diaphragm wall, intermediate slab, and reaction frame was developed. Using field monitoring data, the deformation and stress evolution of the existing station and the reaction-jacking devices were revealed. The results show that, owing to its high structural stiffness and benefiting from the isolation effect of the back wall on the new construction, the existing station exhibits small overall horizontal deformation, characterized by a “bulging” pattern. Under a relatively small jacking force, the horizontal deformation increases significantly, whereas the growth slows down as the jacking force increases further. A safety analysis of the reaction-jacking system indicates that the structural stress, weld shear strength, and bolt shear strength all meet code requirements; however, an obvious tensile stress concentration zone exists at the bolts located at the intersection of the diagonal and horizontal members of the reaction frame, constituting a structurally weak point. Therefore, a scheme of adding connecting bolts is proposed to enhance system reliability. Increasing the number of reaction frames can effectively reduce horizontal displacement, but the reduction becomes marginal when three or more frames are employed.
经核算,将M22螺栓数由6枚增加至8枚。同时本工程顶管始发端采用深孔注浆进行加固处理。深孔注浆浆液采用水泥浆,该水泥浆应由强度等级不低于42.5级的普通硅酸盐水泥、促凝剂和水搅拌而成,水泥浆水灰比为1∶1。同时,顶管施工时除严格控制顶进姿态、顶进推力和顶进速度外,还需严格落实同步注浆、二次注浆和置换泥浆工艺。顶进速度控制在5~10 mm · min-1以内,推进过程中必须保证连续均衡施工,顶管施工过程中无特殊情况下不得停机搁置。
LeiShengxiang, LiuZhichun, HuangShuanglin, et al. Related research progress of networked expansion of urban underground space[J]. Chinese Journal of Underground Space and Engineering, 2022, 18(5): 1424-1440.
LiuZhichun, LeiShengxiang, LiGuoliang, et al. Evaluation method and application of urban underground space networked expansion disturbance[J]. Journal of Zhejiang University (Engineering Science), 2022, 56(7): 1363-1374.
[5]
ZhangZhenbo, ZhouJiadi, XuFei, et al. Calculation method of the finite soil pressure for a new foundation pit adjacent to an existing subway station[J]. Applied Sciences, 2023, 13(3): 1994.
ZhangZhenbo, HuangAn, ZhouJiadi, et al. Algorithm for resultant force of active soil pressure of excavations adjacent to underground subway stations[J]. Chinese Journal of Geotechnical Engineering, 2024, 46(7): 1516-1524.
WangZhijie, ZhouFeicong, ZhouPing, et al. Research on deformation theory of existing stations based on single side excavation and unloading of large foundation pits with strong close connection[J]. Chinese Journal of Rock Mechanics and Engineering, 2020, 39(10): 2131-2147.
[10]
ZhouFeicong, ZhouPing, LiJinyi, et al. Deformation characteristics and failure evolution process of the existing metro station under unilateral deep excavation[J]. Engineering Failure Analysis, 2022(131): 105870.
[11]
HanJianyong, WangJun, ChengCheng, et al. Mechanical response and parametric analysis of a deep excavation structure overlying an existing subway station: a case study of the Beijing Subway Station expansion[J]. Frontiers in Earth Science, 2023, 10:1079837.
LiuYong, CaoYize, WuXinliu, et al. Model test study on metro shield construction undercrossing existing open-cut tunnel[J]. China Railway Science, 2024, 45(1): 110-121.
ZhangXu, ZhangChengping, HanKaihang, et al. Case study of control technology of structural settlements due to tunnelling beneath a subway station[J]. Chinese Journal of Geotechnical Engineering, 2017, 39(4): 759-766.
[16]
XuQ, LeiS X, ZhuY Q, et al. Investigating the influence of excavating a tunnel undercrossing an existing tunnel at zero distance[J]. PLoS One, 2024, 19(4): e0301428.
[17]
LiuX, FangQ, ZhangD L. Mechanical responses of existing tunnel due to new tunnelling below without clearance[J]. Tunnelling and Underground Space Technology Incorporating Trenchless Technology Research, 2018, 80: 44-52.
PengYuyi. Research on the effect of zero distance underground excavation through existing stations to control settlement[J]. Journal of Railway Engineering Society, 2024, 41(4): 96-101.
PengLimin, WangZhe, YeYichao, et al. Technological development and research status of rectangular pipe jacking method[J]. Tunnel Construction, 2015, 35(1): 1-8.
LiuWenjun, FuHelin, WenShujie, et al. Influencing analysis of construction of mining tunnel close crossing underneath the existing rectangular pipe jacking tunnel[J]. Journal of Railway Science and Engineering, 2016, 13(9): 1782-1788.
YanZhiguo, ZhuHehua, LiXiangyang, et al. 3D-FEM analysis on stability of shaft with conduit jacked synchronously in two directions[J]. Chinese Journal of Geotechnical Engineering, 2005, 27(8): 891-896.
LiuXiyuan, ZhangShihua, GaoLikang, et al. Characteristic of stress and displacement of back wall and soil of circular working shaft for pipe jacking in drainage project of Zhijiang End Mine Reservoir[J]. Tunnel Construction, 2021, 41(10): 1672-1681.
HuangZhangjun, YangYanling, TangDongsang, et al. Numerical simulation and monitoring of reaction wall of launching shaft for large rectangular pipe jacking[J]. Tunnel Construction, 2020, 40(7): 972-980.
[30]
SunYang, ShenShuilong, XuZhengliang, et al. Prediction of lateral displacement of soil behind the reaction wall caused by pipe jacking operation[J]. Tunnelling and Underground Space Technology incorporating Trenchless Technology Research, 2014, 40: 210-217.
[31]
SunYang, SuJingbo, XiaXiaohe, et al. Numerical analysis of soil deformation behind the reaction wall of an open caisson induced by horizontal parallel pipe-jacking construction[J]. Canadian Geotechnical Journal, 2015, 52(12): 2008-2016.
[32]
BaiQian, ZhaoWen, WangXin, et al. Influence of pipe-jacking reaction on earth pressure of back wall of pilot tunnel of subway station[J]. Sustainability, 2023, 15(2): 1033-1033.
XiaYangyang, FangHongyuan, ZhangChao, et al. Mechanical response analysis of pipe jacking construction to new composite assembly supporting work shaft[J]. Rock and Soil Mechanics, 2022, 43(10): 2799-2808.
[35]
ZhangChao, ZhaiWenbo, XiaYangyang, et al. Analysis of the stability of a novel assembled working shaft support structure during pipe jacking construction: experiments and numerical simulations[J]. Engineering Failure Analysis, 2024, 162: 108418.
WangNing, GaoYi, YuShaohui, et al. Disturbance of rectangular pipe jacking tunnel group construction on soil behind working shaft[J]. Tunnel Construction, 2019, 39(3): 413-420.
[38]
GB 50017—2017 钢结构设计标准 [S].
[39]
GB 50017—2017 Standard for design of steel structures [S].
XuYong, ZhangPeng, ZengCong, et al. Calculation model of frictional resistance for rectangular pipe jacking based on effective soil pressure[J]. Chinese Journal of Geotechnical Engineering, 2025, 47(9): 1967-1976.
[42]
DB11T 716—2019 穿越既有交通基础设施工程技术要求 [S].
[43]
DB11T 716—2019 Technical requirements for crossing existing road facilities [S].