The Pinglu Canal project adopts a multi-tiered water-saving ship lock, which offers advantages in water conservation and adaptability to high water heads. However, the filling and emptying operations are substantially more frequent than those of conventional ship locks. To ensure lockage efficiency, the valve opening and closing speeds must be significantly increased—specifically, the opening speed should be no less than 8 m/min and the closing speed no less than 16 m/min, which are two to four times the conventional rates. This study focuses on the actual fast-acting requirements of the hydraulic hoist in the canal project. A kinematic mathematical model of the hoist is established, and the load characteristics of the working valve are analyzed. A simulation model of the hydraulic system is developed, and three rapid closing oil-filling schemes—accumulator oil filling, high-level tank oil filling, and pump-direct oil filling—are comprehensively compared and evaluated. Prototype tests are conducted to validate the simulation results. The results indicate that, considering dynamic refueling performance, technological maturity, structural stability, and reliability, the high-level tank scheme is the most reasonable. The prototype test results are generally consistent with the simulation predictions, with a maximum relative error of approximately 4.1%. The measured maximum opening speed is about 8.2 m/min, and the maximum closing speed is about 16.1 m/min. The designed fast hydraulic hoist exhibits good dynamic control performance.
FANQing, ZHAOYong, HEYan, et al. A Hydropower Station Rapid Gate Hydraulic Hoist Return Oil Tank Intelligent Purification Device[J]. Machine Tool & Hydraulics, 2025, 53(12): 217-223.
[9]
刘伟林. 三峡枢纽工程中的液压启闭机关键技术研究[D]. 太原: 太原理工大学, 2003.
[10]
LIUWeilin. Research on Key Technologies of Hydraulic Hoisting Machine in Three Gorges Project[D]. Taiyuan: Taiyuan University of Technology, 2003.
[11]
詹磊. 新型双吊点液压启闭机的设计与研究[D]. 昆明: 昆明理工大学, 2011.
[12]
ZHANLei. Design and Research of a New Hydraulic Hoist with Double Lifting Points[D]. Kunming: Kunming University of Science and Technology, 2011.
[13]
李珺. 液压启闭机电液比例控制系统的设计研究[D]. 昆明: 昆明理工大学, 2008.
[14]
LIJun. Design and Research of Electro Hydraulic Proportional Control System for Hydraulic Hoist[D]. Kunming: Kunming University of Science and Technology, 2008.
LIZe. Research on Control System of Double Hanging Point Hydraulic Hoist Based on Synchronous Drive Technology[D]. Harbin: Harbin Institute of Technology, 2019.
DUANHuiling, CHANGQingyu. Design and Research of Balance Valve for Hydraulic Hoist Hydraulic System[J]. Hydraulics Pneumatics & Seals, 2021, 41(5): 57-60.
DUANHuiling. Design and Research on Oil Replenishment Mode of Hydraulic Cylinder for Water Conservancy and Hydropower Engineering[J]. Hydraulics Pneumatics & Seals, 2021, 41(6): 10-13.
MAOWurong, ZHANGGuoxian, HUANGRenhao, et al. Study on the Dynamic Characteristics of the Hydraulic System for Headstock Gear[J]. Mechanical and Electrical Equipment, 2004, 21(3): 15-19.
[23]
王聪. 双吊点闸门启闭机液压系统仿真及同步控制策略研究[D]. 秦皇岛: 燕山大学, 2022.
[24]
WANGCong. Research on Hydraulic System Simulation and Synchronous Control Strategy of Double Lifting Point Gate Hoist[D]. Qinhuangdao: Yanshan University, 2022.
HOUQinghong, ZHOUWei. Design and Research of Operation Plane Gate for Hydraulic Hoist with Multi Pull Rod[J]. Water Sciences and Engineering Technology, 2018(4): 59-61.
DUChao, LICong, TANYong. Development and Application of Multi-channel Running State Detection Device for Hydraulic System of Gate Valve Hoist[J]. China Water Transport, 2025(19): 105-107.
CHENMing, SenpengLÜ, LIUYuan, et al. Review of Hydraulics Investigations of Filling and Emptying System in Ship Locks with Water-saving Basins[J]. Port & Waterway Engineering, 2021(9): 106-112.
PANHaitao, WUPeng, YUANHeping, et al. Overview of Planning and Design Scheme for Western Land-sea New Corridor(Pinglu) Canal Project[J]. Port & Waterway Engineering, 2024(11): 1-7.
[37]
刘宁. 平陆运河工程建设关键问题研究与思考[J]. 水运工程, 2024(6): 1-11.
[38]
LIUNing. Research and Contemplation on Key Issues in Construction of Pinglu Canal Project[J]. Port & Waterway Engineering, 2024(6): 1-11.
[39]
穆森, 吕小龙. 平陆运河船闸通过能力研究[J]. 水运工程, 2021(3): 145-150.
[40]
MUSen, XiaolongLÜ. Lock Capacity of the Pinglu Canal[J]. Port & Waterway Engineering, 2021(3): 145-150.
CHENYun, SUHua, HUKaixiong, et al. Simulation Study on Numerical Hydrodynamic and Load Characteristics of Plane Valve at the Initial Stage of Door Opening and the Final Stage of Door Closing[J]. Hoisting and Conveying Machinery, 2024(22): 49-56.
LIUFang, GUXinyu, LIWensheng, et al. Structural Optimization of Emergency Plate Gate for Closure in Moving Water[J]. Transactions of the Chinese Society of Agricultural Engineering, 2019, 35(12): 142-149.