To solve the multi-stage hybrid flow shop scheduling problem under limited transportation resources, a mixed-integer programming model was established with makespan and total transportation time as optimization objectives.The model jointly optimizes transfer batch sizes of workpieces among processing stages and considers the die-change requirements of different types of workpieces A hybrid algorithm combining a simulated annealing-based neighborhood search strategy with non-dominated sorting genetic algorithm Ⅱ(NSGAⅡ) was designed to solve the problem. A dynamic transfer batch strategy was proposed according to the working time differences between preceding and succeeding operations to improve the material flow efficiency between stages. A roulette wheel initialization strategy based on machine working hours was designed to balance machine loads. Simulation results demonstrate that the proposed algorithm outperforms multi-objective particle swarm optimization(MOPSO), multi-objective evolutionary algorithm based on decomposition(MOEA/D), and standard NSGAⅡ on multiple evaluation indicators. Analysis of transportation resource quantity reveals that scheduling performance approaches optimality when the number of automated guided vehicles accounts for 50% of the total number of machines, providing a decision basis for resource allocation.
薄膜晶体管液晶显示器(TFT-LCD)的生产流程主要包括阵列制造、有机薄膜制造与模组封装三大环节。模组封装工段主要涉及背光绑定、印刷电路板插接以及老化测试等工序。液晶显示器广泛应用于手机、电脑、汽车等消费电子领域,品牌繁多,型号各异,但各加工阶段工艺相似,因此在实际生产过程中模组封装工厂常采用混合流水车间的生产组织形式。此外,受洁净度要求限制,工件需借助特制的自动导引车(automated guided vehicle,AGV)在各加工阶段间转运,AGV的数量和载量有限。同时,不同种类工件的加工工时及模具不同,通常将同类型工件集中投产。基于上述生产特征,可将模组封装工厂的调度问题抽象为一类具有有限运输资源且转运批量可变的多阶段混合流水车间调度问题(hybrid flow shop scheduling problem with limited transport resources and variable transfer batches, HFSSP-LRVB)。在HFSSP-LRVB中,工件在每个加工阶段的机器分配、加工顺序、运输资源的数量以及运输资源每次转运的工件数量都会对调度结果产生很大影响,因此,本文在研究生产资源与运输资源集成调度优化问题的基础上,将进一步考虑运输资源的动态转运批量问题。
在一般情况下,工厂为减少运输次数,会将AGV的最大运载量作为每次转运的批量大小,但考虑到工件前后工序工时之间的差异,这种做法并非十分合理。当某工件在前一阶段的工时较长,而在后一阶段的工时较短,此时若等待前一阶段的完工工件数达到最大运载量则需等待较长时间,可能造成后一阶段的机器处于饥饿状态;当前一阶段的工时较短,而后一阶段的工时较长时,则应尽可能提高单次运输的批量大小,以减少运输次数。为此,本文基于工时差异提出了动态转运批量(dynamic transfer batch, DTB)策略以动态调整转运批次的批量大小。
2)对于MS部分,为使得各机器的工作负载更加均衡,提出了基于机器工作时长的轮盘赌策略(roulette strategy based on machine working hours,RMH),按照JS编码部分给出的顺序依次为各类工件分配机器。初始时刻下所有机器的工作时长为零,被选择的概率相等。然后,每为一种工件分配完机器便更新机器的工作时长,工作时长越久的机器在下次分配中被选择的概率越小。
DONGJ, WANGX, HUJ, et al. An Improved Two-machine Flowshop Scheduling with Intermediate Transportation[J]. Journal of Combinatorial Optimization, 2016, 31(3): 1316-1334.
BAIZhaoyang, ZHANGHaonan, MIAOQiqi, et al. Integrated Scheduling Method of Machines and Automated Guided Vehicles for Flexible Flow Shop in Real-time Systems Based on GEP-DES Algorithm[J]. Computer Integrated Manufacturing Systems, 2023, 29(12): 4161-4174.
[4]
LIW, HAND, GAOL, et al. Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop[J]. Chinese Journal of Mechanical Engineering, 2022, 35: 12.
[5]
XINGS, SHAOZ, SHAOW, et al. Joint Scheduling of Hybrid Flow-shop with Limited Automatic Guided Vehicles: a Hierarchical Learning-based Swarm Optimizer[J]. Computers & Industrial Engineering, 2024, 198: 110686.
WENTingxin, GUANTingyu. Hybrid Flow Shop Sche-duling with Limited Buffers Considering Energy Consumption and Transportation[J]. Journal of System Simulation, 2024, 36(6): 1344-1358.
[8]
AMIRTEIMOORIA, MAHDAVII, SOLIMANPURM, et al. A Parallel Hybrid PSO-GA Algorithm for the Flexible Flow-shop Scheduling with Transportation[J]. Computers & Industrial Engineering, 2022, 173: 108672.
LIUHuan, ZHAOFuqing, XUTianpeng. Distributed Hybrid Flow Shop Scheduling Method Considering Worker Factors and Transportation Resources[J]. Journal of Huazhong University of Science and Technology (Natural Science Edition), 2025, 53(6): 71-79.
[13]
WANGC N, ANDREW PORTERG, HUANGC C, et al. Flow-shop Scheduling with Transportation Capacity and Time Consideration[J]. Computers, Materials & Continua, 2022, 70(2): 3031-3048.
[14]
TANGH, HUANGJ, RENC, et al. Integrated Scheduling of Multi-objective Lot-streaming Hybrid Flowshop with AGV Based on Deep Reinforcement Learning[J]. International Journal of Production Research, 2025, 63(4): 1275-1303.
ZHANGHuiyu, WANGSongling, CHENQingxin, et al. Optimization of AGV Configuration in a Flexible Job Shop with Random Batch Transportation[J]. Industrial Engineering Journal, 2024, 27(2): 119-129.
LUOYabo, ZHOUXiangyu, ZHANGFeng, et al. Multi-skilled Multi-manned Assembly Line Rebalancing Problem Based on Two-stage Algorithm[J]. Journal of Southwest Jiaotong University, 2025, 60(6): 1611-1622.
[19]
ZHANGMengai, ZHANGTianxian. MOPSO Based Optimal Resources Scheduling for Multi-base Station Cooperative System[C]∥International Conference on Autonomous Unmanned Systems(ICAUS 2021). Singapore,2021: 2327-2335.
WEIChenhao, LIJingmin, LIYunchen, et al. Modified MOEA/D for Solving Energy-efficient Flexible Flow Shop Scheduling Problem with Machine Deterioration Effect[J]. Computer Integrated Manufacturing Systems, 2026, 32(2): 585-598.
[22]
YUANM, LIY, ZHANGL, et al. Research on Intelligent Workshop Resource Scheduling Method Based on Improved NSGA-Ⅱ Algorithm[J]. Robotics and Computer-Integrated Manufacturing, 2021, 71: 102141.