Neelum-Jhelum水电站TBM引水隧洞岩爆特征及防治研究
李鹏翔 , 李华方 , 张伟 , 肖亚勋
有色金属(矿山部分) ›› 2026, Vol. 78 ›› Issue (6) : 64 -74.
Neelum-Jhelum水电站TBM引水隧洞岩爆特征及防治研究
Rockburst characteristics and prevention-control for TBM diversion tunnel of Neelum-Jhelum hydropower station
巴基斯坦Neelum-Jhelum水电站引水隧洞地质条件极为特殊,在TBM掘进过程中砂岩、粉砂岩地层交替出现呈互层“三明治”状,两引水隧洞在掘进期间发生数百次岩爆之多,其中不乏极强岩爆。引入高精度微震监测系统进行了长期的微震监测岩爆预警和岩爆观测(累积监测793 d,监测总长达到6 852 m)。本文基于大量现场岩爆实录与海量微震监测数据,分析了岩爆的时空分布特征、埋深效应、岩性影响规律,以及不同隧洞间距条件下的岩爆发生特征,探究了微震监测技术应用于N-J水电站引水隧洞岩爆预警的可行性。结果表明:两条隧洞97%的岩爆发生于掌子面前后18 m范围内,约2倍洞径区间内;96%的岩爆发生在TBM掘进作业过程或停机后1 h以内,岩爆以即时型岩爆为主;隧洞岩爆风险与埋深不存在单调线性正相关关系;岩性对岩爆发育具有显著控制作用,百米砂岩(硬岩)岩爆频次为22. 4,百米粉砂岩(较软岩)岩爆频次仅为2. 7,泥岩段未发生岩爆;平行隧洞间距由33 m增大至55. 48 m后,岩爆发生频次与破坏等级显著下降;微震监测信息对围岩地层变化及岩爆风险演化具备良好敏感性,基于微震监测的岩爆预警效果显著,该技术适用于复杂互层地层条件下的岩爆监测与预警。本研究成果可为揭示同类复杂地层中岩爆发育特征、灾变机理以及制定岩爆防控措施提供工程参考。
The diversion tunnels of the Neelum-Jhelum Hydropower Project in Pakistan are characterized by complex and special geological conditions. Sandstone and siltstone alternately occur along the TBM excavation alignment,forming a typical "sandwich" type of soft-hard interbedded strata. Hundreds of rockburst events,including multiple intense rockbursts,were encountered during the excavation of the two parallel diversion tunnels. A high-precision microseismic monitoring system was deployed for long-term in-situ monitoring,rockburst observation and risk early warning,with a total monitoring period of 793 days and a monitored tunnel length of 6 852 m. Based on abundant on-site rockburst records and massive microseismic time-series data,this study systematically analyzes the spatial-temporal distribution of rockbursts,burial depth effect,lithological control law,and rockburst characteristics under different spacing of parallel tunnels,and discusses the engineering feasibility of microseismic monitoring for rockburst early warning in the diversion tunnels of the N-J Hydropower Project. The results show that 97% of rockbursts occurred within 18 m (approximately twice the tunnel diameter) ahead of and behind the tunnel face;96% of rockbursts took place during TBM excavation or within 1 h after excavation shutdown,and rockbursts are dominated by immediate rockbursts. There is no simple one-to-one correlation between rockburst risk and burial depth. Lithology exerts a remarkable controlling effect on rockburst development:the rockburst frequency per hundred meters of sandstone (hard rock) is 22. 4,while that of siltstone (relatively soft rock) is only 2. 7,and no rockburst occurred in mudstone sections. When the spacing between parallel tunnels was increased from 33 m to 55. 48 m,both the occurrence frequency and damage intensity of rockbursts decreased significantly. Microseismic signals exhibit good sensitivity to variations in surrounding rock strata and the evolution of rockburst risk. The microseismic-based rockburst early warning achieves remarkable performance,and this technology is applicable to rockburst monitoring and early warning in complex interbedded strata. The findings of this study can provide engineering references for revealing rockburst characteristics and catastrophe mechanisms and developing rockburst prevention and control measures in similar complex strata.
| [1] |
|
| [2] |
李鹏翔,彭剑平,张博超, |
| [3] |
|
| [4] |
|
| [5] |
|
| [6] |
|
| [7] |
蒋邦友. 深部复合地层隧洞TBM施工岩爆孕育及控制机理研究[D]. 徐州:中国矿业大学,2017. |
| [8] |
|
| [9] |
尚彦军,蒋毅,魏思宇, |
| [10] |
|
| [11] |
周辉,宋明,张传庆, |
| [12] |
|
| [13] |
蒋毅. 深部复合地层力学特性及其对TBM施工影响研究[D]. 北京:中国科学院大学,2016. |
| [14] |
Jiang Yi. Study on mechanical properties of deep composite strata and its influence on TBM construction[D]. Beijing:University of Chinese Academy of Sciences,2016. |
| [15] |
黄锋,周洋,李天勇, |
| [16] |
|
| [17] |
丁恩理,刘越,吴继敏, |
| [18] |
|
| [19] |
史林肯,周辉,宋明, |
| [20] |
|
| [21] |
程建龙,杨圣奇,杜立坤, |
| [22] |
|
| [23] |
|
| [24] |
|
| [25] |
赵周能,冯夏庭,陈炳瑞, |
| [26] |
|
| [27] |
|
| [28] |
谷明成,何发亮,陈成宗. 秦岭隧道岩爆的研究[J]. 岩石力学与工程学报,2002,21(9):1324-1329. |
| [29] |
|
| [30] |
王文星,潘长良. 现场岩爆发生条件探讨[J]. 西部探矿工程,2002,14(1):54-56. |
| [31] |
|
| [32] |
|
| [33] |
赵周能,冯夏庭,陈炳瑞, |
| [34] |
|
| [35] |
|
| [36] |
|
| [37] |
李桐,冯夏庭,王睿, |
| [38] |
|
| [39] |
|
| [40] |
NB/T 10143— 2019 水电工程岩爆风险评估技术规范[S]. |
| [41] |
NB/T 10143— 2019 Rockburst risk assessment of hydropower projects[S]. |
| [42] |
|
国家自然科学基金资助项目(52509157)
/
| 〈 |
|
〉 |