摘要

针对金川三矿区硬岩矿岩条件下TBM 滚刀滚压破岩的应用需求,本文以矿区典型矿岩为研究对象,采用全尺寸滚刀线性切割试验与CERCHAR 岩石磨蚀性试验相结合的技术方案,系统开展硬岩滚压破岩力学性质、矿岩磨蚀性研究。首先通过常规岩石力学试验,测试矿体与围岩岩石的单轴抗压强度,为结合磨蚀性指数分析滚刀磨损量提供数据支撑。然后针对典型硬岩矿体岩石,开展2 mm 和4 mm 贯入度的滚刀滚压破岩试验,获得滚压破岩所需作用力与比能耗,为分析滚压破岩可掘性提供数据支撑。最后利用CERCHAR 磨蚀性试验测定矿岩磨蚀性指标,结合岩石力学性质评估磨蚀等级与滚刀磨损量。试验与分析结果表明,矿体超基性岩单轴抗压强度为125. 24~181. 42 MPa,围岩大理岩单轴抗压强度为96. 64 MPa;2 mm、4 mm 贯入深度时的峰值法向力分别约为42 kN、60 kN,法向力与贯入度之比平均为18,根据基于贯入度指数的岩体可掘进性分级方法,评估滚刀滚压破岩可掘性为高;矿体磨蚀性指标为2. 9~3. 8,大理岩磨蚀性指标为3. 3,根据2 种行业分级标准,评估滚刀滚压破岩磨蚀性等级为高,同时根据滚刀磨损量与CAI 值经验关系,分析特征滚刀磨损量。研究成果明确了金川三矿区滚刀滚压破岩的力学响应与磨蚀特性,可以为矿区滚刀的刀盘优化设计、采掘施工参数制定提供科学依据。

Abstract

To address the application requirements of TBM (Tunnel boring machine) disc cutters for rock cutting under hard rock conditions at the Jinchuan No. 3 Mine,this study employs full-size disc cutter linear cutting tests and rock abrasivity tests to investigate the mechanical properties of hard rock cutting and the abrasiveness,taking the typical ore rock of the mining area as the research subject. Initially,rock mechanics tests are conducted to obtain the UCS (uniaxial compressive strength) of both the ore body and the surrounding rock,providing data support for analyzing cutter wear based on the abrasivity index. For the ore body rocks,a typical hard rock,disc cutter rock cutting tests are performed at penetration depths of 2 mm and 4 mm,to obtain the rock cutting forces and the specific energy,providing data support for analyzing the boreability by disc cutters. The abrasivity index of the ore and surrounding rock is determined using the CERCHAR abrasivity test. The abrasiveness grade and cutter wear are evaluated in combination with the rock mechanical properties. Results show that the UCS of the ore body ranges from 125. 24 MPa to 181. 42 MPa,of which rock type is ultrabasic rock,while the UCS of the surrounding rock marble is 96. 64 MPa. The peak normal forces at penetration depths of 2 mm and 4 mm are approximately 42 kN and 60 kN,respectively,and the ratio of normal force to penetration depth averages 18. According to the rockmass boreability classification method based on penetration index,the boreability is high. The abrasivity index of the ore body ranges from 2. 9 to 3. 8,and 3. 3 for the marble. According to two classification standards,the rock abrasivity is high. Also,the wear characteristic of disc cutters is analyzed,based on the empirical relationship between cutter wear and CAI values. These findings clarify the mechanical response and abrasiveness characteristics of rock cutting by disc cutters at the Jinchuan No. 3 Mine,providing a scientific basis for optimizing disc cutter head design and determining construction parameters for mining and excavation.

关键词

硬岩 / 贯入度 / 滚压破岩 / 磨蚀性指数 / 滚刀磨损量

Key words

hard rock / penetration depth / rock cutting with disc cutter / abrasivity index / cutter wear

引用本文

引用格式 ▾
朱大铭,李选科,加恒,王想,达斯坦·恩提马克,王振宇,赵健. 金川三矿硬岩滚刀滚压破岩力学性质与磨蚀性指数试验研究[J]. 有色金属(矿山部分), 2026, 78(6): 88-96 DOI:10.20238/j.issn.1671-4172.2026.06.009

登录浏览全文

4963

注册一个新账户 忘记密码

参考文献

[1]

Ebadinia Z,Rahimdel M J,Aryafar A. Assessment of environmental hazards in a mine tailings dam using the fuzzy SAM method[J]. Journal of Geomine,2025,3(3):182-187.

[2]

Kononenko M,Khomenko O,Cabana E,et al. Using the methods to calculate parameters of drilling and+blasting operations for emulsion explosives[J]. Acta Montanistica Slovaca,2023,28(3):655-667.

[3]

Yilmaz O. Drilling and blasting designs for parallel hole cut and V—cut method in excavation of underground coal mine galleries[J]. Scientific Reports,2023,13:2449. DOI:10.1038/s41598—023—29803—6.

[4]

Bhatawdekar R M,Kumar R,Sabri Sabri M M,et al. Estimating flyrock distance induced due to mine blasting by extreme learning machine coupled with an equilibrium optimizer[J]. Sustainability,2023,15(4):3265. DOI:10.3390/su15043265.

[5]

Wang Shaofeng,Sun Licheng,Huang Linqi,et al. Non—explosive mining and waste utilization for achieving green mining in underground hard rock mine in China[J]. Transactions of Nonferrous Metals Society of China,2019,29(9):1914-1928.

[6]

Alexander C,Board M,Johnson W,et al. Mobile mechanical vein miner:new machine developed for Lucky Friday Mine[J]. Mining Engineering,2018,70(1):16-24.

[7]

Krzysztof K,Piotr M. Methods of mechanical mining of compact—rock:a comparison of efficiency and energy consumption[J]. Energies,2019,12(18):3562. DOI:10.3390/en12183562.

[8]

Bołoz Ł,Biały W. Automation and robotization of underground mining in Poland[J]. Applied Sciences,2020,10(20):7221. DOI:10.3390/app10207221.

[9]

Zhao Jian,Huang Dan,Zhu Daming,et al. Investigations on rockmass structure characteristics and mechanical mining efficiency and economics in the Jinchuan No. 3 mine with hard rock[J]. Advances in Civil Engineering,2026,2026:2598677. DOI:10.1155/adce/2598677.

[10]

Dziurzyński W,Krach A,Krawczyk J,et al. Numerical simulation of shearer operation in a longwall district[J]. Energies,2020,13(21):5559. DOI:10.3390/en13215559.

[11]

Zhang Mengqi,Yan Xianguo,Qin Guoqiang. A new method for roadheader pick arrangement based on meshing pick spatial position and rock cutting verification[J]. PLoS One,2021,16(11):e0260183. DOI:10.1371/journal.pone.0260183.

[12]

Bołoz Ł,Kalukiewicz A. Machines for mechanical mining of hardly workable and abrasive rocks[J]. Multidisciplinary Aspects of Production Engineering,2020,3(1):150-160.

[13]

Lyly J,Hartwig S,Nord G. Epiroc Mobile Miner:hard rock cutting is now a reality[C]//Svenska Bergteknikföreningen. Stockholm,Sweden,2018:277-290.

[14]

Singh B,Goel R K. Engineering rock mass classification[M]. Boston:Butterworth—Heinemann,2011.

[15]

Cho J W,Jeon S,Jeong H Y,et al. Evaluation of cutting efficiency during TBM disc cutter excavation within a Korean granitic rock using linear—cutting—machine testing and photogrammetric measurement[J]. Tunnelling and Underground Space Technology,2013,35:37-54.

[16]

Cho J W,Jeon S,Yu S H,et al. Optimum spacing of TBM disc cutters:a numerical simulation using the three—dimensional dynamic fracturing method[J]. Tunnelling and Underground Space Technology,2010,25(3):230-244.

[17]

Entacher M,Schuller E,Galler R. Rock failure and crack propagation beneath disc cutters[J]. Rock Mechanics and Rock Engineering,2015,48(4):1559-1572.

[18]

Thyagarajan M V,Rostami J. Study of cutting forces acting on a disc cutter and impact of variable penetration measured by full scale linear cutting tests[J]. International Journal of Rock Mechanics and Mining Sciences,2024,175:105675. DOI:10.1016/j.ijrmms.2024.105675.

[19]

Sharghi M,Jeong H. Enhanced estimation of cerchar abrasivity index using mineralogical composition analysis[J]. Rock Mechanics and Rock Engineering,2026,59(8):9185-9199.

[20]

Bieniawski Z T,Celada B,Galera J M,et al. Prediction of cutter wear using RME[C]//Proc,ITA Congress. Budapest,2009.

[21]

Karami M,Zare S,Rostami J. Tracking of disc cutter wear in TBM tunneling:a case study of Kerman water conveyance tunnel[J]. Bulletin of Engineering Geology and the Environment,2021,80(1):201-219.

[22]

Jeong H,Choi S, Lee Y K. Evaluation of cutting performance of a TBM disc cutter and cerchar abrasivity index based on the brittleness and properties of rock[J]. Applied Sciences,2023,13(4):2612. DOI:10.3390/app13042612.

[23]

ASTM D7625—22 Standard test method for laboratory determination of abrasiveness of rock using the CERCHAR method[S].

[24]

Alber M,Yaralı O,Dahl F,et al. ISRM suggested method for determining the abrasivity of rock by the Cerchar abrasivity test[J]. Rock Mechanics and Rock Engineering,2014,47(1):261-266.

[25]

李子琛,朱杰兵,张宜虎,等. TBM 隧道岩石可掘性评价指标及其应用研究综述[J]. 地下空间与工程学报,2024,20(增刊1):508-520.

[26]

Li Zichen,Zhu Jiebing,Zhang Yihu,et al. A review of rock boreability evaluation index and its application in TBM tunnel construction[J]. Chinese Journal of Underground Space and Engineering,2024,20(S1):508-520.

[27]

Klein S,Schmoll M,Avery T. TBM performance at four hard rock tunnels in California[C]//Proceedings of the Rapid Excavation and Tunneling Conference. Society for Mining,Metallogy & Exploration,INC,1995:61-76.

[28]

薛亚东,李兴,刁振兴,等. 基于掘进性能的TBM 施工围岩综合分级方法[J]. 岩石力学与工程学报,2018,37(增刊1):3382-3391.

[29]

Xue Yadong,Li Xing,Diao Zhenxing,et al. Comprehensive classification method of surrounding rock in TBM construction based on tunneling performance[J]. Chinese Journal of Rock Mechanics and Engineering,2018,37(S1):3382-3391.

[30]

Maidl B. Tunnelbohr maschinen im hartgestein[M]. Berlin:Ernst & Sohn Verlag, 2001.

[31]

Plinninger R J,Kasling H,Thuro K. Wear prediction in hardrock excavation using the Cerchar abrasiveness index(CAI)[C]//Schubert W. Rock Engineering Theory and Practice,Proceedings of the ISRM Regional Symposium EUROCK 2004 & 53rd Geomechanics Colloquy. Berlin,Germany,2004:599-604.

[32]

龚秋明,许弘毅,李立民. 岩石磨蚀性指数分级讨论[J]. 地下空间与工程学报,2021,17(3):748-758.

[33]

Gong Qiuming,Xu Hongyi,Li Limin. Discussions on the rock abrasivity index classification[J]. Chinese Journal of Underground Space and Engineering,2021,17(3):748-758.