TBM 始发硐室群围岩稳定性及开挖工法优化研究

周少兵 ,  刘荣乐 ,  李明睿 ,  孙志浩 ,  张春虎 ,  周新勍

有色金属(矿山部分) ›› 2026, Vol. 78 ›› Issue (6) : 145 -154.

PDF (9029KB)
有色金属(矿山部分) ›› 2026, Vol. 78 ›› Issue (6) : 145 -154. DOI: 10.20238/j.issn.1671-4172.2026.06.014
TBM专刊

TBM 始发硐室群围岩稳定性及开挖工法优化研究

作者信息 +

Stability of surrounding rock and optimization of excavation methods for TBM launching chamber groups

Author information +
文章历史 +
PDF (9245K)

摘要

针对矿山TBM 大型始发硐室群开挖的围岩稳定性问题,本文以江西某金属矿山为背景,利用PLAXIS 3D数值模拟,研究了斜坡道分层法与小断面扩刷法两类施工工艺下大断面组装硐室围岩变形和应力分布特征。研究表明:斜坡道分层法对应的围岩变形量峰值为3. 20 mm,小于小断面扩刷法(峰值3. 30~3. 41 mm);两类工法在施工过程中均会在拐角处出现应力集中,且在施工完成后出现残余应力,其中,斜坡道分层法施工产生的最大残余应力为49. 7 MPa,小断面扩刷法施工产生的最大残余应力为16. 7 MPa,综合考虑变形控制效果与施工机械化程度,推荐优先采用斜坡道分层法,并实施“锚杆+ 钢筋网”临时支护。研究成果可为深部金属矿山TBM 始发硐室群的设计与施工提供科学依据。

Abstract

To address the stability issues of surrounding rock during the excavation of large-scale TBM launching chamber groups in deep mines,this study takes a TBM launching chamber group project in a metal mine in Jiangxi Province as the engineering background. Using PLAXIS 3D numerical simulation software,the deformation and stress distribution characteristics of the surrounding rock of a large-section assembly chamber were investigated under two construction methods:the ramp bench method and the small-section pilot tunnel enlargement method. The results indicate that the peak surrounding rock deformation induced by the ramp bench method is 3. 20 mm,which is smaller than that of the small-section enlargement method (peak values ranging from 3. 30 to 3. 41 mm). Both methods exhibit stress concentration at corners during construction and residual stress after completion. The maximum residual stress generated by the ramp bench method is 49. 7 MPa,while that of the small-section pilot tunnel enlargement method is 16. 7 MPa. Considering the overall deformation control effect and the degree of mechanization,the ramp bench method is recommended as the preferred approach,with immediate support using “rock bolts+steel mesh” applied at corner locations. The research findings can provide a scientific basis for the design and construction of TBM launching chamber groups in deep metal mines.

关键词

大硐室群 / TBM / 数值模拟 / 施工技术 / 围岩稳定性 / 金属矿山

Key words

large chamber group / TBM / numerical simulation / construction technology / surrounding rock stability / metal mine

引用本文

引用格式 ▾
周少兵,刘荣乐,李明睿,孙志浩,张春虎,周新勍. TBM 始发硐室群围岩稳定性及开挖工法优化研究[J]. 有色金属(矿山部分), 2026, 78(6): 145-154 DOI:10.20238/j.issn.1671-4172.2026.06.014

登录浏览全文

4963

注册一个新账户 忘记密码

参考文献

[1]

陈发兴,蔡光辉,胡韬. 浅谈TBM 在金属矿山的应用[J]. 有色金属设计,2021,48(2):1-8.

[2]

Chen Faxing,Cai Guanghui,Hu Tao. Introduction to TBM application in metal mines[J]. Nonferrous Metals Design,2021,48(2):1-8.

[3]

刘荣乐,樊忠华,张春虎,等. TBM 施工技术在金属矿山长距离运输巷掘进的应用[J]. 现代矿业,2024,40(6):179—181,185.

[4]

Liu Rongle,Fan Zhonghua,Zhang Chunhu,et al. Application of TBM construction technology in excavation of long—distance transportation roadway in metal mines[J]. Modern Mining,2024,40(6):179—181,185.

[5]

刘荣乐,张春虎,周新勍,等. 多中段平巷矿山系统:202421250390. 3[P]. 2025—01—14.

[6]

Liu Rongle,Zhang Chunhu,Zhou Xinqing,et al. Multi—level horizontal drift mine system:CN202421250390. 3[P]. 2025—01—14.

[7]

黄建鑫. TBM 在某金属矿山长距离井巷掘进中的应用[J]. 现代矿业,2023,39(7):205-209.

[8]

Huang Jianxin. Application of TBM in long—distance tunneling in a metal mine[J]. Modern Mining,2023,39(7):205-209.

[9]

侯朝炯. 深部巷道围岩控制的关键技术研究[J]. 中国矿业大学学报,2017,46(5):970-978.

[10]

Hou Chaojiong. Key technologies for surrounding rock control in deep roadway[J]. Journal of China University of Mining & Technology, 2017,46(5):970-978.

[11]

张俊文. 深部大规模松软围岩巷道破坏分区理论分析[J]. 中国矿业大学学报,2017,46(2):292-299.

[12]

Zhang Junwen. Theoretical analysis on failure zone of surrounding rock in deep large—scale soft rock roadway[J]. Journal of China University of Mining & Technology, 2017,46(2):292-299.

[13]

陈顺满,吴爱祥,王少勇,等. 软弱围岩巷道变形机理及返修控制技术[J]. 中国矿业大学学报,2018,47(4):830-837.

[14]

Chen Shunman,Wu Aixiang,Wang Shaoyong,et al. Deformation mechanism and repair control technology of soft surrounding rock roadway[J]. Journal of China University of Mining & Technology, 2018,47(4):830-837.

[15]

王琦,王雷,刘博宏,等. 破碎围岩注浆体空隙特征和力学性能研究[J]. 中国矿业大学学报,2019,48(6):1197-1205.

[16]

Wang Qi,Wang Lei,Liu Bohong,et al. Study of void characteristics and mechanical properties of fractured surrounding rock grout[J]. Journal of China University of Mining & Technology, 2019,48(6):1197-1205.

[17]

杨仁树,朱晔,李永亮,等. 层状岩体中巷道底板应力分布规律及损伤破坏特征[J]. 中国矿业大学学报,2020,49(4):615—626,645.

[18]

Yang Renshu,Zhu Ye,Li Yongliang,et al. Stress distribution and damage characteristics of roadway floor in layered rock mass[J]. Journal of China University of Mining & Technology, 2020,49(4):615—626,645.

[19]

侯朝炯. 深部巷道围岩控制的有效途径[J]. 中国矿业大学学报,2017,46(3):467-473.

[20]

Hou Chaojiong. Effective approach for surrounding rock control in deep roadway[J]. Journal of China University of Mining & Technology, 2017,46(3):467-473.

[21]

刘永乐. 深部高应力硐室群开挖与支护技术研究[D]. 青岛:山东科技大学,2019.

[22]

Liu Yongle. Research on excavation and support technology in deep & high stress chamber group[D]. Qingdao:Shandong University of Science and Technology,2019.

[23]

杨仁树,薛华俊,郭东明,等. 复杂岩层大断面硐室群围岩破坏机理及控制[J]. 煤炭学报,2015,40(10):2234-2242.

[24]

Yang Renshu,Xue Huajun,Guo Dongming,et al. Failure mechanism of surrounding rock of large section chambers in complex rock formations and its control[J]. Journal of China Coal Society,2015,40(10):2234-2242.

[25]

陈佳琪. 超大跨软弱富水破碎岩层硐室群施工方法优化研究[J]. 铁道建筑技术,2025(3):150-153.

[26]

Chen Jiaqi. Optimization research on construction method of ultra large span chamber group built in weak water—rich fractured layer[J]. Railway Construction Technology,2025(3):150-153.

[27]

王炯,王浩,郭志飚,等. 深井高应力强膨胀软岩泵房硐室群稳定性控制对策[J]. 采矿与安全工程学报,2015,32(1):78-83.

[28]

Wang Jiong,Wang Hao,Guo Zhibiao,et al. Stability control strategy of high stress and intense expansion softrock underground openings for pump house in deep mine[J]. Journal of Mining & Safety Engineering, 2015,32(1):78-83.

[29]

王炯,马磊,刘鹏,等. 深井软岩硐室群支护技术研究[J]. 应用基础与工程科学学报,2023,31(2):330-340.

[30]

Wang Jiong,Ma Lei,Liu Peng,et al. Study on soft rock cavern groups support technology in deep mine[J]. Journal of Basic Science and Engineering,2023,31(2):330-340.

[31]

董亚宁,金爱兵,陈成,等. 深部软岩硐室群施工相互影响及变形破坏分析[J]. 金属矿山,2024,53(6):61-70.

[32]

Dong Yaning,Jin Aibing,Chen Cheng,et al. Analysis of the interaction and deformation and failure of the construction of deep soft rock chamber group[J]. Metal Mine,2024,53(6):61-70.

[33]

尹升华,寇永渊,周昀,等. 深部硐室群布置方式及开挖顺序优化研究[J].工程科学学报,2025,47(4):628-641.

[34]

Yin Shenghua,Kou Yongyuan,Zhou Yun,et al. Optimized layout and excavation sequence of deep chambers[J]. Chinese Journal of Engineering,2025,47(4):628-641.

[35]

李玉选,郭红斌,黄丹,等. 金属矿山TBM 地下始发硐室群设计及关键施工技术研究[J]. 有色金属(矿山部分),2024,76(6):152-160.

[36]

Li Yuxuan,Guo Hongbin,Huang Dan,et al. Study on design and key construction technology of underground starting chamber group of TBM in metal mine[J]. Nonferrous Metals(Mining Section),2024,76(6):152-160.

[37]

关宝树. 隧道工程设计要点集[M]. 北京:人民交通出版社,2003.

[38]

Guan Baoshu. Key points of tunnel engineering design[M]. Beijing:China Communications Press,2003.

[39]

刘志祥,张海清. PLAXIS 高级应用教程[M]. 北京:机械工业出版社,2015.

[40]

Liu Zhixiang,Zhang Haiqing. PLAXIS advanced application course[M]. Beijing:China Machine Press,2015.

[41]

黄玉兵,王琦,高红科,等. 深部软岩硐室群破坏机制与施工过程优化[J]. 中国矿业大学学报,2021,50(1):69-78.

[42]

Huang Yubing,Wang Qi,Gao Hongke,et al. Failure mechanism and construction process optimization of deep soft rock chamber group[J]. Journal of China University of Mining & Technology, 2021,50(1):69-78.

AI Summary AI Mindmap
PDF (9029KB)

5

访问

0

被引

详细

导航
相关文章

AI思维导图

/

〈 〉