Design and application of floor backfilling method for TBM construction roadways
针对某铁矿项目TBM 施工巷道底板回填存在的成本高、施工效率低、无法实现同步施工等问题,开展改良渣石同步回填工艺研究。通过对比分析现有回填工艺的技术优劣,本文以TBM 掘进渣石(粒径≤150 mm)为骨料,控制渣石与固化剂质量配比制备回填材料,结合现场工况设计TBM 拖车尾部拌和系统,制定同步分层回填与固化施工工艺,并构建全过程质量监控体系,形成一套完整的TBM 施工改良渣石同步回填技术方案。结果表明,该工艺实现了TBM 掘进与巷道底板回填的同步施工,改良渣石16 d 无侧限抗压强度达到11. 98 MPa,压实系数≥0. 93,养护2~4 h 后即可满足施工车辆通行要求;与传统现浇混凝土回填相比,该工艺使巷道底板回填投资成本降幅达到56. 36%。实现了掘进渣石的资源化利用,践行了绿色矿山建设理念,为金属矿山TBM 施工巷道底板回填提供了高效、经济、环保的回填方案,具有广泛的工程应用和推广价值。
Aiming at the problems of high cost,low construction efficiency and inability to realize simultaneous construction existing in the floor backfilling of TBM-excavated roadways in an iron ore project,a study on the improved simultaneous backfilling technology using roadway slag was carried out. By comparing and analyzing the technical advantages and disadvantages of conventional backfilling processes,this paper takes TBM excavated slag (particle size less than 150 mm) as aggregate,and prepares backfill materials by controlling the mass mixing ratio of slag and curing agent. Combined with field working conditions,a mixing system mounted at the tail of the TBM was designed,the construction procedures of simultaneous layered backfilling and solidification were formulated,and a full-process quality monitoring system was established,forming a complete technical scheme for improved simultaneous slag backfilling for TBM construction. The results show that the proposed technology realizes simultaneous operation of TBM excavation and roadway floor backfilling. The unconfined compressive strength of the improved slag reaches 11. 98 MPa after 16 days of curing,with the compaction coefficient no less than 0. 93. The backfill can bear the passage of construction vehicles after only 2-4 hours of curing. Compared with the traditional cast-in-place concrete backfilling,the total investment of floor backfilling for the roadway is reduced by 56. 36%. The technology realizes the resource utilization of excavated slag and practices the concept of green mine construction. It provides an efficient,economical and environmentally friendly backfilling solution for the floor backfilling of TBM-excavated roadways in metal mines,and possesses broad engineering application and promotion value.
| [1] |
刘泉声,刘滨,唐彬, |
| [2] |
|
| [3] |
周振梁,谭忠盛,李林峰, |
| [4] |
|
| [5] |
周佳媚,高波,李志业. TBM 施工隧道仰拱预制块的力学特性研究[J]. 岩土力学,2004,25(12):1973—1976,1980. |
| [6] |
|
| [7] |
刘泉声,潘玉丛,余宏淦, |
| [8] |
|
| [9] |
车平,黄宏伟,薛亚东, |
| [10] |
|
| [11] |
张洪伟,胡兆锋,程敬义, |
| [12] |
|
| [13] |
李超,顾琳琳,肖天驰, |
| [14] |
|
| [15] |
丁向群,段锦涛,康天蓓, |
| [16] |
|
| [17] |
伍豪,杨伟军,杨建宇, |
| [18] |
|
深地国家科技重大专项项目(2024ZD1003800)
/
| 〈 |
|
〉 |