深部有色金属矿山 TBM 工程应用瓶颈及协同优化对策
任志强 , 初士俊 , 柴慧珍 , 乐容昌 , 杨慧云
有色金属(矿山部分) ›› 2026, Vol. 78 ›› Issue (6) : 225 -231.
深部有色金属矿山 TBM 工程应用瓶颈及协同优化对策
Study on bottlenecks and collaborative optimization countermeasures of engineering application for TBM in deep non‑ferrous metal mines
我国有色金属矿山逐步进入千米级深部开采阶段,高地应力、高地温、高渗透压、强岩爆、破碎带发育等复杂地质条件凸显,传统钻爆法存在掘进效率低、围岩扰动剧烈、井下作业环境恶劣、劳动强度大等短板,难以适配深部井巷规模化建设需求。TBM 作为非爆破连续掘进核心装备,已成为深部有色矿山机械化、智能化掘进的关键技术路径,国内多座有色金属矿山已开展TBM 工程实践并取得阶段性成效,但受矿山自身工程与地质特征制约,其规模化推广仍存在多重现实阻碍。本文结合国内外有色矿山TBM 实际工程案例,从施工经济成本、巷道断面形式匹配、设备转运、出渣运输、通风降温、施工排水等方面,系统分析了TBM 在有色金属矿山推广应用面临的各类难题。针对现存问题,对矿山企业、设备厂家、设计单位、施工单位四个主体提出建议:矿山企业立足长远、统筹规划;设备厂家适配矿情、技术攻关;设计单位融合特点、系统设计;施工单位融合人才、精细管理。通过协同努力,推进有色金属矿山TBM 应用进程,推动深部开采建设向高效、安全、环保的方向转变,为我国有色金属矿业的高质量可持续发展提供坚实的技术支撑。
China's non-ferrous metal mines have gradually entered the stage of deep mining at the kilometer level, accompanied by prominent complicated geological conditions such as high ground stress, high geothermal temperature, high osmotic pressure, strong rockburst and widely developed fractured zones. The traditional drilling and blasting method has obvious drawbacks including low tunneling efficiency, severe disturbance to surrounding rock, harsh underground working environment and heavy labor intensity, making it unable to satisfy the large-scale construction requirements of deep underground roadways. As the core non-blasting continuous tunneling equipment, Tunnel Boring Machine (TBM) has become a critical technical route for mechanized and intelligent excavation in deep non-ferrous metal mines. A number of domestic non-ferrous metal mines have carried out TBM construction practices and achieved phased results. Nevertheless, restricted by the inherent engineering layout and geological characteristics of mines, multiple practical obstacles still hinder the large-scale popularization of TBM technology in this field. Combined with actual engineering cases of TBM projects in non-ferrous metal mines at home and abroad, this paper systematically analyzes a full range of difficulties encountered during the promotion and application of TBM in non-ferrous metal mines from following aspects such as the construction economic cost control, adaptability between roadway section shapes and TBM structure, the transportation and underground lowering of large TBM components, the matching between mucking and haulage, long-distance ventilation and cooling for deep single-head excavation, as well as the complex construction drainage system. In response to the above existing bottlenecks, targeted suggestions are put forward for four core stakeholders in the whole industrial chain, namely mine enterprises, equipment manufacturers, design institutes and construction enterprises. Mine enterprises shall adopt a long-term strategic vision and conduct overall integrated planning for deep mining projects. Equipment manufacturers shall carry out targeted technical research and development to produce customized TBM equipment and supporting facilities that fully adapt to the complex geological and engineering conditions of non-ferrous metal mines. Design institutes shall integrate the construction characteristics of TBM and the production demands of non-ferrous mines to carry out holistic systematic design. Construction enterprises shall build interdisciplinary talent teams with professionals mastering both mining engineering and TBM operation, and implement refined whole-process on-site management to reduce equipment failure rates and construction risks. Through coordinated joint efforts of all four participants to tackle technical and management challenges together, the application and popularization of TBM in non-ferrous metal mines can be greatly accelerated. The research outcomes can effectively promote the transformation of deep mining construction towards high efficiency, safety and environmental friendliness, and provide solid technical support to boost the high-quality sustainable development of China's non-ferrous metal mining industry.
| [1] |
刘立顺,杨小聪,万串串, |
| [2] |
|
| [3] |
陈璐,郭利杰,杨小聪. 金属矿深部开采岩爆灾害防控研究进展与工程实践[J]. 矿冶,2024,33(4):482—494,514. |
| [4] |
|
| [5] |
蔡美峰,薛鼎龙,任奋华. 金属矿深部开采现状与发展战略[J]. 工程科学学报,2019,41(4):417-426. |
| [6] |
|
| [7] |
刘福春,郭钦鹏,熊有为. 金属矿山深部硬岩矿床非爆连续采矿技术及应用[J]. 有色金属(矿山部分),2024,76(6):64—69,83. |
| [8] |
|
| [9] |
李夕兵,陈祉颖,陈江湛, |
| [10] |
|
| [11] |
刘娇. 马蹄形隧道掘进机刀盘设计探讨[J]. 隧道建设,2017,37(增刊1):204-211. |
| [12] |
|
| [13] |
Ruiz V, Baker T, Ofiara D, |
| [14] |
李勇,陈虎忠,朱航宇, |
| [15] |
|
| [16] |
齐梦学. 多功能胶轮车(MSV)在TBM 施工运输中的工程适应性研究[J]. 隧道建设(中英文),2017,37(11):1475-1482. |
| [17] |
|
| [18] |
王丽华,穆炜罡,陈永刚, |
| [19] |
|
| [20] |
李晓健,贾敏涛,赵旭, |
| [21] |
|
| [22] |
GB 16423— 2020 金属非金属矿山安全规程[S]. |
| [23] |
GB 16423— 2020 Safety regulation for metal and nonmetal mines[S]. |
| [24] |
郭忠磊,崔嵛,王春龙. 局部制冷降温技术在井下长距离掘进中的应用[J]. 黄金科学技术,2024,32(5):916-925. |
| [25] |
|
| [26] |
赵林海,李宗利,苟晓斌, |
| [27] |
|
| [28] |
乔红彦. 高地温隧道超长独头施工降温及热环境特征研究[J]. 地下空间与工程学报,2023,19(2):632-639. |
| [29] |
|
| [30] |
柳静献,李国栋,常德强, |
| [31] |
|
| [32] |
赵亚军. 穿越断裂破碎带双洞单线隧道反坡排水设计及应用[J]. 路基工程,2026(2):176-181. |
| [33] |
|
| [34] |
邹春华. 煤矿斜井TBM 施工长距离反坡排水技术[J]. 国防交通工程与技术,2013,11(3):11-13,10. |
| [35] |
|
| [36] |
徐昕,纪鸿朋,徐帅军, |
| [37] |
|
/
| 〈 |
|
〉 |