隧道交叉口挑顶施工动态力学响应分析研究与现场试验
Dynamic mechanical response analysis and field testing of roof-breaking excavation at tunnel intersections
针对西成铁路群科隧道 2 号横洞与正洞交叉口段施工工序繁多、受力复杂且围岩变形不易控制等问题,开展挑顶技术方案及力学研究. 首先,提出一套“横洞爬坡+加强环支护+临时-永久支撑+对称开挖支护”的挑顶开挖支护方案. 然后,采用 Midas 有限元软件建立数值模型精细化分析挑顶施工过程中支护结构及围岩的动态力学响应特性与三维空间效应.最后,结合现场实时监测数据,重点分析了隧道交叉口段支护结构及围岩受力变化特征、拱顶沉降及洞周横向收敛变形规律. 结果表明:施工过程中初支结构应力整体保持在 0.15 MPa~0.76 MPa 范围内,钢拱架结构受力最大为 343 kN;该支护结构有效降低了围岩应力作用下隧道初支的受力及沉降变形,交叉口施工导致加强环附近围岩应力重分布,此处易产生应力集中现象;剖面 1~3 拱顶最大沉降量为 1.12 mm,拱腰最大横向位移量为 1.06 mm,拱顶沉降及拱腰横向位移量相对较小,整体处于稳定可控范围;交叉口左侧上台阶开挖支护过程中,左、右拱腰及右拱肩出现受压转为受拉状态,施工中应对这些部位予以关注,及时支护,防止出现局部掉块现象,确保整个施工过程处于安全稳定状态. 研究成果可以为类似复杂条件下隧道横洞与正洞交叉口的挑顶施工、支护结构设计及围岩稳定性控制提供重要参考.
To address the challenges of numerous construction procedures, complex stress conditions, and difficulty in controlling surrounding rock deformation at the intersection of the No. 2 cross-tunnel and the main tunnel of the Qunke Tunnel on the Xi’an-Chengdu Railway, a roof-breaking excavation scheme and associated mechanical analysis are investigated. First, a comprehensive roof-breaking excavation and support scheme consisting of “cross-tunnel climbing + reinforcing ring support + temporary-to-permanent support + symmetrical excavation and support” is proposed. Subsequently, a numerical model is established using Midas finite element software to finely analyze the dynamic mechanical response characteristics and three-dimensional spatial effects of the support structure and surrounding rock during the roof-breaking construction process. Finally, combined with field real-time monitoring data, the analysis focuses on the stress variation characteristics of the support structure and surrounding rock at the tunnel intersection, as well as crown settlement and lateral convergence deformation patterns around the tunnel periphery. The results show that during construction, the stress of the primary support structure remains within the range of 0.15 MPa to 0.76 MPa, and the maximum axial force in the steel arch frame is 343 kN. This support system effectively reduces the stress and settlement deformation of the primary support induced by surrounding rock pressure. Construction of the intersection induces stress redistribution in the surrounding rock near the reinforcing ring, making this area prone to stress concentration. The maximum crown settlement at Sections 1-3 is 1.12 mm, and the maximum lateral displacement at the arch springline is 1.06 mm; both values are relatively small, indicating that the intersection remains in a stable and controllable state overall. During the excavation and support process of the left-side upper bench at the intersection, the left and right arch springlines and the right arch shoulder transition from compression to tension. These locations should be closely monitored during construction, and timely support should be provided to prevent local rockfalls, ensuring that the entire construction process remains safe and stable. The research findings can provide important references for roof-breaking construction, support structure design, and surrounding rock stability control at tunnel cross-tunnel and main tunnel intersections under similar complex conditions.
| [1] |
刘佼, 贾连辉, 范磊, |
| [2] |
|
| [3] |
张成平, 尚祎凡, 李巍, |
| [4] |
|
| [5] |
|
| [6] |
BIAN K,LIU J,XIAO M,et al. Cause investigation and verification of lining cracking of bifurcation tunnel at huizhou pumped storage power station[J]. Tunnelling and Underground Space Technology, 2016, 54: 123-134. |
| [7] |
章剑 . 软弱围岩斜井转正洞工法动态施工力学行为分析[D]. 成都: 西南交通大学, 2013. |
| [8] |
|
| [9] |
杜传球, 李馨芳, 张博, |
| [10] |
|
| [11] |
张洪达 . 软弱地层辅助坑道进隧道正洞上联洞+门架法挑顶施工技术[J]. 隧道建设(中英文), 2021, 41(12): 2150-2156. |
| [12] |
|
| [13] |
皮圣, 范晓锋, 王明年, |
| [14] |
|
| [15] |
刘毅, 贺祖浩, 王志敏, |
| [16] |
|
| [17] |
杨瑞, 折帅, 王博, |
| [18] |
|
| [19] |
MICHAEL A. Tunnel intersection mechanics:Closed-form pseudo-3D approximations for deformation modeling and shear-failure prediction[J]. Tunnelling and Underground Space Technology, 2025, 158: 106394. |
| [20] |
李大军, 何鹏飞, 宋克志, |
| [21] |
|
| [22] |
|
| [23] |
|
| [24] |
胡辉, 田浩晟, 杨文波, |
| [25] |
|
| [26] |
周嵩, 潘岳, 刘永胜, |
| [27] |
|
| [28] |
薛平, 王长帅 . 某输水隧洞斜井进入主洞挑顶施工关键技术 [J]. 现代隧道技术, 2019, 56(增 2): 688-692. |
| [29] |
|
| [30] |
张学军, 吴慧林, 胡正祥, |
| [31] |
|
| [32] |
|
| [33] |
陈政, 郭春, 谌桂舟, |
| [34] |
|
| [35] |
中华人民共和国住房和城乡建设部 . 混凝土结构设计标准:GB/T 50010-2010[S]. 北京: 中国建筑工业出版社, 2010. |
| [36] |
Ministry of Housing and Urban-Rural Development of the People’s Republic of China. Code for design of concrete structures:GB/T 50010-2010[S].Beijing: China Architecture & Building Press, 2010. (in Chinese) |
国家自然科学基金(52278328)
中交第二公路工程局科技研发项目(GHTJ-07-QT-046)
/
| 〈 |
|
〉 |