The stress of pier-beam connections of Ⅰ-shaped steel-concrete composite rigid frame bridges is complex, the force transmission mechanism and load distribution of pier-beam joints are still unclear, and the calculation method of pier-beam joints is lacking. By comparing the test results of the pier-beam joints of the Ⅰ-shaped composite rigid frame bridges, the verified solid finite element calculation model is adopted. According to the stress state of each component of the pier-beam joint under the action of the axial force, bending moment and shearing force of the pier, the force transmission mechanism and load bearing ratio of the pier-beam joint are analyzed. The design calculation method of each component is established, and the trial design of the Ⅰ-shaped composite rigid frame bridge is carried out. The results show that the force transmission mechanism and path of axial force and bending moment are similar, and the shearing force transmission mechanism is different. The longitudinal beam and the transverse beam bear 45%~55% of the load transfer, respectively. Under the action of axial pressure and axial tension, the load transfer path and the load bearing proportion of the longitudinal beam change. The load directly transmitted by the longitudinal beam is mainly transmitted through the lower flange of the longitudinal beam, and the load transmitted to the transverse beam is mainly borne by the studs of the web. The design of the longitudinal beam should consider the additional stress of the pier load. The transverse beam is calculated according to the uniform load force mode of the simply supported beam. The design of the transverse beam web connector is calculated according to the load transferred to the transverse beam. The studs of the longitudinal beam web and lower flange are arranged by structural requirements. The pier-beam joint of trial design bridges meets the requirements. The finite element calculation results are consistent with the theoretical calculation results. The established pier-beam joint design method can be applied to the design of Ⅰ-shaped composite rigid frame bridges.
墩梁节点构造如图22所示,纵梁在墩顶结构连续,与两道工字横梁在墩顶围成封闭箱形区域,分别在纵梁腹板内侧及下翼缘、横梁腹板内侧设置栓钉连接件,桥墩主钢筋延伸锚固于封闭区域中,不穿过纵梁下翼缘,结合部内按构造要求配置相应箍筋形成钢筋笼,最后在封闭区域内浇筑混凝土使墩梁固结形成整体. 纵梁腹板上设置6×9阵列栓钉,横梁腹板范围内设置6×16阵列栓钉,栓钉规格Φ22×200 mm,间距300 mm.
RAOJ X. Study on seismic design of long-span continuous rigid frame bridge with high pier[D]. Harbin:Harbin Institute of Technology,2015:4-5. (in Chinese)
ZONGZ H, XIAJ, XUC R .Seismic study of high piers of large-span bridges:an overview and research development[J].Journal of Southeast University (Natural Science Edition),2013,43(2):445-452.(in Chinese)
YAOC R, LIY D, LIANGD,et al .Structural type selection for long span bridges in mountainous region[J]. Bridge Construction,2012,42(6):81-86.(in Chinese)
[7]
易辉 .山区高墩曲线连续刚构桥设计探讨[J].公路交通技术,2015,31(6):51-54.
[8]
YIH. Probe into design of high-pier curve continuous steel structure bridges in mountainous area[J]. Technology of Highway and Transport,2015,31(6):51-54.(in Chinese)
[9]
陆晓锦 .钢箱-砼组合连续刚构桥的钢箱梁设计原理研究[D].重庆:重庆交通大学,2012.
[10]
LUX J .Study on design principle of steel box girder of steel box-concrete composite continuous rigid frame bridge[D]. Chongqing:Chongqing Jiaotong University,2012.(in Chinese)
GAOT. Study on bridge deck of assembled steel truss-concrete composite continuous rigid frame bridge[D]. Chongqing:Chongqing Jiaotong University,2013:14-16. (in Chinese)
[13]
ELREMAILYA, AZIZINAMINIA.Design provisions for connections between steel beams and concrete filled tube columns[J].Journal of Constructional Steel Research,2001,57(9):971-995.
BAIL. 3D-FEM simulation analysis of mechanical characteristics of statically indeterminate composite bridge[D]. Beijing: China Academy of Railway Sciences,2003:47-49. (in Chinese)
SONGX Y, BAIL .Mechanical characteristics analysis of pier-girder rigid node of continuous hybrid rigid frame railway bridge[J]. Journal of Beijing Jiaotong University,2011,35(3):77-80.(in Chinese)
[22]
BAMRUNGWONGC, MACHIDAA, NAGATANIT,et al. 3 167 finite element analysis of steel girder-concrete pier rigid connection[J].Transactions of the Japan Concrete Institute,2000,22:331-336.
[23]
SATOT, SHIMIZUI, OTA T, et al. A proposal on design method for rigid section of hybrid rigid-frame bridge[J]. Japanese Journal of Structural Engineering1999,45(A):1431-1438.
[24]
FUJIWARAY, HOSAKAT, HAYASHIKAWAT, et al. Analytical study on load capacity performance of the connection using anchor-beam structure between steel-box-girder and RC pier[J]. Japanese Journal of Structural Engineering. 2008,54(A):786-797.
[25]
MINAKAWAM, TAKASHIMAY, IKEDAK. Experimental study on rigid connection for hybrid rigid frame bridge with a three-sided steel box girder[J]. Japanese Journal of Hokkaido Structural Development, 2003,607:10-17.
[26]
SASAKIY, HIRAIT, AKEHASHIK. Experimental study on rigid connection for hybrid frame bridge consisting of steel girder and reinforced concrete pier[J]. Japanese Journal of Structural Engineering. 1998,44(A):1448-1457.
[27]
LIUY Q, HIKOSAKAH, HUANGL .Finite element analysis of steel girder-to-column connection considering nonlinear behavior of studs[J].Journal of Applied Mechanics,1998,1:481-488.
Steel concrete composite structure subcommittee of Steel bridge technology research institute. Design data base of rigid joint of composite rigid frame bridge[R]. Tokyo:Steel bridge technology research institute,2009:15-16. (in Japanese)
Japan Bridge Construction Association. Reasonable bridge design considerations and verification examples[M]. Tokyo:Japan Bridge Construction Association,2009:110-111. (in Japanese)