To solve the problem of brittle failure at the rigid connection of the traditional h-shaped anti-slide pile beam, a structural optimization scheme was proposed, which simplified the multi-time super-static structure into an inclined “simply supported” structure and proposed the h-shaped inclined beam bearing anti-slide pile. Based on the Winkler elastic foundation beam theory and the structural force degree shift method, the analytical model was established by using the numerical analysis and numerical simulation methods. The results show that the theoretical calculation of the analytical solution is in good agreement with numerical simulation results, which proves the rationality of the calculation model. Compared with the traditional h-shaped pile, the optimized structure has significant advantages, that is, the bending moment at the connection between the rear pile and the beam is greatly reduced, the bending moment at the top of the pile of the front pile is completely released (the reduction is 0), the shear force of the beam is significantly reduced, and the stress concentration phenomenon at the connection is avoided. From the analysis of key geometric parameters, it can be seen that with the increase of the angle of the oblique beam, the internal force and deformation of the oblique beam and the rear pile decrease, and with the increase of the distance between the front and rear piles, the internal force and deformation of the front pile decrease, and the mechanical performance of the system is better.
前后桩间距是h型斜横梁支座式抗滑桩边坡支护过程中的重要影响因素,为探究前后桩间距对h型斜横梁支座式抗滑桩受力特征和结构内力的影响,选定前后桩间距D分别为3b、4b、5b三种h型斜横梁支座式抗滑桩,通过数值模拟揭示h型斜横梁支座式抗滑桩承载能力与前后桩间距的影响关系.抗滑桩模型后桩长l=20 m,桩截面尺寸1.6 m×2.4 m,控制斜横梁角度θ、悬臂段长度l1不变,其中θ=60°,l1=6 m.
WANGW P, YINY P, WANGL C,et al .Studies on status and prospects of anti-slide shaft technology[J]. Hydrogeology & Engineering Geology, 2023, 50(2): 73-83.(in Chinese)
LUOW, XUC J, RONGY,et al .Limit equilibrium analysis on stability of slope reinforced by antislide piles with the nonlinear strength criterion[J]. Journal of Central South University (Science and Technology), 2020, 51(10): 2950-2958.(in Chinese)
LIB, ZHAOR X, MAH S,et al .Analysis on the stress and deformation of circular section h-type anti-slide piles[J].Chinese Journal of Underground Space and Engineering, 2021, 17(Sup.2): 1023-1027.
ZHOUY Q, SHENGQ .Stability of fujiapingzi high and steep landslide under the action of reservoir water level fluctuation and rainfall[J].Journal of Yangtze River Scientific Research Institute,2014,31(2): 57-61.(in Chinese)
HOUX Q, LIUJ R, WANGX F,et al .Study on the mechanical performance of zigzag anti-slide pile on steep inclined slip surface landslide[J].Chinese Journal of Computational Mechanics,2023,40(5): 854-860.(in Chinese)
HOUX Q, RENJ X, ZHENGJ L,et al .Comparative vibrating table test study on optimized seismic performance of h-type anti-sliding pile structures[J].Chinese Journal of Rock Mechanics and Engineering, 2024, 43(12):2892-2907.(in Chinese)
XIAOS G .Analytical method for h-type combined anti-sliding pile retaining landslide or excavated slope and its application to practical projects[J].Rock and Soil Mechanics,2010,31(7):2146-2152.(in Chinese)
ZHANGY J, LIY J, CAOW G,et al .A study of the landslide treating methods with anti-sliding pile of h-type and pre-stressed anchor cable[J].Hydrogeology & Engineering Geology, 2014, 41(5):57-63.(in Chinese)
[17]
YANGC W, TONGX H, WUD S,et al .A new model for mechanical calculation of h-type anti-slide piles[J].Structures,2023,56:104891.
HEG, ZHENGQ Q, YANGS,et al .Analysis on mechanical characteristics of h-type anti-slide piles and cantilevered double-row anti-slide piles[J].Industrial Construction,2024,54(5):192-197.(in Chinese)
[20]
王羽 .h型抗滑桩设计计算方法研究[D].成都:成都理工大学,2011.
[21]
WANGY .Calculation theory and design method research on h-type of anti-sliding pile[D]. Chengdu:Chengdu University of Technology, 2011.(in Chinese)
[22]
张泽坤 .h型抗滑桩的有限元分析[D]. 成都: 西南交通大学,2008.
[23]
ZHANGZ K .Finite element Analysis of h-type slide-resistant pile[D]. Chengdu:Southwest Jiaotong University,2008.(in Chinese)
[24]
欧明喜 .h型抗滑桩力学机理及其工程应用研究[D].重庆:重庆大学,2012.
[25]
OUM X .The study on mechanical mechanism of h-type anti-slide piles and its engineering application[D].Chongqing:Chongqing University,2012.(in Chinese)
[26]
ZHANGH, XINGH F, LIUL L,et al .Field test and numerical analysis on deformation response of H-type antislide pile:case study of longjiayan landslide,China[J].Natural Hazards Review,2021, 22(4): 05021015.
[27]
LIUX R, KOUM M, FENGH,et al .Experimental and numerical studies on the deformation response and retaining mechanism of h-type anti-sliding piles in clay landslide[J].Environmental Earth Sciences, 2018, 77(5): 163.
[28]
赵海玲 .h形抗滑桩变形性状的研究[D].成都: 四川大学,2005.
[29]
ZHAOH L .A study on the deformation performance of h-type sliding-resistant pile[D].Chengdu:Sichuan University,2005.(in Chinese)
LIY, LIY S, WANGY J. Mechanical characteristics and optimization design of h-type antisliding pile[J]. Journal of Wuhan Institute of Technology, 2016, 38(2): 173-177.(in Chinese)
LUOZ X, NIUJ D, LIZ W,et al .Deformation calculation and optimization analysis of h-type double-row piles in deep foundation pit[J].Journal of Railway Science and Engineering,2020,17(7): 1720-1727.(in Chinese)
OUX D, TANGY C, CUIW,et al .Model test and numerical simulation of h-shaped anti-sliding pile[J].Chinese Journal of Rock Mechanics and Engineering,2012,31(9):1936-1943.(in Chinese)
[38]
卞林林 .复合多层滑床条件下h型抗滑桩受力特征研究[D].重庆: 重庆交通大学, 2022.
[39]
BIANL L. Study on mechanical characteristics of h-type anti slide pile under the condition of composite multi-layer sliding bed[D]. Chongqing:Chongqing Jiaotong University, 2022.(in Chinese)
MAOJ Q, XUJ, YANGL. An improved method for stabilising pile by using m-method model to the whole pile[J]. Rock and Soil Mechanics, 2018, 39(4): 1197-1202.(in Chinese)
LIUS N, HOUS N, CAIZ X .Applicability of m-method for horizontal bearing capacity of single pile in Shanghai area[J].Chinese Journal of Geotechnical Engineering,2013,35(Sup.2):721-724.(in Chinese)
JIAOS J, SUA J, HEX .Impact of pile bottom bearing conditions on internal force and displacement of elastic anti-slide pile[J].Safety and Environmental Engineering,2018,25(1):39-44.(in Chinese)
SUIC E, ZHANGT Y, YANGW J,et al .Parameter inversion method for three-parameter model of laterally loaded long pile using m method[J].Journal of Highway and Transportation Research and Development, 2024,41(5):54-60.(in Chinese)
HOUX Q, WANGX F, JIAH L,et al. Calculation of the prestressed tension value of the progressive landslide anchor cable[J]. Advanced Engineering Sciences,2024,56(1):138-147.(in Chinese)
LEIG P, TANGH M, LIC D,et al .Study of improved design method of anti-slide pile socketed segment[J].Chinese Journal of Rock Mechanics and Engineering, 2013, 32(3): 605-614.(in Chinese)
[52]
铁道部第二勘测设计院. 抗滑桩设计与计算[M].北京:中国铁道出版社, 1983.
[53]
Second Survey and Design Institute of the Ministry of Railways. Design and calculation of anti-slide piles[M]. Beijing: China Railway Publishing House, 1983. (in Chinese)
基金资助
甘肃省联合科研基金重大项目(24JRRA800)
甘肃省联合科研基金重大项目(24JRRA799)
Gansu Provincial Joint Scientific ResearchFund Major Project(24JR RA800)
Gansu Provincial Joint Scientific ResearchFund Major Project(24JRRA799)
甘肃省自然资源厅科研基金项目(202406)
Gansu Provincial Department of Natural Resources Scientific Research Fund Project(202406)