双线大直径盾构隧道施工沉降预测
Prediction of settlement during construction of twin large-diameter shield tunnels
为研究大直径泥水盾构双线下穿铁路堤坝施工沉降问题,探讨盾构下穿施工过程中铁路的沉降变形规律,本研究依托济南市济泺路穿黄北延隧道工程开展相关研究。综合利用数值模拟、理论分析与现场监测手段,具体设置 15%、20%、25%等 3 种不同应力释放率的工况并开展分析。研究结果表明:铁路的沉降量总体与应力释放率呈正相关关系,但在铁路中心处该相关性减弱甚至局部呈相反趋势;地面沉降是由盾构穿越前后整个过程中逐渐积累形成的,沉降变化最大的阶段发生在盾构穿越前后 10~ 20 环之间;通过构建地层体积损失与应力释放的关系,对比 Peck 理论与数值模拟沉降规律,发现数值分析所得的沉降预测结果整体大于现场实际监测数据。基于上述结果得出结论,本研究所采用的模型与分析方法具备一定的安全富裕度,能够为安全预测大直径泥水盾构施工沉降风险提供有力的分析工具。
To investigate the construction settlement issue of a twin-tube, large-diameter slurry shield tunnel crossing beneath a railway embankment, and to explore the settlement and deformation patterns of the railway during the shield undercrossing process, relevant research was conducted based on the Northern Extension Project of the Jiluo Road Crossing the Yellow River Tunnel in Jinan. In terms of research methods, numerical simulation, theoretical analysis, and field monitoring were comprehensively utilized. The stress release method was adopted for the numerical analysis, and three working conditions with stress release rates of 15%, 20%, and 25% were established and analyzed. It was shown by the results that the railway settlement was generally positively correlated with the stress release rate; however, this correlation was weakened, and an opposite trend was even locally exhibited at the center of the railway. The ground settlement was observed to gradually accumulate throughout the entire process before and after the shield crossing, and the stage with the maximum settlement variation was observed between 10 and 20 rings before and after the shield passage. Furthermore, by establishing the relationship between stratum volume loss and stress release, the settlement patterns obtained by Peck's formula and numerical simulation were compared. It was found that the settlement prediction results obtained by numerical analysis were generally greater than those obtained from actual field monitoring. Based on the above results, it was concluded that the model and analysis method adopted in this study had a certain safety margin and could provide a powerful analytical tool for the safety prediction of settlement risks during large-diameter slurry shield construction.
| [1] |
|
| [2] |
邹浩, 陈金国. 软土地区盾构下穿施工对铁路路基影响分析: 以杭州地铁 2 号线某区间现场监测为例[J]. 隧道建设(中英文), 2018, 38(2): 199-206. |
| [3] |
|
| [4] |
耿招, 孙光吉, 张世奇, |
| [5] |
|
| [6] |
王东星. 黄土地区盾构下穿既有铁路风险及变形控制技术研究[J]. 安徽建筑, 2023, 30(9): 156-158. |
| [7] |
|
| [8] |
杜明芳, 赵文才, 蒋敏敏. 盾构隧道下穿铁路箱涵引起轨道和地表沉降研究[J]. 河南理工大学学报(自然科学版), 2020, 39(2): 122-129. |
| [9] |
|
| [10] |
林存刚. 盾构掘进地面隆陷及潮汐作用江底盾构隧道性能研究[D]. 杭州: 浙江大学, 2014: 205-209. |
| [11] |
|
| [12] |
杜洪泽, 李守巨. 基于应力释放的盾构隧道开挖地表沉降分析[J]. 隧道建设(中英文), 2020, 40(增刊 1): 241-246. |
| [13] |
|
| [14] |
张振, 董亚博, 罗明福, |
| [15] |
|
| [16] |
阮永芬, 邱龙, 槐以高, |
| [17] |
|
| [18] |
齐永洁, 朱建才, 周建, |
| [19] |
|
| [20] |
郭耀耀, 周爱兆, 涂可诚, |
| [21] |
|
| [22] |
沈青松, 陈烨, 叶盛华, |
| [23] |
|
| [24] |
Peck RB. Deep excavations and tunneling in soft ground[C]//Proceedings of the 7th International Conference on Soil Mechanics and Foundation Engineering. Mexico City, Mexico: International Society for Soil Mechanics and Foundation Engineering (ISSMGE), 1969: 225-290. |
| [25] |
|
| [26] |
Nakamura H, Yamazaki I, Nakahiro T, |
| [27] |
|
国家自然科学基金资助项目(52130808)
/
| 〈 |
|
〉 |