To address the low efficiency, poor safety, and high costs associated with traditional segmental blasting in soft rock conditions, research is conducted on high-efficiency deep-hole blasting techniques using digital electronic detonators. Taking the No. 6 cutting shaft at the Beizhan iron ore mine as the engineering context, an innovative two-stage upward-directed deep-hole rapid shaft sinking blasting plan is designed for the 19.3-meter-deep cutting shaft in soft, fractured rock. Through theoretical calculations, key blasting parameters are determined, including a 50-millisecond inter-hole delay and a 300-millisecond inter-layer delay. A large-diameter empty hole (127 mm) is utilized as a compensation space, with a charge hole diameter of 76 mm. The blast hole layout and initiation sequence are rationally designed. Field test results demonstrate: the top surface remains well-defined after blasting, with good roof integrity and uniform block size. The measured height meets design requirements. Technical-economic analysis reveals: compared to conventional tunneling methods, deep-hole blasting reduces costs by 53%, saves 6 days of construction time, and significantly improves operational efficiency. The two-stage blasting approach effectively minimizes frequent disturbance to the fractured rock mass, preventing rock falls. Combined with precise detonation control using digital electronic detonators, this method substantially enhances operational safety.
ZhangD S, LiuH L, FanG W .Prospects for the connotation and application research of aquifer-protection mining on Yili mining area of Xinjiang[J].Journal of Xinjiang University(Natural Science Edition),2013,30(1):13-18.(in Chinese)
ChenS Y, ZhangA, WuH J,et al .Research and application of shaft excavation technology by once deep-hole blasting[J].Mining Research and Development,2017,37(10):5-10.(in Chinese)
[5]
陈旭 .深孔爆破法施工天井在大红山铁矿的应用[J].中国矿业,2019,28():205-208.
[6]
ChenX .Application of deep hole blasting method in construction of patio in Dahongshan iron mine[J].China Mining Magazine,2019,28(S1):205-208.(in Chinese)
LiX L, YanS Q, WangJ G,et al .Precise time-delay blasting parameters of stratified single blasting well completion[J].Chinese Journal of High Pressure Physics,2024,38(2):025302.(in Chinese)
DongY Q, XuW S, QianZ Q,et al .Experimental research on cutting blasting into cavity from blind raise[J].Chinese Journal of Underground Space and Engineering,2023,19(4):1169-1176.(in Chinese)
LiH W, WuY M, WuL H,et al .Experimental study on delay time optimization of tunnel cutting holes and caving holes under electronic detonator initiation condition[J].Chinese Journal of High Pressure Physics,2023,37(1):015301.(in Chinese)
LiW D, JianX M, PanY .Research on the one-time shaft excavation by medium-deep hole blasting in the JM mine of Serbia Zijin copper DOO[J].Mining Research and Development, 2023,43(4):50-53.(in Chinese)
LiQ Y, LiX B, FanZ P,et al .One time deep hole raise blasting technology and case study[J].Chinese Journal of Rock Mechanics and Engineering,2013,32(4):664-670.(in Chinese)
[19]
LiQ Y, LiuK, LiX B,et al .Cutting parameter optimization for one-step shaft excavation technique based on parallel cutting method[J].Transactions of Nonferrous Metals Society of China,2018,28:1413-1423.
LiuK, LiX B, LiQ Y,et al .Improved TOPSIS-CV method of cut blasting mode evaluation in one-step raise excavation with burn cut[J].Journal of Central South University(Science and Technology),2017,48(9):2484-2490.(in Chinese)
[22]
LiuX L, LuoK B, LiX B,et al .Cap rock blast caving of cavity under open pit bench[J].Transactions of Nonferrous Metals Society of China,2017,27:648-655.
LiT C, LiuH Q .Optimized cut hole stemming length for shaft excavation using one-step deep-hole blasting[J].Journal of China University of Mining & Technology,2012,41(3):384-389.(in Chinese)
ZhouC B, GuR G, LuoX D .Numerical simulation on cutting mode of shaft excavation by one-step deep-hole blasting in hard rock[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(13):2298-2303.(in Chinese)
[29]
姜科 .切割井一次爆破成井实践[J].金属矿山,2003(1):11-12+47.
[30]
JiangK .Practice of cut-raise formation by one blasting[J].Metal Mine,2003(1):11-12+47.(in Chinese)
ZhouL, LiuX S, ZhouA M,et al .Study on fast drifting technology of high-level ore chute[J].Mining Research and Development,2016,36(8):21-23.(in Chinese)