随着城市化进程的加快,地铁作为高效、低碳的公共交通方式,在缓解城市交通压力中发挥着关键作用。但地铁施工多处于城市核心区域,施工环境复杂、技术难度高,风险隐患突出,其中施工技术风险与地质与自然环境风险是影响项目顺利推进的核心因素。本文结合地铁施工实际,重点分析这两大类风险的具体表现形式,剖析风险产生的根源,提出针对性的应对策略,为地铁施工项目风险管控提供理论参考与实践借鉴,保障项目安全、高效、有序实施。
Abstract
With the acceleration of urbanization, subways have become a key solution for alleviating urban traffic congestion as an efficient and low-carbon public transport mode. However, subway construction projects are predominantly located in urban core areas, where complex construction environments, high technical challenges, and prominent risks coexist. Among these, construction technical risks and geological/natural environmental risks are the primary factors affecting project progress. This paper, based on practical subway construction experiences, focuses on analyzing the specific manifestations of these two major risk categories, examining their root causes, and proposing targeted countermeasures. The study aims to provide theoretical references and practical insights for risk management in subway construction projects, ensuring their safe, efficient, and orderly implementation.
关键词
Key words
[Author(id=1329818452643615286, tenantId=1045748351789510663, journalId=1327662952484470822, articleId=1329810790602064829, orderNo=0, firstName=null, middleName=null, lastName=null, nameCn=null, orcid=null, stid=null, country=null, authorPic=null, dead=0, email=null, emailSecond=null, emailThird=null, correspondingAuthor=0, authorType=1, ext={EN=AuthorExt(id=1329818452714918459, tenantId=1045748351789510663, journalId=1327662952484470822, articleId=1329810790602064829, authorId=1329818452643615286, language=EN, stringName=Qihui Wei, firstName=Qihui, middleName=null, lastName=Wei, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=null, address=China Railway Beijing Engineering Bureau Group Urban Rail Transit Engineering Co., Ltd., Hefei, Anhui, 230088, China, bio=null, bioImg=null, bioContent=null, aboutCorrespAuthor=null), CN=AuthorExt(id=1329818452765250111, tenantId=1045748351789510663, journalId=1327662952484470822, articleId=1329810790602064829, authorId=1329818452643615286, language=CN, stringName=未其辉, firstName=null, middleName=null, lastName=null, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=null, address=中铁北京工程局集团城市轨道交通工程有限公司, 中国·安徽 合肥 230088, bio={"content":"未其辉(1992-),男,中国甘肃白银人,本科,工程师,从事市政工程技术管理研究。
"}, bioImg=null, bioContent=未其辉(1992-),男,中国甘肃白银人,本科,工程师,从事市政工程技术管理研究。
, aboutCorrespAuthor=null)}, companyList=[AuthorCompany(id=1329818452563923504, tenantId=1045748351789510663, journalId=1327662952484470822, articleId=1329810790602064829, xref=null, ext=[AuthorCompanyExt(id=1329818452580700722, tenantId=1045748351789510663, journalId=1327662952484470822, articleId=1329810790602064829, companyId=1329818452563923504, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=China Railway Beijing Engineering Bureau Group Urban Rail Transit Engineering Co., Ltd., Hefei, Anhui, 230088, China), AuthorCompanyExt(id=1329818452597477939, tenantId=1045748351789510663, journalId=1327662952484470822, articleId=1329810790602064829, companyId=1329818452563923504, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=中铁北京工程局集团城市轨道交通工程有限公司, 中国·安徽 合肥 230088)])])]
未其辉.
地铁施工项目风险管理与应对策略[J].
工程设计与施工, 2026, 8(2): 66-68 DOI:10.12349/edc.v8i2.9313