预应力管桩在深厚砂层中的施工技术分析

闵晓文 ,  王昆举 ,  赵宏宇 ,  王赫 ,  鲁鑫城

工程设计与施工 ›› 2026, Vol. 8 ›› Issue (2) : 86 -89.

PDF (1242KB)
工程设计与施工 ›› 2026, Vol. 8 ›› Issue (2) : 86 -89. DOI: 10.12349/edc.v8i2.9319

预应力管桩在深厚砂层中的施工技术分析

作者信息 +

Analysis of construction technology for prestressed pipe piles in thick sand layers

Author information +
文章历史 +
PDF (1271K)

摘要

本文依托佛山市汾江北路安置房项目桩基础工程,针对施工预应力管桩时无法穿透砂层的问题展开了施工技术的分析,优化了施工方案,后续施工内容经过现场检测验证。结果表明:沉桩阻力主要来源于桩周土体产生的挤土效应,优化桩尖类型效果甚微,需增加引孔措施;根据试桩情况将地勘报告中砂层厚度较大的区域进行区分,并进行方案优化;通过静载、抗拔检测试验结果显示优化方案能够满足设计需求的承载力。

Abstract

Based on the pile foundation project of the resettlement housing project on Fenjiang North Road in Foshan City, this article analyzes the construction technology to address the issue of unable to penetrate the sand layer during the construction of prestressed pipe piles. The construction plan is optimized, and subsequent construction content is verified through on-site inspection. The results show that the resistance to pile sinking mainly comes from the soil compaction effect generated by the soil surrounding the pile. Optimizing the type of pile tip has little effect, and it is necessary to increase the measures for pilot holes. Based on the test pile situation, areas with a large thickness of sand layer in the geological survey report are distinguished, and the plan is optimized. The results of static load and uplift testing show that the optimized plan can meet the design requirements for bearing capacity.

关键词

深厚砂层 / 预应力管桩 / 引孔 / 桩尖 / 承载力

Key words

Deep sand layer / Prestressed pipe pile / Pilot hole / Pile tip / Bearing capacity

引用本文

引用格式 ▾
闵晓文,王昆举,赵宏宇,王赫,鲁鑫城. 预应力管桩在深厚砂层中的施工技术分析[J]. 工程设计与施工, 2026, 8(2): 86-89 DOI:10.12349/edc.v8i2.9319

登录浏览全文

4963

注册一个新账户 忘记密码

参考文献

[1]

汤红军, 张虎, 金来建. 南昌某预应力管桩沉桩问题及处理[J]. 建筑结构, 2017, 47(S1): 1082-1084.DOI: 10.19701/j.jzjg.2017.s1.233.

[2]

孙亚哲, 高倚山, 张建龙, 等. PHC桩穿越深厚密实砂层可打性分析及现场试验研究[J]. 工程地质学报, 2015, 23(06): 1079-1084.DOI: 10.13544/j.cnki.jeg.2015.06.007.

[3]

张广彬. 大直径静压管桩在厚层密实砂中的施工技术[J]. 西部探矿工程, 2015, 27(04): 196-198.

[4]

王绍才. 深厚砂层地区预应力管桩方案分析[J]. 低碳世界, 2023, 13(10): 91-93.DOI: 10.16844/j.cnki.cn10-1007/tk.2023.10.024.