地基基础与上部结构共同作用分析取消沉降后浇带的应用

赵紫团 ,  宋立 ,  贾宁 ,  周圣斌 ,  王亚辉

工程设计与施工 ›› 2026, Vol. 8 ›› Issue (2) : 136 -139.

PDF (1530KB)
工程设计与施工 ›› 2026, Vol. 8 ›› Issue (2) : 136 -139. DOI: 10.12349/edc.v8i2.9334

地基基础与上部结构共同作用分析取消沉降后浇带的应用

作者信息 +

The Application of Eliminating Post-pouring Belt for Settlement in the Analysis of the Interaction between Foundation and Superstructure

Author information +
文章历史 +
PDF (1566K)

摘要

随着城市建设中地下空间的利用,主楼与地下车库的一体建筑越来越多,主楼与地下车库之间的差异沉降通常采取在主楼与地下车库之间设置沉降后浇带来解决,施工期间主楼可以自由沉降,待主楼结构施工完毕后再将后浇带封闭。但是后浇带施工涉及到二次作业,大大增加施工的复杂性,严重影响施工工期。本文通过一个工程实例,介绍了地基基础与上部结构协同作用分析在取消主楼与地下车库之间的沉降后浇带的应用。通过协同作用分析,主楼与地下车库基础范围内沉降差满足规范要求,不需要设置沉降后浇带。取消沉降后浇带可降低后浇带部位的渗水或者防水失效的可能性,使施工更加安全,建筑物质量更加可靠、缩短施工工期。

Abstract

With the utilization of underground space in urban construction, the integrated buildings of main buildings and underground garages are becoming increasingly common. The differential settlement between the main building and the underground garage is usually addressed by setting a post-poured strip between them. During construction, the main building can settle freely, and the post-poured strip is closed after the main building structure is completed. However, the construction of the post-poured strip involves secondary operations, significantly increasing the complexity of construction and seriously affecting the construction period. This paper, through an engineering example, introduces the application of the collaborative analysis of foundation and superstructure in eliminating the post-poured strip between the main building and the underground garage. Through the collaborative analysis, the settlement difference within the foundation range of the main building and the underground garage meets the code requirements, and there is no need to set a post-poured strip. Eliminating the post-poured strip can reduce the possibility of water seepage or waterproofing failure at the post-poured strip location, making construction safer, improving the reliability of building quality, and shortening the construction period.

关键词

地基基础与上部结构协同作用分析 / 沉降后浇带 / 差异沉降

Key words

Analysis of the Synergistic Effect between Foundation and Superstructure / Post-pouring Belt for Settlement / Differential Settlement

引用本文

引用格式 ▾
赵紫团,宋立,贾宁,周圣斌,王亚辉. 地基基础与上部结构共同作用分析取消沉降后浇带的应用[J]. 工程设计与施工, 2026, 8(2): 136-139 DOI:10.12349/edc.v8i2.9334

登录浏览全文

4963

注册一个新账户 忘记密码

参考文献

[1]

王曙光, 邸道怀, 周圣斌. 中低压缩性地基上设置沉降后浇带的主裙楼沉降及基底反力分布特征[J]. 岩土力学, 2014(S2): 6.DOI: CNKI:SUN:YTLX.0.2014-S2-044.

[2]

窦远明, 沙秦南. 考虑共同作用下主裙楼建筑后浇带力学性能和封闭时机研究[J]. 建筑技术, 2017, 48(2): 4.DOI: 10.3969/j.issn.1000-4726.2017.02.029.

[3]

孙宏伟, 常为华, 宫贞超, 等. 中国尊大厦桩筏协同作用计算与设计分析[J]. 建筑结构, 2014(20): 6.DOI: CNKI:SUN:JCJG.0.2014-20-024.

[4]

Wang Y , Li J , Li J , et al. Calculation and analysis of the foundation settlement of an office building in Tongzhou[J]. Urban Construction and Management Engineering IV, 2024: 635-641.DOI: 10.1201/9781032626444-83.

[5]

邸道怀. 高层建筑与裙房基础整体连接设计时基底反力和变形规律研究[J]. 工业建筑, 2002.DOI: CNKI:SUN:GYJZ.0.2002-12-002.

AI Summary AI Mindmap
PDF (1530KB)

0

访问

0

被引

详细

导航
相关文章

AI思维导图

/

〈 〉