尾矿库地质灾害防控工程施工技术优化

赵紫团

工程设计与施工 ›› 2026, Vol. 8 ›› Issue (3) : 76 -78.

PDF (1093KB)
工程设计与施工 ›› 2026, Vol. 8 ›› Issue (3) : 76 -78. DOI: 10.12349/edc.v8i3.9839

尾矿库地质灾害防控工程施工技术优化

作者信息 +

Optimization of Construction Technology for Geological Disaster Prevention and Control in Tailings Dams

Author information +
文章历史 +
PDF (1118K)

摘要

在绿色矿山与极端天气叠加的施工情境下,尾矿库在坝体稳定、渗流控制与监测响应方面存在结构性短板。本文以施工期稳定控制、渗流路径切断与监测预警闭环为主线,提出高聚物改性土与薄层快循环压实、预应力锚固与反压土协同提升抗剪强度,复合土工膜与连续盲沟重构导渗通道,多源传感与边缘计算驱动的联动阈值体系。以某尾矿库为例,实施后坝体稳定性系数由1.15提升至1.35,渗流速度由0.20降至0.05米每日,预警响应时间由30分钟缩短至5分钟,同时综合费用下降12,险情发生率下降80,渗流污染指数下降60。结果表明,该一体化优化路径能够在雨季窗口受限条件下实现风险前瞻管控与降本增效的协同。

Abstract

Under the construction context of green mines and extreme weather, tailing dams have structural deficiencies in terms of dam stability, seepage control, and monitoring response. This paper, with the main thread of stability control during the construction period, seepage path interruption, and the closed-loop of monitoring and early warning, proposes an integrated optimization path of polymer-modified soil and thin-layer fast-cycle compaction, pre-stressed anchoring and counter-pressure soil to enhance shear strength, composite geomembrane and continuous blind ditches to reconstruct seepage channels, and multi-source sensing and edge computing-driven linkage threshold system. Taking a certain tailing dam as an example, after implementation, the stability safety factor of the dam body increased from 1.15 to 1.35, the seepage velocity decreased from 0.20 to 0.05 meters per day, the early warning response time was shortened from 30 minutes to 5 minutes, and the comprehensive cost decreased by 12%, the risk occurrence rate decreased by 80%, and the seepage pollution index decreased by 60%. The results show that this integrated optimization path can achieve the synergy of risk forward control and cost reduction and efficiency improvement under the condition of limited rainy season window.

关键词

尾矿库 / 坝体稳定 / 渗流控制 / 监测预警 / 极端天气

Key words

tailings pond / dam body stability / seepage control / monitoring and early warning / extreme weather

引用本文

引用格式 ▾
赵紫团. 尾矿库地质灾害防控工程施工技术优化[J]. 工程设计与施工, 2026, 8(3): 76-78 DOI:10.12349/edc.v8i3.9839

登录浏览全文

4963

注册一个新账户 忘记密码

参考文献

[1]

马晓旭, 赵乐萱, 王睿齐, 傅灿, 罗玉龙. 某尾矿库塌坑处理方案的三维渗流优化比选研究[J]. 三峡大学学报(自然科学版), 2025, 47(04): 11-15.

[2]

沈欣, 果召强, 黄旭东, 高永, 余家骥, 潘秋景. 地震作用下某尾矿坝永久位移分析及稳定性评估[J]. 合肥工业大学学报(自然科学版), 2025, 48(06): 839-845.

[3]

潘凤珍. 单薄分水岭和堆渣副坝地基塑性混凝土防渗墙施工技术[J]. 水泥, 2025,(12): 95-97.

[4]

高鹏飞, 高涛, 史夏杰, 耿超, 李全明, 梁辉, 李伟, 衡钇林. 基于排土场-尾矿库联建系统主要影响因素的稳定性分析研究[J]. 中国安全生产科学技术, 2025, 21(11): 107-113.

[5]

徐亮, 李亮, 李春立, 文嘉辉, 王超. 基于解耦Newmark法与代表性滑动面的扩容尾矿坝动力稳定可靠度分析[J]. 金属矿山, 2025,(06): 212-220.

AI Summary AI Mindmap
PDF (1093KB)

0

访问

0

被引

详细

导航
相关文章

AI思维导图

/

〈 〉