高速铁路桥梁无砟轨道施工控制技术研究
Research on Construction Control Technology for Ballastless Track of High-speed Railway Bridge
无砟轨道具备高稳定性、维修量小、平顺性好的特点,是当前高速铁路桥梁采用的主流轨道形式,施工质量直接影响高速铁路的行车安全、运营效率与服役寿命。本文结合高速铁路桥梁无砟轨道施工实践,梳理施工控制核心技术,明确关键控制要点,优化现有控制方案,重点解决施工阶段精度控制、变形控制两类核心问题,可为同类工程施工提供技术参考,同时为无砟轨道施工的精细化、标准化改进提供实践依据,保障高速铁路运营阶段的安全稳定。
Ballastless tracks, characterized by high stability, minimal maintenance requirements, and excellent ride comfort, have become the predominant track configuration for modern high-speed railway bridges. Construction quality directly impacts operational safety, service efficiency, and service life of high-speed rail systems. Drawing on practical experience in ballastless track construction for high-speed railway bridges, this study systematically identifies core construction control technologies, clarifies critical control parameters, and optimizes existing control strategies. By focusing on precision control during construction phases and deformation management, the research provides technical references for similar projects while establishing practical benchmarks for refined and standardized ballastless track construction practices, ultimately ensuring operational safety and stability in high-speed rail operations.
| [1] |
李晓东. 高速铁路桥梁及无砟轨道工程施工测量方法[J]. 中国高新科技, 2021(7): 104-105. |
| [2] |
刘平均. 高速铁路某系杆拱桥无砟轨道施工技术研究[J]. 施工技术(中英文), 2022, 51(24): 56-59, 98. |
| [3] |
邓非凡, 王波, 杨燕, |
| [4] |
孙洪斌, 王品皓, 渠述锋, |
| [5] |
陈默. 高速铁路CRTS双块式无砟轨道施工注意事项[J]. 科学技术创新, 2024(10): 199-202. |
/
| 〈 |
|
〉 |