摘要
地铁工程具有施工环境受限、工序衔接紧密、组织复杂度高等特点,施工组织与关键工序协同水平直接影响工程进度、安全与质量控制效果。围绕地铁工程施工实践需求,系统分析施工组织结构特征及其运行逻辑,梳理施工组织优化在资源配置、进度统筹与风险控制中的核心作用。在此基础上,聚焦盾构推进、车站主体施工、区间结构转换等关键工序,探讨工序之间的时序耦合关系与协同控制要点,构建以施工组织优化为支撑的关键工序协同控制思路。研究强调通过组织层面的统筹协调与过程控制机制,实现多工序协同运行,提升施工系统整体稳定性与实施效率,为地铁工程高效推进提供理论参考。
Abstract
Metro engineering is characterized by constrained construction environments,closely linked construction processes,and a high level of organizational complexity.The coordination between construction organization and critical construction processes has a direct impact on project schedule,safety,and quality control.Based on the practical demands of metro construction,this study systematically analyzes the structural characteristics and operational logic of construction organization,and clarifies the core role of organizational optimization in resource allocation,schedule coordination,and risk control.On this basis,key processes such as shield tunneling,station main structure construction,and structural transitions between sections are examined,with emphasis on the temporal coupling relationships and coordination control requirements among these processes.A coordination control framework for critical processes supported by optimized construction organization is proposed.The study highlights that organizational-level coordination and process control mechanisms can realize the synergistic operation of multiple processes,enhance the overall stability and implementation efficiency of the construction system,and provide theoretical support for the efficient advancement of metro projects.
关键词
Key words
[Author(id=1329803585333301537, tenantId=1045748351789510663, journalId=1327662952484470822, articleId=1329803584322474253, orderNo=0, firstName=null, middleName=null, lastName=null, nameCn=null, orcid=null, stid=null, country=null, authorPic=null, dead=0, email=null, emailSecond=null, emailThird=null, correspondingAuthor=0, authorType=1, ext={EN=AuthorExt(id=1329803585400410403, tenantId=1045748351789510663, journalId=1327662952484470822, articleId=1329803584322474253, authorId=1329803585333301537, language=EN, stringName=Jie Li, firstName=Jie, middleName=null, lastName=Li, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=null, address=Shanghai Tunnel Engineering Co., Ltd. Zhejiang Branch, Hangzhou, Zhejiang, 310000, China, bio=null, bioImg=null, bioContent=null, aboutCorrespAuthor=null), CN=AuthorExt(id=1329803585446547748, tenantId=1045748351789510663, journalId=1327662952484470822, articleId=1329803584322474253, authorId=1329803585333301537, language=CN, stringName=李杰, firstName=null, middleName=null, lastName=null, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=null, address=上海隧道工程有限公司 浙江分公司, 中国·浙江 杭州 310000, bio={"content":"李杰(1990-),男,中国山东临沭人,本科,工程师,从事建筑施工研究。
"}, bioImg=null, bioContent=李杰(1990-),男,中国山东临沭人,本科,工程师,从事建筑施工研究。
, aboutCorrespAuthor=null)}, companyList=[AuthorCompany(id=1329803585215861021, tenantId=1045748351789510663, journalId=1327662952484470822, articleId=1329803584322474253, xref=null, ext=[AuthorCompanyExt(id=1329803585241026846, tenantId=1045748351789510663, journalId=1327662952484470822, articleId=1329803584322474253, companyId=1329803585215861021, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=Shanghai Tunnel Engineering Co., Ltd. Zhejiang Branch, Hangzhou, Zhejiang, 310000, China), AuthorCompanyExt(id=1329803585287164191, tenantId=1045748351789510663, journalId=1327662952484470822, articleId=1329803584322474253, companyId=1329803585215861021, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=上海隧道工程有限公司 浙江分公司, 中国·浙江 杭州 310000)])])]
李杰.
地铁工程施工组织优化与关键工序协同控制研究[J].
工程设计与施工, 2026, 8(4): 22-24 DOI:10.12349/edc.v8i4.9965
| [1] |
白光荣, 彭放. PDCA循环法在贵阳地铁隧道病害整治施工组织中的应用[J]. 四川水泥, 2025,(03): 188-190.
|
| [2] |
贾倩. 基于WSR的地铁工程施工安全风险分析与管理研究[D].导师:王丹;贾崇. 辽宁工程技术大学, 2023.
|
| [3] |
潘雯. 地铁总承包项目施工成本管理影响因素研究[D].导师:郭晓剑. 江西理工大学, 2023.
|
| [4] |
崔芳兵. 基于BIM的地铁项目进度智能优化与管理研究[D].导师:郑莲琼. 福建工程学院, 2023.
|