桥梁高墩施工中模板安装技术要点分析

作者信息 +

Analysis of Key Points of Formwork Installation Technology in High Pier Construction of Bridge

Author information +
文章历史 +
PDF (1418K)

摘要

依托45 m高墩工程,提出“地质-材料-工艺-监测”一体化模板安装技术体系。前期通过钻探与标准贯入将地基承载力稳定在250 kPa以上;工厂化钢模板面板厚6 mm、弹性模量2.0×10⁵ MPa,预拼平整度≤2 mm,周转80次仍无大修。现场采用全站仪每0.5 m复测,垂直度偏差控制在墩高1/1000以内,实测合格率98.5%;接缝宽度≤1 mm,聚氨酯密封胶+膨胀橡胶条组合使渗漏率降至0。对拉螺栓按1.5 m×2 m交错布设,预紧力取设计值60%–80%,扭矩达标率99.2%。工艺联动后实现安装效率5 m/d,较目标提升11%,工期提前2 d。结果表明:刚度-密封-监测协同控制可同步保证高墩几何精度、安全储备与周转效益,为百米级高墩模板施工提供可复制的量化路径。

Abstract

Based on the 45-meter high pier project, an integrated template installation technology system of “geology-material-process- monitoring” was proposed. In the early stage, the bearing capacity of the foundation was stabilized at over 250 kPa through drilling and standard penetration tests; the factory-made steel template panels were 6 mm thick, with an elastic modulus of 2.0×10⁵ MPa, the pre-assembled flatness was ≤ 2 mm, and it could be reused 80 times without major repairs. On-site, the total station was used for re-measurement every 0.5 m, and the verticality deviation was controlled within 1/1000 of the pier height, with a measured pass rate of 98.5%; the joint width was ≤ 1 mm, and the polyurethane sealant + expansion rubber strip combination reduced the leakage rate to 0. The tension bolts were arranged at 1.5 m×2 m intervals, with the pre-tightening force taking 60%-80% of the design value, and the torque compliance rate was 99.2%. After process integration, the installation efficiency reached 5 m/d, which was 11% higher than the target and 2 days ahead of schedule. The results show that the coordinated control of stiffness-sealing-monitoring can simultaneously ensure the geometric accuracy, safety reserve and turnover efficiency of the high pier. This provides a replicable quantitative path for the construction of high-level pier templates.

关键词

桥梁高墩 / 钢模板 / 安装精度 / 垂直度控制 / 周转效益

Key words

bridge high pier / steel template / installation accuracy / verticality control / turnover efficiency

引用本文

引用格式 ▾
张俊. 桥梁高墩施工中模板安装技术要点分析[J]. 工程设计与施工, 2026, 8(4): 28-30 DOI:10.12349/edc.v8i4.9967

登录浏览全文

4963

注册一个新账户 忘记密码

参考文献

[1]

汪江洪. 基于装配式技术的桥梁模板快速搭建系统[J]. 中国建筑金属结构, 2025, 24(11): 149-151.

[2]

李庆辉; 伍柏宏. 桥梁墩身模板与挂篮模板模块化周转设计研究. 建筑技术开发, 2024(09)

[3]

曾锋. 桥梁结构物模板测控定位装置技术. 科学技术创新, 2025(09)

[4]

李家荣; 罗七斤; 查国正; 蒋文龙; 杨斌; 刘大春. 真空冶金的研究现状与进展. 有色金属(冶炼部分), 2025(08)

[5]

张宪堂; 高熙阳; 田新海; 徐帮树; 周红敏. 基于智能设计的隧道爆破课程设计教学实践研究. 爆破, 2025(03)

[6]

孙小飞; 田龙飞; 杨璐. 整体预制π型组合梁混凝土固化分布式光纤监测研究[J]. 公路, 2023(02)

AI Summary AI Mindmap
PDF (1386KB)

0

访问

0

被引

详细

导航
相关文章

AI思维导图

/

〈 〉