PDF (1286K)
摘要
建筑工程进度管理是工程项目管理的重要组成部分,其直接关系到项目成本控制、资源配置效率以及工程质量实现。在工程实施过程中,受设计变更、施工组织、资源供应及外部环境等多方面因素影响,进度偏差现象较为普遍。随着工程规模不断扩大与建设周期复杂化,传统进度管理方式已难以满足精细化管理需求。本文围绕建筑工程进度管理的关键影响因素展开分析,结合工程实践探讨进度控制中存在的问题,并提出针对性的优化措施。研究表明,通过完善计划体系、强化过程控制及引入信息化手段,可以有效提升进度管理水平,实现工程项目高效推进。
Abstract
Construction project schedule management constitutes a critical component of engineering project management, directly impacting cost control, resource allocation efficiency, and quality assurance. During implementation, schedule deviations frequently occur due to multifaceted factors including design modifications, construction organization, resource supply chain constraints, and external environmental influences. With the continuous expansion of project scales and increasing complexity of construction timelines, traditional scheduling methodologies have proven inadequate for refined management requirements. This study analyzes key influencing factors in construction project schedule management, examines challenges in schedule control through practical engineering case studies, and proposes targeted optimization strategies. Research findings demonstrate that enhancing planning frameworks, strengthening process control mechanisms, and adopting digitalization solutions can significantly improve schedule management effectiveness, thereby facilitating efficient project advancement.
关键词
Key words
[Author(id=1329803586939531771, tenantId=1045748351789510663, journalId=1327662952484470822, articleId=1329803586012590564, orderNo=0, firstName=null, middleName=null, lastName=null, nameCn=null, orcid=null, stid=null, country=null, authorPic=null, dead=0, email=null, emailSecond=null, emailThird=null, correspondingAuthor=0, authorType=1, ext={EN=AuthorExt(id=1329803587002446334, tenantId=1045748351789510663, journalId=1327662952484470822, articleId=1329803586012590564, authorId=1329803586939531771, language=EN, stringName=Bo Yang, firstName=Bo, middleName=null, lastName=Yang, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=null, address=Zhongchu Rongye Construction Group Co., Ltd., Enshi, Hubei, 445000, China, bio=null, bioImg=null, bioContent=null, aboutCorrespAuthor=null), CN=AuthorExt(id=1329803587048583678, tenantId=1045748351789510663, journalId=1327662952484470822, articleId=1329803586012590564, authorId=1329803586939531771, language=CN, stringName=杨波, firstName=null, middleName=null, lastName=null, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=null, address=中楚荣业建工集团有限公司, 中国·湖北 恩施 445000, bio={"content":"杨波(1976-),侗族,男,中国湖北宣恩人,本科,高级经济师,从事建筑工程研究。
"}, bioImg=null, bioContent=杨波(1976-),侗族,男,中国湖北宣恩人,本科,高级经济师,从事建筑工程研究。
, aboutCorrespAuthor=null)}, companyList=[AuthorCompany(id=1329803586864034295, tenantId=1045748351789510663, journalId=1327662952484470822, articleId=1329803586012590564, xref=null, ext=[AuthorCompanyExt(id=1329803586880811511, tenantId=1045748351789510663, journalId=1327662952484470822, articleId=1329803586012590564, companyId=1329803586864034295, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=Zhongchu Rongye Construction Group Co., Ltd., Enshi, Hubei, 445000, China), AuthorCompanyExt(id=1329803586893394424, tenantId=1045748351789510663, journalId=1327662952484470822, articleId=1329803586012590564, companyId=1329803586864034295, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=中楚荣业建工集团有限公司, 中国·湖北 恩施 445000)])])]
杨波.
建筑工程进度管理影响因素及优化措施探讨[J].
工程设计与施工, 2026, 8(4): 122-124 DOI:10.12349/edc.v8i4.9996
| [1] |
霍静. 建筑工程管理的关键影响因素及优化对策[J]. 建材发展导向, 2025, 23(24): 85-87.
|
| [2] |
李仁. 建筑工程管理中进度管理的影响因素及优化策略[C]// 河南省豫商经济文化交流协会.2025中国城建经济研讨会论文集.舟山普陀城市投资发展集团有限公司; 2025: 62-64.
|
| [3] |
柯文杰. 建筑工程项目进度管理影响因素及合理控制措施分析[J]. 建筑与预算, 2021, (04): 104-106.
|