地下二层深基坑地下连续墙与内支撑协同支护研究
Research on the Coordinated Support of the Underground Continuous Wall and Internal Support in a Deep Foundation Pit at the Second Underground Level
在地下二层深基坑工程里,因开挖深度大、周边环境繁复及地下水作用明显,支护结构设计面对较高的技术难度,地下连续墙以及内支撑系统构成重点支护形式,凭借协同作用有效控制基坑变形、保障施工安全以及周边建筑的稳定。本文依据工程特性、地质条件及施工约束,分析地下连续墙承载机制及内支撑的力学性能,讨论两者于不同施工阶段的协同效应及改良布置方法,研究说明,合理设计地下连续墙以及内支撑系统,融合施工监测及力学分析,可明显减少基坑沉降跟侧向位移,加强支护体系整体稳定性与施工安全水平,然后为类似深基坑工程给予理论以及技术参照。
Building a two level underground deep excavation runs into big technical problems because the hole is deep, surroundings are messy, and groundwater plays a strong role. Diaphragm wall and internal support system act as main retaining parts. They work together to keep deformation under control and protect nearby buildings while keeping workers safe. This paper looks at how diaphragm wall carries load and how internal support behaves mechanically, taking into account site features, soil conditions, and limits during construction. It also checks how these two systems team up and where best to place them at each building phase. Findings show that if diaphragm wall and supports are well designed, and you add real time monitoring plus mechanical checks, settlement and sideways movement drop a lot. That boosts stability and safety for whole setup, giving useful ideas for other deep digs like this.
| [1] |
程勇. 宝山站大型深基坑地下连续墙施工质量控制与分析[J]. 中华建设, 2026,(04): 174-176. |
| [2] |
张磊, 安辰亮, 宋连河, |
| [3] |
唐瑞. 地下连续墙在地铁车站明挖深基坑围护中的应用研究[J]. 石河子科技, 2026,(01): 62-63. |
| [4] |
孙维明, 韩文超, 孔涛. 地下深基坑连续墙支护技术的应用及效果分析[J]. 四川水泥, 2024,(09): 120-122.DOI: 10.20198/j.cnki.scsn.2024.09.075. |
/
| 〈 |
|
〉 |