抽水蓄能电站岩壁吊车梁快速开挖支护施工技术
Construction Technology for Rapid Excavation and Support of Rock Wall Crane Beams in Pumped Storage Power Stations
岩壁吊车梁是抽水蓄能电站地下厂房的承重结构,开挖成型质量及支护可靠性直接决定厂房施工安全及后期运行稳定性,且施工进度会影响整个电站建设工期。本文针对安徽宁国抽水蓄能电站岩壁吊车梁施工中存在的断面复杂及成型难度大等问题,结合工程地质条件及工程量特点提出了一套快速开挖支护施工技术流程,重点优化施工分区流水作业模式,采用保护层高效开挖、岩台“双向预裂爆破”成型等关键技术,同时配套砂浆锚杆“先注浆后插杆”及预应力锚杆速凝锚固等高效支护工艺,旨在为同类抽水蓄能电站岩壁吊车梁施工提供参考。
As the load-bearing structure of the underground powerhouse in pumped-storage power stations, the excavation quality and support reliability of rock wall crane beams directly determine the construction safety and long-term operational stability of the powerhouse, with construction progress significantly impacting the overall project timeline. Addressing challenges such as complex cross-sections and high excavation difficulty in the rock wall crane beam construction at the Anhui Ningguo Pumped-Storage Power Station, this paper proposes a rapid excavation and support construction workflow tailored to the engineering geological conditions and project characteristics. The approach focuses on optimizing the zoned flowwork construction model, employing key technologies including efficient protective layer excavation and “two-way pre-crack blasting” for rock platform formation, complemented by advanced support techniques such as “grouting before rod insertion” for mortar anchors and rapid-setting anchoring for prestressed rods. These methods provide valuable references for similar pumped-storage power station rock wall crane beam construction projects.
| [1] |
董树荣. 广西南宁抽水蓄能电站岩壁吊车梁快速开挖支护施工技术[J]. 吉林水利, 2025, (10): 68-73. |
| [2] |
管建龙, 温剑, 王笃文. 复杂地质条件下地下厂房岩壁吊车梁精细化开挖及支护施工技术[J]. 四川水力发电, 2025, 44(04): 13-16. |
| [3] |
蒋明欢, 岑威钧, 王辉, 曹艺凡. 高地应力地下厂房岩壁吊车梁结构安全性分析[J]. 水电能源科学, 2023, 41(02): 145-149. |
| [4] |
陈强. 一种抽水蓄能电站地下厂房岩壁吊车梁部位开挖施工方法[J]. 价值工程, 2022, 41(30): 87-89. |
| [5] |
刘蕊, 余健. 清原抽水蓄能电站厂房岩壁吊车梁开挖质量控制技术[J]. 东北水利水电, 2021, 39(09): 19-21+53+71. |
/
| 〈 |
|
〉 |