PDF (1124K)
摘要
建筑工程中地基基础属于隐蔽性强、技术复杂的隐蔽工程,地基基础造价管理的好坏直接影响到整个项目的投资效益。但是由于地质条件的不确定性、勘察设计深度不够、施工变更频繁以及造价管理机制不健全等原因,地基基础造价超预算的现象时有发生。本文从地基基础造价控制的重要性入手,对超预算深层次原因进行分析,即前期调研不到位、设计方案优化不够、变更签证滞后、动态成本控制不到位等。在此基础上提出加强地质勘察、改进设计比选、严格变更审批、完善全过程造价动态监控等有针对性的措施,从源头上提高造价控制能力,给同类工程提供理论支持和实践参考。
Abstract
Foundation engineering in construction projects is a concealed work with strong concealment and complex technology. The quality of foundation cost management directly affects the investment benefit of the entire project. However, due to uncertainties in geological conditions, insufficient depth of survey and design, frequent construction changes, and inadequate cost management mechanisms, the phenomenon of foundation cost exceeding the budget occurs from time to time. This article starts with the importance of foundation cost control and analyzes the deep-seated reasons for exceeding the budget, namely inadequate preliminary research, insufficient optimization of design schemes, delayed change visas, and inadequate dynamic cost control. Based on this, targeted measures such as strengthening geological survey, improving design comparison and selection, strictly approving changes, and perfecting dynamic monitoring of the whole process cost are proposed. These measures aim to improve cost control ability from the source and provide theoretical support and practical reference for similar projects.
关键词
Key words
[Author(id=1330198335676289630, tenantId=1045748351789510663, journalId=1327662952484470822, articleId=1330198334837428803, orderNo=0, firstName=null, middleName=null, lastName=null, nameCn=null, orcid=null, stid=null, country=null, authorPic=null, dead=0, email=null, emailSecond=null, emailThird=null, correspondingAuthor=0, authorType=1, ext={EN=AuthorExt(id=1330198335735009888, tenantId=1045748351789510663, journalId=1327662952484470822, articleId=1330198334837428803, authorId=1330198335676289630, language=EN, stringName=Jinhu Wang, firstName=Jinhu, middleName=null, lastName=Wang, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=null, address=Middling Coal Jiangnan Construction Development Group Co., Ltd., Guangzhou, Guangdong, 510440, China, bio=null, bioImg=null, bioContent=null, aboutCorrespAuthor=null), CN=AuthorExt(id=1330198335785341537, tenantId=1045748351789510663, journalId=1327662952484470822, articleId=1330198334837428803, authorId=1330198335676289630, language=CN, stringName=王金虎, firstName=null, middleName=null, lastName=null, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=null, address=中煤江南建设发展集团有限公司, 中国·广东 广州 510440, bio={"content":"王金虎(1992-),男,中国河北张家口人,本科,工程师,从事地基与基础研究。
"}, bioImg=null, bioContent=王金虎(1992-),男,中国河北张家口人,本科,工程师,从事地基与基础研究。
, aboutCorrespAuthor=null)}, companyList=[AuthorCompany(id=1330198335596597850, tenantId=1045748351789510663, journalId=1327662952484470822, articleId=1330198334837428803, xref=null, ext=[AuthorCompanyExt(id=1330198335613375067, tenantId=1045748351789510663, journalId=1327662952484470822, articleId=1330198334837428803, companyId=1330198335596597850, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=Middling Coal Jiangnan Construction Development Group Co., Ltd., Guangzhou, Guangdong, 510440, China), AuthorCompanyExt(id=1330198335625957980, tenantId=1045748351789510663, journalId=1327662952484470822, articleId=1330198334837428803, companyId=1330198335596597850, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=中煤江南建设发展集团有限公司, 中国·广东 广州 510440)])])]
王金虎.
建筑工程地基基础项目造价超支问题及控制策略研究[J].
工程设计与施工, 2026, 8(7): 28-30 DOI:10.12349/edc.v8i7.11039
| [1] |
孙江月. 建筑工程地基基础造价超预算的原因及对策[J]. 散装水泥, 2026,(03): 188-190.
|
| [2] |
郭爱平. 建筑工程地基基础造价超预算的原因及对策[J]. 智能城市, 2020, 6(09): 108-109.
|
| [3] |
周群立. 建筑工程地基基础造价超预算的原因及控制研究[J]. 工程建设与设计, 2017,(02): 163-164.
|