EPC项目深化设计阶段质量风险识别及防控对策
Quality Risk Identification and Prevention Strategies during the Detailed Design Phase of EPC Projects
EPC项目把设计、采购、施工纳入同一责任链条,深化设计既承接施工图,又面向采购加工和现场安装。冶金项目建设中,工艺系统复杂、设备体量大、能源介质管线密集,建设单位需求、专业协同、设备选型、供货资料和现场条件等问题常在深化设计阶段集中显现。若总承包团队不能提前识别质量风险并形成闭环控制,图纸问题会传导至材料订货、构件加工、工序穿插和竣工验收。因此,本文基于冶金项目实践研究EPC项目深化设计阶段质量风险识别及防控做法,以供参考。
EPC projects integrate design, procurement, and construction into a unified responsibility chain. The detailed design phase not only supports construction drawings but also addresses procurement requirements, material processing, and on-site installation. In metallurgical project development, challenges such as complex process systems, large-scale equipment, and dense energy medium pipelines often emerge during the detailed design stage, particularly regarding client requirements, cross-disciplinary coordination, equipment selection, supply documentation, and site conditions. If the general contracting team fails to identify quality risks early and implement closed-loop control, design deficiencies can propagate to material ordering, component fabrication, workflow coordination, and final acceptance. This paper examines quality risk identification and mitigation strategies for the detailed design phase of EPC projects based on metallurgical project practices, providing actionable insights.
| [1] |
孙肖肖, 尹贻林. 基于层次分析法的EPC项目施工图设计阶段风险因素研究[J]. 天津理工大学学报, 2026(1). |
| [2] |
左庆强. EPC项目管理中的风险识别和应对策略[J]. 中文科技期刊数据库(文摘版)工程技术, 2024(002): 000. |
| [3] |
李月华. 探讨EPC总承包项目风险识别及管控措施[J]. 四川建材, 2023, 49(6): 234-236. |
| [4] |
陈崑. EPC建筑工程项目设计外部风险管理实践[J]. 福建建筑, 2025(7): 140-143. |
| [5] |
贾林昌, 孙孝伟, 郑鸿凯, |
| [6] |
陈癸武. EPC项目设计阶段管控探析[J]. 福建建筑, 2023(12): 133-136. |
/
| 〈 |
|
〉 |