基于ANP法的云南省河道治理工程设计阶段问题研究
Research on Problems in the Design Stage of River Training Projects in Yunnan Province Based on ANP
中小河流治理工程设计阶段常存在地质勘察不足、生态理念贯彻不到位及设计与实施脱节等问题,制约工程成效。本文基于霍尔三维结构模型,运用网络层次分析法(ANP)梳理问题网络,揭示勘察、设计、实施间的双向反馈关系。分析表明,勘察深度不足与设计能力薄弱为“驱动型”要素,设计方案缺乏系统考量与规划脱节则居于“中介”位置。据此提出加强勘察能力建设、构建全过程协同机制、切断反馈回路等系统化对策,以提升治理工程整体效能。
In designing small river training projects, issues like insufficient survey, weak ecological consideration, and design–construction gaps undermine effectiveness. Using ANP, we reveal bidirectional feedback among survey, design, and construction. Insufficient survey depth and weak design capacity are driving factors; lack of systematic design and planning disconnection are intermediary. Countermeasures include strengthening survey capacity, whole-process coordination, and cutting feedback loops to improve overall performance.
| [1] |
朱勇. 云南省中小河流治理地勘工作存在的问题及对策[J]. 中国水利, 2018,(14): 52-53. |
| [2] |
毛明雄. 生态理念融入中小河流治理工程设计[J]. 云南水力发电, 2023, 39(11): 13-17. |
| [3] |
闵凤阳, 黎礼刚, 王家生, |
| [4] |
李芬花, 纪昌明, 赵守和. 水利水电工程霍尔三维结构图的研究[J]. 水利水电技术, 2006, (12): 27-29.DOI: 10.13928/j.cnki.wrahe.2006.12.009 |
| [5] |
游涛, 吴雨晴, 李海交, |
/
| 〈 |
|
〉 |