通信工程内验超时率压降的QC实践与数智化路径

谢典 ,  唐慧敏 ,  刘毅亨 ,  梁启政 ,  李摇

信息科学与工程研究 ›› 2026, Vol. 7 ›› Issue (5) : 79 -81.

PDF (370KB)
信息科学与工程研究 ›› 2026, Vol. 7 ›› Issue (5) : 79 -81. DOI: 10.12349/iser.v7i5.10537

通信工程内验超时率压降的QC实践与数智化路径

作者信息 +

Quality Control Practices and Digitalization Paths for Reducing the Overdue Rate in Communication Engineering Testing

Author information +
文章历史 +
PDF (378K)

摘要

通信工程建设中,内验环节的及时性直接影响网络交付效率.本文以广州移动全运会站点建设为背景,运用问题解决型质量管理方法,针对内验超时率偏高问题开展攻关实践.通过现状调查锁定室分网站点为问题症结,系统分析识别出验收任务分配不合理,标准化作业指导书缺失,巡检管控机制缺位三个要因,并针对性实施网调智能中枢建设,标准化流程机制建立,巡检管控机制完善三项对策.实践表明,全运会站点内验超时率从48.76%降至18.29%,成效显著.本文经验可为通信运营商工程质量管理提供参考。

Abstract

In communication engineering construction, the timeliness of the internal inspection process directly affects the efficiency of network delivery. This paper takes the construction of the Guangzhou Mobile Olympic Games sites as the background and uses problem- solving quality management methods to conduct a practical investigation on the issue of high internal inspection timeout rates. Through a current situation survey, the indoor distribution site is identified as the problem point. System analysis reveals three causes: unreasonable allocation of acceptance tasks, the absence of standardized operation guidelines, and the absence of inspection control mechanisms. Three countermeasures, namely the construction of the network monitoring intelligent center, the establishment of standardized process mechanisms, and the improvement of inspection control mechanisms, are implemented in a targeted manner. The results show that the internal inspection timeout rate for the Olympic Games sites has decreased from 48.76% to 18.29%, achieving significant results. The experience in this paper can provide a reference for the engineering quality management of communication operators.

关键词

通信工程 / 内验 / 质量管理 / 数智化

Key words

communication engineering / internal audit / quality management / digitalization

引用本文

引用格式 ▾
谢典,唐慧敏,刘毅亨,梁启政,李摇. 通信工程内验超时率压降的QC实践与数智化路径[J]. 信息科学与工程研究, 2026, 7(5): 79-81 DOI:10.12349/iser.v7i5.10537

登录浏览全文

4963

注册一个新账户 忘记密码

参考文献

[1]

桑维, 谭纪振, 谭颖芳. 新基建背景下通信工程项目全生命周期的协同管理模式创新[J]. 智能系统与工程研究, 2025, 6(9).

[2]

中国质量协会. 质量管理小组活动准则(T/CAQ 10201—2020)[S]. 北京: 中国标准出版社, 2020.

[3]

刘大洋. 数字孪生无线网智能优化系统研发与应用[J]. 移动通信, 2024, 48(3): 45-52.

AI Summary AI Mindmap
PDF (370KB)

0

访问

0

被引

详细

导航
相关文章

AI思维导图

/

〈 〉