油田地面工程建设施工管理难点与对策分析

作者信息 +

Analysis of Challenges and Countermeasures in Construction Management for Oilfield Surface Engineering Projects

Author information +
文章历史 +
PDF (1383K)

摘要

油田地面工程建设施工管理因多专业交叉、环境复杂、工期紧张而难度突出.本研究以某油田产能建设工程为例,剖析了现场协调不畅导致资源调配冲突、质量安全监管薄弱造成隐患漏检、工期与成本脱节引发进度滞后与费用超支等难点.从构建信息化统筹调度平台实现资源智能分配、完善全过程质量安全监督体系推行网格化管理、建立动态进度成本联动模型实施滚动纠偏等方面提出对策.应用结果显示,资源利用率提高25%,质量问题整改周期缩短40%,工期达成率升至95%,成本节约达8%.

Abstract

The construction management of oilfield surface engineering is difficult due to the intersection of multiple specialties, complex environment, and tight schedule. This study takes a production capacity construction project in a certain oilfield as an example to analyze the difficulties caused by poor on-site coordination leading to resource allocation conflicts, weak quality and safety supervision resulting in hidden dangers and missed inspections, and the disconnect between construction period and cost leading to schedule delays and cost overruns. Propose countermeasures from the aspects of building an information-based integrated scheduling platform to achieve intelligent resource allocation, improving the quality and safety supervision system throughout the entire process, promoting grid management, establishing a dynamic schedule cost linkage model, and implementing rolling correction. The application results show that the resource utilization rate has increased by 25%, the quality problem rectification cycle has been shortened by 40%, the completion rate of the project has increased to 95%, and the cost savings have reached 8%.

关键词

油田地面工程 / 施工管理 / 难点分析 / 对策 / 信息化管理

Key words

oilfield surface engineering / construction management / difficulty analysis / countermeasures / information management

引用本文

引用格式 ▾
轩诗贺. 油田地面工程建设施工管理难点与对策分析[J]. 信息科学与工程研究, 2026, 7(7): 70-72 DOI:10.12349/iser.v7i7.11412

登录浏览全文

4963

注册一个新账户 忘记密码

参考文献

[1]

彭松. 油田地面工程基建项目施工质量控制与管理研究[J]. 中国石油和化工标准与质量, 2026, 46(11): 28-30.

[2]

包铁龙, 何冬强. 油田地面工程施工的质量监督管理[J]. 全面腐蚀控制, 2025, 39(8): 201-203.

[3]

朱富有. 关于油田地面工程施工阶段安全质量管理标准化的思考[J]. 中国石油和化工, 2024,(8): 53-54.

[4]

陆健. 油田地面工程建设施工管理研究[J]. 化工设计通讯, 2023, 49(8): 26-28.

[5]

任昊天, 孟琪. 油田地面工程施工管理存在的问题与对策研究[J]. 中国石油和化工标准与质量, 2023, 43(14): 71-73.

AI Summary AI Mindmap
PDF (1351KB)

9

访问

0

被引

详细

导航
相关文章

AI思维导图

/

〈 〉