摘要
近年来随着铁路建设大面积开展,铁路工程项目陆续开工、开建,一大批重点、难点等复杂工程随之而来,如新线引入、站场改造、穿跨越铁路等工程施工时间长、工艺复杂、施工结合部多,施工组织困难,存在不小的安全隐患,对运输影响较大。施工计划是施工单位排摆生产任务、实施现场作业的重要依据,对复杂工程而言,由于施工工期长、施工节点多、影响范围广,编制准确、可行的施工计划难度很大。施工计划的质量高低,不仅影响施工进度,还关系到施工安全、运输秩序,本文就如何提高铁路复杂工程施工计划编制工作进行探讨,以实现施工计划的准确性、可行性,为现场作业安全夯实基础,减少对运输的影响,实现双赢。
Abstract
In recent years, with the large-scale development of railway construction, a series of railway projects have been initiated and under construction. A large number of key and challenging complex projects have emerged, such as new line introductions, station renovations, and crossing railways. These projects are characterized by long construction periods, complex processes, numerous construction interfaces, and difficulties in organizing construction, posing significant safety risks and substantial impacts on transportation. Construction plans serve as crucial references for construction units to schedule production tasks and implement on-site operations. For complex projects, due to their extended construction periods, numerous construction milestones, and wide-ranging impacts, it is extremely difficult to develop accurate and feasible construction plans. The quality of construction plans not only affects construction progress but also relates to construction safety and transportation order. This paper discusses how to improve the preparation of construction plans for complex railway projects, aiming to enhance the accuracy and feasibility of construction plans, lay a solid foundation for on-site operation safety, reduce the impact on transportation, and achieve a win-win situation.
关键词
Key words
[Author(id=1322230351179805344, tenantId=1045748351789510663, journalId=1253638333294477479, articleId=1322222830704312423, orderNo=0, firstName=null, middleName=null, lastName=null, nameCn=null, orcid=null, stid=null, country=null, authorPic=null, dead=0, email=null, emailSecond=null, emailThird=null, correspondingAuthor=0, authorType=1, ext={EN=AuthorExt(id=1322230351234331298, tenantId=1045748351789510663, journalId=1253638333294477479, articleId=1322222830704312423, authorId=1322230351179805344, language=EN, stringName=Guibin Xu, firstName=Guibin, middleName=null, lastName=Xu, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=null, address=China Railway Shenyang Bureau Group Construction Management Office, Shenyang, Liaoning, 110001, China, bio=null, bioImg=null, bioContent=null, aboutCorrespAuthor=null), CN=AuthorExt(id=1322230351280468643, tenantId=1045748351789510663, journalId=1253638333294477479, articleId=1322222830704312423, authorId=1322230351179805344, language=CN, stringName=徐桂彬, firstName=null, middleName=null, lastName=null, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=null, address=中国铁路沈阳局集团公司 施工管理办公室, 中国·辽宁 沈阳 110001, bio={"content":"徐桂彬(1982-),男,中国辽宁大石桥人,本科,工程师,从事铁路运输专业或调度指挥或铁路施工计划研究。
"}, bioImg=null, bioContent=徐桂彬(1982-),男,中国辽宁大石桥人,本科,工程师,从事铁路运输专业或调度指挥或铁路施工计划研究。
, aboutCorrespAuthor=null)}, companyList=[AuthorCompany(id=1322230351104307868, tenantId=1045748351789510663, journalId=1253638333294477479, articleId=1322222830704312423, xref=null, ext=[AuthorCompanyExt(id=1322230351121085085, tenantId=1045748351789510663, journalId=1253638333294477479, articleId=1322222830704312423, companyId=1322230351104307868, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=China Railway Shenyang Bureau Group Construction Management Office, Shenyang, Liaoning, 110001, China), AuthorCompanyExt(id=1322230351133667998, tenantId=1045748351789510663, journalId=1253638333294477479, articleId=1322222830704312423, companyId=1322230351104307868, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=中国铁路沈阳局集团公司 施工管理办公室, 中国·辽宁 沈阳 110001)])])]
徐桂彬.
试论如何提高铁路复杂工程施工计划编制工作[J].
公共交通与建设, 2025, 4(2): 70-72 DOI:10.12349/ptc.v4i2.5565
| [1] |
黄成峰, 鲍学英, 班新林, 等. 铁路工程接口工序工期匹配研究[J]. 铁道学报, 2024, 46(02): 195-204.
|
| [2] |
解亚龙, 刘红良, 李祯怡, 等. 铁路工程施工组织智能化提升关键技术研究与应用[J]. 铁道建筑, 2022, 62(05): 18-22+35.
|
| [3] |
邬丹. 铁路施工组织与概预算[M]. 化学工业出版社: 202007. 229.
|