高速公路建设全生命周期管理的关键节点与治理逻辑研究
Research on key nodes and Governance Logic of life cycle management of Expressway Construction
高速公路建设作为国家基础设施体系中资金密度高、参与主体复杂、治理周期跨度大的典型工程,其全生命周期管理能力直接影响区域交通供给效率、社会经济流转速度与资产价值长期保持能力。本文主要围绕高速公路建设的全生命周期特征,从阶段结构、关键节点识别、跨阶段治理逻辑与数字化工具体系四个方面展开分析,并构建“价值识别-技术治理-制度闭环-信息回流”的系统框架,以期为高速公路项目治理提供理论参考与工程启示。
as a typical project with high capital density, complex participants and large governance cycle span in the national infrastructure system, the full life cycle management ability of expressway construction directly affects the regional transportation supply efficiency, social and economic circulation speed and long-term asset value maintenance ability. This paper mainly focuses on the characteristics of the whole life cycle of highway construction, analyzes from four aspects: stage structure, key node identification, cross stage governance logic and digital tool system, and constructs the system framework of “value identification - Technology Governance - system closed loop - information return”, in order to provide theoretical reference and engineering enlightenment for highway project governance.
| [1] |
游小聪, 张佳琦, 雷跃川. 关于高速公路建设企业绩效考核体系建设的思考[J]. 财务与会计, 2019,(14): 82-83. |
| [2] |
马书红, 王元庆, 岳敏, |
| [3] |
孙付春. “双碳”背景下零碳高速公路建设探索与实践[J]. 公路, 2024, 69(12): 433-439. |
| [4] |
熊伟, 肖一鸣, 米日努尔·麦麦提江. 高速公路建设促进共同富裕的效能与机制[J]. 同济大学学报(自然科学版), 2025, 53(1): 151-158. |
| [5] |
曾俊伟, 闫浩, 钱勇生, |
/
| 〈 |
|
〉 |