特大型山地城市轨道交通 PPP 项目运营期绩效管控指标体系研究

龚俊 ,  蔡燕林

公共交通与建设 ›› 2026, Vol. 5 ›› Issue (2) : 23 -25.

PDF (1099KB)
公共交通与建设 ›› 2026, Vol. 5 ›› Issue (2) : 23 -25. DOI: 10.12349/ptc.v5i2.10462

特大型山地城市轨道交通 PPP 项目运营期绩效管控指标体系研究

作者信息 +

Research on Performance Management and Control Index System of Extra-large Mountainous City Urban Rail Transit PPP Projects During Operation Period

Author information +
文章历史 +
PDF (1124K)

摘要

随着城市轨道交通PPP模式规模化应用,运营期绩效评价已成为保障服务质量、提升公共资源配置效率的关键抓手。针对 特大型山地城市轨道交通地形复杂、客流波动显著、管控维度多元等特征,以重庆轨道交通PPP项目为案例,构建涵盖产 出、效果、管理三大维度的运营绩效评价指标体系。体系设置产出80分、效果10分、管理10分的一级指标权重,下设8项二 级指标与45项三级指标,涵盖正点率、设施可靠度、投诉率、安全管控等核心内容,并明确各指标数据来源、量化标准与 采集方式。该体系贴合山地城市轨道交通运营特性,可为同类山地城市轨道交通PPP项目绩效管控提供标准化范式,也为 政府履约监管与付费机制优化提供量化支撑。

Abstract

With the large-scale application of the Public-Private Partnership (PPP) model in urban rail transit, performance evaluation during the operation period has become a key measure to ensure service quality and improve the allocation efficiency of public resources. In view of the characteristics of rail transit in extra-large mountainous cities, such as complex terrain, significant passenger flow fluctuation and diversified management and control dimensions, this paper takes the PPP project of Chongqing Rail Transit as a case study to construct an operation performance evaluation index system covering three dimensions of output, effect and management. The system sets the weight of first-level indicators as 80 points for output, 10 points for effect and 10 points for management, and is composed of 8 second-level indicators and 45 third-level indicators, covering core contents such as on-time rate, facility reliability, complaint rate and safety management and control. In addition, the data source, quantitative standard and collection method of each indicator are clearly defined. This system conforms to the operation characteristics of rail transit in mountainous cities, and can provide a standardized paradigm for performance management and control of similar PPP projects of rail transit in mountainous cities, as well as quantitative support for government performance supervision and payment mechanism optimization.

关键词

城市轨道交通 / 特大型山地城市 / 绩效管控 / PPP项目

Key words

urban rail transit / extra-large mountainous city / performance assessment / PPP project

引用本文

引用格式 ▾
龚俊,蔡燕林. 特大型山地城市轨道交通 PPP 项目运营期绩效管控指标体系研究[J]. 公共交通与建设, 2026, 5(2): 23-25 DOI:10.12349/ptc.v5i2.10462

登录浏览全文

4963

注册一个新账户 忘记密码

参考文献

[1]

刘祖容, 谢玉美, 肖志涵. 城市轨道交通PPP项目运营期绩效评价研究——以徐州地铁1号线为例[J]. 项目管理技术, 2024, 22(07):51-58.

[2]

宗君振. 城市轨道交通PPP项目绩效评价研究[D]. 西南交通大学, 2018.

[3]

王银梅. 基于知识生产函数的高校科研绩效评价研究[D]. 华北电力大学(北京), 2023.

AI Summary AI Mindmap
PDF (1099KB)

0

访问

0

被引

详细

导航
相关文章

AI思维导图

/

〈 〉