市域郊铁路高架区间挂篮悬臂浇筑施工技术应用研究
Research on the Application of Construction Techniques for Cantilever Cast-in-Situ Concrete Structures in Elevated Sections of Suburban Railway Lines
Addressing the challenging construction conditions of elevated sections in suburban railway projects, this study examines the application of hanging basket cantilever casting in structural design, process control, and quality/safety monitoring through a specific case. Results demonstrate that this technique reduced project duration from 120 days to 90 days, lowered costs from 5 million yuan to 4.5 million yuan, achieved a 98% compliance rate for beam profile deviations, and maintained a 100% pass rate for concrete strength tests, demonstrating excellent efficiency and quality control performance.
| [1] |
盖春阳. 连续梁挂篮施工技术在铁路工程中的应用[J]. 工程建设与设计, 2025,(22):127-129. |
| [2] |
陈国旺. 悬臂挂篮技术在桥梁施工中的运用[J]. 工程建设与设计, 2024,(24):169-171. |
| [3] |
罗生宏. 智能悬臂造梁机应用研究及发展探索[J]. 铁道建筑, 2025, 65(10):103-109. |
| [4] |
索晓华. 梁柱支架组合支撑体系在某市域(郊)铁路现浇连续箱梁施工中的应用[J]. 工程建设与设计, 2025,(22):62-64. |
| [5] |
刘小光, 祁超贤, 侯炜, 张富华, 闵林涛. 悬臂施工连续梁拱组合体系安全性分析[J]. 西部交通科技, 2024,(12):124-127. |
/
| 〈 |
|
〉 |