轨道交通工程建设全过程进度与质量协同管理研究

杨燚

工程研究前沿 ›› 2026, Vol. 3 ›› Issue (2) : 8 -10.

PDF (1028KB)
工程研究前沿 ›› 2026, Vol. 3 ›› Issue (2) : 8 -10. DOI: 10.12349/foer.v3i2.9102

轨道交通工程建设全过程进度与质量协同管理研究

作者信息 +

Research on the Progress and Quality Coordinated Management of the Entire Process of Rail Transit Engineering Construction

Author information +
文章历史 +
PDF (1051K)

摘要

轨道交通工程机电系统建设具有专业交叉密集、工序衔接复杂、接口条件多变等特点,其进度管理与质量管理之间呈现高度耦合关系。在建设实践中,进度目标与质量要求若缺乏协同统筹,易引发返工、延误及系统运行隐患。本文围绕轨道交通机电工程建设全过程,系统分析施工准备、安装实施、调试联动等阶段进度管理与质量控制的关键内容,梳理机电设备材料控制、安装调试管理及系统接口协调中的典型问题,通过构建进度质量一体化管理机制、强化关键工序协同控制、引入信息化管理手段,有助于实现轨道交通机电工程建设进度受控与质量可靠的双重目标,为类似工程项目管理提供参考。

Abstract

The construction of electromechanical systems in rail transit engineering is characterized by intensive interdisciplinary integration,complex process coordination,and highly variable interface conditions,resulting in a strong coupling between schedule management and quality management.In practical construction,insufficient coordination between schedule objectives and quality requirements can easily lead to rework,delays,and potential operational risks.Focusing on the whole construction process of rail transit electromechanical engineering,this paper systematically analyzes the key aspects of schedule management and quality control during the stages of construction preparation,installation implementation,and system commissioning and integration.Typical issues in equipment and material control,installation and commissioning management,and system interface coordination are examined.By establishing an integrated schedule-quality management mechanism,strengthening collaborative control of critical processes,and introducing information-based management approaches,the dual objectives of controlled construction progress and reliable quality in rail transit electromechanical engineering can be achieved,providing reference for the management of similar engineering projects.

关键词

轨道交通 / 机电工程 / 进度管理 / 质量管理 / 协同控制

Key words

Rail transit / Electromechanical engineering / Schedule management / Quality management / Collaborative control

引用本文

引用格式 ▾
杨燚. 轨道交通工程建设全过程进度与质量协同管理研究[J]. 工程研究前沿, 2026, 3(2): 8-10 DOI:10.12349/foer.v3i2.9102

登录浏览全文

4963

注册一个新账户 忘记密码

参考文献

[1]

吴卓蔓. 轨道工程施工中绿色施工技术的创新与应用探索[J]. 建设机械技术与管理, 2025, 38(06):144-146.

[2]

郭丽华. 优化轨道交通项目工程建设资金监管的六大措施[J]. 中国商界, 2025,(23):246-248.

[3]

彭正杰. 轨道交通工程建设安全风险监控方法研究[J]. 甘肃科技, 2025, 41(11):61-64.

[4]

宋奇瑶. 中国轨道交通工程项目的进度管理问题研究[D]. 导师:张尚. 苏州科技大学, 2019.

AI Summary AI Mindmap
PDF (1028KB)

0

访问

0

被引

详细

导航
相关文章

AI思维导图

/