PDF (1400K)
摘要
建筑工程项目在实施过程中涉及多环节、多参与方,成本控制贯穿于项目全周期管理的核心环节。有效的成本控制策略不仅关系到项目的经济效益,还直接影响企业的市场竞争力与可持续发展能力。本文从成本控制的重要意义出发,系统分析了建筑工程中设计、施工与结算各阶段的成本影响因素与控制关键点,构建了以制度保障、流程规范、动态监控和绩效反馈为核心的成本控制体系。在此基础上,提出针对不同阶段的管控路径,包括优化设计方案、强化施工组织、规范结算流程等策略,以期为建筑工程项目管理提供可行的理论依据与实践参考,促进工程建设管理水平的全面提升,实现成本控制与工程质量、安全、进度等多目标协同。
Abstract
Construction projects involve multiple phases and stakeholders during implementation, with cost control serving as the core element throughout the entire lifecycle management. Effective cost control strategies not only impact project economic benefits but also directly influence corporate market competitiveness and sustainable development capabilities. Starting from the significance of cost control, this paper systematically analyzes cost influencing factors and key control points in design, construction, and settlement phases of construction projects. A cost control system is established with institutional safeguards, process standardization, dynamic monitoring, and performance feedback at its core. Based on this framework, it proposes phased control strategies including optimized design solutions, enhanced construction organization, and standardized settlement procedures. These efforts aim to provide practical theoretical foundations and operational references for construction project management, promoting comprehensive improvement in engineering management levels while achieving synergistic coordination among cost control, quality assurance, safety, and schedule optimization.
关键词
Key words
[Author(id=1302700241817338747, tenantId=1045748351789510663, journalId=1253638557643604139, articleId=1302683728334193344, orderNo=0, firstName=null, middleName=null, lastName=null, nameCn=null, orcid=null, stid=null, country=null, authorPic=null, dead=0, email=null, emailSecond=null, emailThird=null, correspondingAuthor=0, authorType=1, ext={EN=AuthorExt(id=1302700241876059008, tenantId=1045748351789510663, journalId=1253638557643604139, articleId=1302683728334193344, authorId=1302700241817338747, language=EN, stringName=Huawei Zhang, firstName=Huawei, middleName=null, lastName=Zhang, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=null, address=Yutong Engineering Management Co., Ltd. , Zhengzhou, Henan, 450006, China, bio=null, bioImg=null, bioContent=null, aboutCorrespAuthor=null), CN=AuthorExt(id=1302700241922196354, tenantId=1045748351789510663, journalId=1253638557643604139, articleId=1302683728334193344, authorId=1302700241817338747, language=CN, stringName=张华伟, firstName=null, middleName=null, lastName=null, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=null, address=豫通工程管理有限公司 , 中国·河南 郑州 450006, bio={"content":"张华伟(1976-),男,中国河南许昌人,本科,中级经济师、工程师,从事建筑成本控制和工程质量研究。
"}, bioImg=null, bioContent=张华伟(1976-),男,中国河南许昌人,本科,中级经济师、工程师,从事建筑成本控制和工程质量研究。
, aboutCorrespAuthor=null)}, companyList=[AuthorCompany(id=1302700241750229878, tenantId=1045748351789510663, journalId=1253638557643604139, articleId=1302683728334193344, xref=null, ext=[AuthorCompanyExt(id=1302700241762812791, tenantId=1045748351789510663, journalId=1253638557643604139, articleId=1302683728334193344, companyId=1302700241750229878, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=Yutong Engineering Management Co., Ltd. , Zhengzhou, Henan, 450006, China), AuthorCompanyExt(id=1302700241775395704, tenantId=1045748351789510663, journalId=1253638557643604139, articleId=1302683728334193344, companyId=1302700241750229878, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=豫通工程管理有限公司 , 中国·河南 郑州 450006)])])]
张华伟.
建筑工程项目成本控制策略研究[J].
经济与产业发展, 2025, 02(04): 42-44 DOI:10.12349/ecin.v2i4.6812
| [1] |
周志慧. 工程项目全生命周期成本控制策略[J]. 大众投资指南, 2025,(17): 134-136.
|
| [2] |
刘俊滟. 建筑工程项目财务预算与实际成本控制策略研究[J]. 财讯, 2025,(06): 28-30.
|
| [3] |
刘善龙. 建筑工程项目成本管理与控制策略研究[J]. 鞍山师范学院学报, 2025, 27(01): 50-54.
|
| [4] |
杨建. 建筑工程项目管理中的成本控制策略研究[J]. 居业, 2024,(12): 155-157.
|