|
[1] 唐碧秋,许仕铭,邹洋,等.基于GCA-TOPSIS的装配式建筑建造成本影响因素研究[J].混凝土,2024(5):135-141. Tang Biqiu, Xu Shiming, Zou Yang, et al. Research on influencing factors of construction cost of prefabricated buildings based on GCA-TOPSIS[J]. Concrete, 2024(5):135-141. [2] 刘瑶,宋红,徐沛.基于AHP-熵权法的装配式建筑成本影响因素研究[J].建筑经济,2023,44(S1):150-154. Liu Yao, Song Hong, Xu Pei. Research on influencing factors of prefabricated building cost based on AHP-entropy weight method[J]. Construction Economics, 2023,44(S1):150-154. [3] 罗祥,黄喜兵.基于ISM的装配式建筑成本控制研究[J].建筑经济,2021,42(11):73-77. Luo Xiang, Huang Xibing. Research on cost control of prefabricated buildings based on ISM[J]. Construction Economics, 2021,42(11):73-77. [4] 杨柳荣.基于BIM技术的装配式建筑全过程造价控制研究[J].工程抗震与加固改造,2025,47(2):203. Yang Liurong. Research on whole-process cost control of prefabricated buildings based on BIM technology[J]. Earthquake Resistant Engineering and Retrofitting, 2025,47(2):203. [5] 申琪玉,李杰杰.基于不同装配率的装配式混凝土建筑投资估算指标差异与影响因素研究[J].建筑经济,2021,42(S1):181-185. Shen Qiyu, Li Jiejie. Research on differences and influencing factors of investment estimation indicators for prefabricated concrete buildings with different assembly rates[J]. Construction Economics, 2021,42(S1):181-185. [6] 林申正,罗恒勇.BIM技术和神经网络相融合的装配式建筑成本控制研究[J].建筑经济,2021,42(2):86-89. Lin Shenzheng, Luo Hengyong. Research on cost control of prefabricated buildings integrating BIM technology and neural network[J]. Construction Economics, 2021,42(2):86-89. [7] 李丽红,李广新,雷云霞,等.人材机价格波动对装配式建筑构件造价的影响研究——以沈阳市为例[J].建筑经济,2019,40(8):81-84. Li Lihong, Li Guangxin, Lei Yunxia, et al. Research on the impact of price fluctuations of labor, materials and machinery on the cost of prefabricated building components——Taking Shenyang as an example[J]. Construction Economics, 2019,40(8):81-84. [8] 王林峰,刘云,亓彦珣,等.基于IPSO-LSSVR算法的变电站工程造价预测方法[J].沈阳工业大学学报,2025,47(2):168-175. Wang Linfeng, Liu Yun, Qi Yanjun, et al. Substation project cost prediction method based on IPSO-LSSVR algorithm[J]. Journal of Shenyang University of Technology, 2025,47(2):168-175. [9] 金季岚.基于马尔科夫链的建筑工程造价预测模型[J].兵工自动化,2024,43(9):32-35. Jin Jilan. Construction project cost prediction model based on Markov chain[J]. Ordnance Industry Automation, 2024,43(9):32-35. [10] 邓宇轩.基于自适应PSO-BP神经网络的城轨造价预测研究[J].建筑经济,2023,44(S1):92-96. Deng Yuxuan. Research on urban rail cost prediction based on adaptive PSO-BP neural network[J]. Construction Economics, 2023,44(S1):92-96. [11] 谢金豪,刘文昌.基于GA-BP神经网络的建筑工程造价预测研究[J].建筑经济,2022,43(S1):235-240. Xie Jinhao, Liu Wenchang. Research on construction project cost prediction based on GA-BP neural network[J]. Construction Economics, 2022,43(S1):235-240. [12] 鲁淑霞,田如娜.结构化加权最小二乘支持向量机[J].计算机科学,2013,40(12):52-54. Lu Shuxia, Tian Runa. Structured weighted Least Squares Support Vector Machine[J]. Computer Science, 2013,40(12):52-54. [13] Zougab N,Adjabi S,Kokonendji C C.Bayesian estimation of adaptive bandwidth matrices in multivariate kernel density estimation[J].Computational Statistics & Data Analysis,2014,75:28-38. [14] Wandmp,Jonesmc.Kernelsmoothing[M].Boca Rtona:Chemical Rubber Company Press,1994. [15] 贾科,杨哲,魏超,等.基于斯皮尔曼等级相关系数的新能源送出线路纵联保护[J].电力系统自动化,2020,44(15):103-111. Jia Ke, Yang Zhe, Wei Chao, et al. Pilot protection for renewable energy transmission lines based on Spearman rank correlation coefficient[J]. Automation of Electric Power Systems, 2020,44(15):103-111. [16] Abdulrab H,Hussin F A,Ismail I,et al.Energy efficient optimal deployment of industrial wireless mesh networks using transient trigonometric Harris Hawks optimizer[J].Heliyon,2024,10(7):e28719. [17] 李寿德.一种新的单纯形法—最大最小法[J].青海师专学报,1992(4):54-58. Li Shoude. A new simplex method—Max-min method[J]. Journal of Qinghai Junior Teachers‘ College, 1992(4):54-58. [18] 胡山,朱向华.基于ResNet18与K折交叉验证的电机轴承故障诊断[J].自动化与仪表,2025,40(4):40-45. Hu Shan, Zhu Xianghua. Motor bearing fault diagnosis based on ResNet18 and K-fold cross-validation[J]. Automation & Instrumentation, 2025,40(4):40-45. [19] 刘春茂,郝倩,张云岗.基于PSO-LSSVM的网络流量预测[J].微型电脑应用,2016,32(5):27-30. Liu Chunmao, Hao Qian, Zhang Yungang. Network traffic prediction based on PSO-LSSVM[J]. Microcomputer Applications, 2016,32(5):27-30. [20] 王璜瑞,汪伟,祁云,等.基于CPO-LSSVM的煤层底板突水量等级预测模型[J].沈阳理工大学学报,2025,44(5):82-88. Wang Huangrui, Wang Wei, Qi Yun, et al. Prediction model of coal seam floor water inrush volume grade based on CPO-LSSVM[J]. Journal of Shenyang Ligong University, 2025,44(5):82-88. [21] 马亮.改进北方苍鹰优化LSSVM的高程异常拟合算法[J].地理空间信息,2025,23(3):18-21. Ma Liang. Elevation anomaly fitting algorithm using improved northern goshawk optimization for LSSVM[J]. Geospatial Information, 2025,23(3):18-21.
|